Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLRE-05-24-8725 HEATHER BEATTIE (KIRK) PROPOSED NEW 850 SO FT Accessory Dwelling Unit (ADU) use issued under the adopted 2018 IECC and 2015 IRC; ADU to be erected inside the unheated steel barn with non-habitable garage storage building issued under the earlier separate BLRE-06-23-8171. 631 CR 321, Rifle Brock Subdivision, Lot 1 -217719200490 1)ALL WORK SHALL COMPLYWITH THE 2015 INTERNATIONAL RESIDENTIAL CODE (I.R.C.)AND 2018 INTERNATIONAL ENERGY CONSERVATION CODE (I.E.C.C.) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED "GARFIELD COUNTY BUILDING REOUIREMENTS". NUMBER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. ALL EXTERIOR LIGHTING TO BE DOWNCAST AND SHIELDED. WILDFIRE MITIGATION RECOMMENDATIONS: SHALL COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE RECOMMENDATIONS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COMMUNITY DEVELOPMENT WEBSITE FOR ADDITIONAL I N FORMATION. SEPTIC SYSTEM REVIEW / APPROVALS: PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY PROVIDE FINAL APPROVAL /SIGN-OFF FROM GARFIELD COUNTY'S PUBLIC HEALTH DEPT. BIOWER DOOR TEST IS REOUIRED FOR THE ADU (ACCESSORY DWELLING UNIT OCCUPANCY AREA). M UST SUBM IT BLOWER DOOR TEST REPORT TO GARFI ELD COUNTY COMM UN ITY DEVELOPMENT DEPT. OFFICE PRIOR TO SCHEDULING FINAL BUILDING INSPECTION / C.O. FINAL. PRESCRIPTIVE PATH REFERENCING RESCHECK REPORT IS CHOSEN FOR ENERGY COMPLIANCE OF THE ADU. SEE ATTACHED MANUAL J COOL CALCS REPORT, ALL NEW HOMES TO HAVE WHOLE- HOUSE MECHANICAL VENTIIATION SYSTEM INSTALLED (2015 IRC TABLE m1 507.3.3(1 ) AND (2)AS STAMPED ON THE FIELD COPY. NO SUBMISSION OF ANY STRUCTURAL FOUNDATION NOR FRAMING PLANS WERE INCLUDED WITH THE ARCHITECTURAL SHEETS FOR THE PROPOSED 850 SO FT ADU. CORE AND SHELL STEEL STORAGE BUILDING PERMIT BLRE-06-23-81 71 REMAINS IN "ACTIVE" STATUS AT TIME OF PLANS EXAMINATION, WITH AN UNDERGROUND PLUMBING INSPECTION ON APRIL 26,2024. NO NON- BEARING PARTITION FRAMING MATERIAL DETAIL OR FASTENER CONNECTIONS PROVIDED. IT SHALL REMAIN GARFIELD COUNry BUILDING INSPECTOR JUDGMENT AND DISCRETION TO DETERMINE ANY REOUIRED INSPECTIONS CONCURRENT WITH THE NEWLY ISSUED ADU PERMIT #BLRE-06.24- 8726. BUILDING INSPECTOR HAS AUTHORITY TO DETERMINE IF ANY DEFERRED STRUCTURAL ENGINEER DETAILS SHALL PERTAIN FOR AS-BUILT CONSTRUCTION AT TIME OF FRAME INSPECTION. 2) 2\ 4) s) $ .att .5 -\ d 6) 7) B) \ e)