HomeMy WebLinkAboutPermit Card-Oringinal
Garfield County Public Health
2014 Blake Ave.
Glenwood Springs, CO 81601
Phone: (970) 945-6614 ext. 8150
For inspections, call: 970-945-6614 ext. 8150 and call the Design Engineer, if applicable
Project Address: 4685 County Road 346, Silt, CO 81652_ Parcel No.: 217918100123
Owner Name: Port Everglades Restaurant Corp. Owner Phone: (970) 625-2255
Designed By: K-Cronk Engineering, Inc. Designer Phone: (970) 250-0572
Contractor: Voskuil Operations Contractor Phone: (970) 384-2487
Number of Bedrooms: _3_ Minimum Tank Capacity: 1,000-gallon Minimum Absorption: 818.18 ft2
OWTS PERMIT
KEEP AVAILABLE AT PROJECT SITE
Permit Number _SEPT-8801_______________________________
Permit Type X New X Repair X Remodel/addition X Tank only
Issue Date _07/31/2024____________________ Expiration Date_07/31/2025_________________
Permit Conditions:
This OWTS Permit is approved on the condition of compliance with the report and design as submitted by K-
Cronk Engineering, Inc. dated July 29, 2024. Changes to the design and permit must be approved by Garfield
County Public Health and the designer prior to construction.
The new OWTS will serve an existing three-bedroom residence. The design includes the usage of the existing
1,000-gallon, two compartment septic tank on the property (provided it is inspected and found to be in good
working order) followed by a minimum 300-gallon pump chamber set level with access to grade and a high-
head pump in the pump chamber. Effluent will be pumped to a level manifold that will distribute effluent to
828 ft2 of STA. The new STA will consist of an unlined sand filter bed consisting of three feet deep of secondary
sand media and three distribution laterals suspended from the underside of Quick4 chamber media and
measuring 12 feet x 69 feet. Each lateral shall consist of 15 Quick4 chambers (45 chambers total). Transport
lines from the pump chamber are to be 2-inch diameter Schedule 40 PVC and the distribution laterals are to be
1 υ/ψ-inch Schedule 40 PVC, with 5/32-inch orifices every 4-feet on center and the laterals ending in flushing
valves at the distal end of the laterals. The orifices are to be facing upward. Inspection ports are to be installed
at each end of each lateral (effectively each corner of the bed). The residual head (squirt height) at the end of
the system is to be 8-feet. Maintain all setbacks and elevations as designed.
To assist in scheduling, please contact Garfield County Public Health (970-945-6614 ext. 8150) to notify the
start of OWTS construction. Contact the designer and Garfield County Public Health at least 48 hours prior to
requesting final inspection of the installed system prior to backfill. NO OWTS COMPONENT SHALL BE
BACKFILLED WITHOUT PRIOR APPROVAL FROM GARFIELD COUNTY PUBLIC HEALTH AND THE DESIGNER.
Agreement
All installations must comply with all requirements of the Garfield County OWTS regulations
including but not limited to the conditions specified above.
In consideration of the issuance of the permit, the applicant hereby agrees to comply with all
laws and regulations related to the zoning, location, construction, and erection of the proposed
OWTS and associated structures for which this permit is granted. The applicant further agrees
that if the above said regulations are not fully complied with in the zoning, location, erection,
and construction of the above described OWTS and structure, the permit may then be revoked
by notice from the Health Department and immediately become null and void.
The issuance of a permit and specifications of terms and conditions therein will not constitute
assumption of liability, nor create presumption that the local public health agency or its
employees may be liable for the failure or malfunctioning of any system. Permit issuance will
not constitute a certification that the system, the equipment used in the system, or any
component used for system operation will ensure continuous compliance with the provision of
the OWTS Act, the regulations adopted thereunder, or any terms and conditions of a permit.
Permit Approval
Plans and specifications for the proposed OWTS have been reviewed and are considered
satisfactory. Permission is hereby given to the property owner(s) to perform the work indicated
in accordance with the Garfield County OWTS Regulation. This Permit will expire 1 year from
the date of issuance unless construction on the system has commenced. An "as-built" drawing
must be submitted and inspection of the system must be completed by GCPH before final
approval of the system will be issued.
07/31/2024
Issued By: Garfield County Environmental Health
Department
Date