Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT B LRE-O 6-24-87 1B ROSBEL ALMAZAN New 1 ,200 Single-family dwelling unit over 1 ,200 sq ft private use attached garage 12730 HWY 82, Carbondale 239327 400027 1) ALL WORK SHALL COMPLY WITH THE 2015 INTERNATIONAL RESIDENTIAL CODE (I.R.C.)AND 2018 I NTERNATIONAL ENERGY CONSERVATION CODE (I.E.C.C.) 2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED "GARFIELD COUNTY BUILDING REOUIREMENTS". NUMBER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) ELECTRTCAL PERMITT|NG AND TNSPECTTONS BY COLORADO STATE ELECTRTC BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINALAPPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. 4) ALL EXTERTOR LIGHTING TO BE DOWNCAST AND SHIELDED. 5) WILDFIRE MITIGATION RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE RECOMMENDATIONS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT. PLEASE REFER TO THE GARFIELD COUNry COMMUNIry DEVELOPMENT WEBSITE FOR ADDITIONAL I N FORMATION. 6) OPEN HOLE SOTLS REPORT rS REOUTRED AT FOOTTNG TNSPECTTON AND PR|OR TO ANY CONCRETE POUR, SHALL INCLUDE COMPACTION REPORT IF ANY STRUCTURAL FILL. PROVIDE COPY OF GEOTECHNICAL ENGINEERS REPORT TO THE BUILDING INSPECTOR. 3,000 PSF soil bearing. 7) CONSTRUCTTON FENCTNG / SrLT FENCTNG / EROSTON CONTROL MEASURES TO BE TNSTALLED PR|OR TO COMMENCING CONSTRUCTION (AND INSTALLATION MAINTAINED THROUGHOUT LIFE OF CONSTRUCTION). TO BE VERIFIED AT FOOTING INSPECTION. 8) SEE COMMUNIry DEVELOPMENT DEPT LETTER DATED JULY 1 9,2024 REGARDTNG ZONE VARTANCE APPROVAL. ALL ZONE VARIANCE CONDITIONS SHALL BE MET. 9) MUST NOT REMOVE VEGETATTON FROM 3s FT RTPARTAN ZONE 10) CONDITION OF PERMIT: NO WORK MAY OCCUR lN THE 35-FT MINIMUM SETBACK FROM THE ryPICAL AND ORDINARY HIGH WATER MARK PER GARFIELD COUNTY LAND USE & DEVELOPMENT CODE, SECTION 7.203. MAPPING AND FIELD STAKING OF HIGH WATER MARK SHALL BE PROVIDED BY A LICENSED SURVEYOR, PROFESSIONAL ENGINEER OR OTHER OUALIFIED CONSULTANT BEFORE ANY WORK IN THIS AREA IS ALLOWED. 1 1 ) A LOT TMPROVEMENT CERT|F|CATE, SEALED BY A COLORADO LTCENSED SURVEYOR, lS TO BE PREPARED AT FOUNDATION INSPECTION TO VERIFY STRUCTURE IS IN COMPLIANCE WITH MINIMUM SETBACK REOUIREMENTS. LOT IMPROVEMENT CERTIFICATE MUST BE SUBMITTED TO COMMUNITY DEVELOPMENT DEPARTMENT PRIOR TO SCHEDULING A FRAMING INSPECTION. 12) SEPTIC SYSTEM APPROVALS: PRIOR TO BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY PROVIDE FINAL APPROVAUSIGN-OFF FROM GARFIELD COUNTY'S PUBLIC HEALTH DEPT. 13) BLOWER DOOR TEST tS REOUTRED. MUST SUBMTT BLOWER DOOR TEST REPORT TO GARFTELD COUNTY COMMUNIry DEVELOPMENT DEPT. OFFICE PRIOR TO SCHEDULING FINAL BUILDING INSPECTION / C.O. FINAL. 14) PRESCR|PIVE PATH USrNG 2018 rECC TABLE R402.1.2 rS CHOSEN FOR ENERGY COMPLIANCE OF THIS HOME DESIGN. MANUAL J WRIGHTSOFT REPORT ALSO ATTACHED FOR REFERENCE. ALL NEW HOMES TO HAVE WHOLE-HOUSE MECHANICAL VENTILATION SYSTEM INSTALLED (2015 IRC TABLE m1507.3.3(1)AND (2) SHOWN ON COVER SHEET. N $