Loading...
HomeMy WebLinkAboutConditions of PermitCONDITION o F PERMIT BLRE-O 6-24-87 63 JASON & NELLIE STRAND 897 sq. ft. Accessory Dwelling Unit (ADU) and 318 sq. ft. garage (ADU proposed within garage built and inspected under prior building permit #BLRE-06-18-531 1) 41 1 CR 237, Slt Laura Lee Subdivision, Lot 4 - 212735401004 1) ALL WORK SHALL COMpLy W|TH THE 2015 TNTERNATTONAL RESTDENTTAL CODE (l.R.C.) AND 2O1B INTERNATIONAL ENERGY CONSERVATION CODE (I.E.C.C.) 2) PROPOSED TMPROVEMENTS ARE SUBJECT TO ALL APPLTCABLE ITEMS CONTAINED lN THE ATTACHED "GARFI ELD COU NTY BUI LDI NG REOUIREMENTS". NU MBER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) ELECTRTCAL pERM|TTTNG AND TNSPECTTONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. 4) ALL EXTERTOR LTGHTING TO BE DOWNCAST AND SHIELDED. 5) WILDFIRE MITIGATION RECOMMENDATIONS: SHALL COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE RECOMMENDATIONS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COMMUNIry D EVELOPM ENT WEBS ITE FOR ADDITIONAL I N FORMATION. 6) SEPTIC SYSTEM REVIEW / APPROVALS: PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY PROVIDE FINAL APPROVAL /SIGN-OFF FROM GARFIELD COUNTY'S PUBLIC HEALTH DEPT (SEPT-06-24-87 64). 7) ENSURE NO CONSTRUCTTON PARKTNG / STAGTNG AREA OVER SEPTIC TANK AND LEACH FIELD AREA. B) BLOWER DOOR TEST tS REOUTRED FOR THE ADU. MUST SUBMIT BLOWER DOOR TEST REPORT TO GARFIELD COUNTY COMMUNITY DEVELOPMENT DEPT. OFFICE PRIOR TO SCHEDULING FINAL BUILDING INSPECTION / C.O. FINAL. 9) PRESCRIPTIVE PATH WITH 201B IECC TABLE R402j.2 IS CHOSEN FOR ENERGY COMPLIANCE OF THE HOME DESIGN. ALL NEW HOMES TO HAVE WHOLE-HOUSE MECHANICAL VENTILATION SYSTEM INSTALLED (2015 IRC TABLE m1507.3.3(1)AND (2)AS STAMPED ON COVER SHEET, 10) NO NEW STRUCTURAL FRAMTNG OR FOUNDATION DETATLS PROVIDED. ORIGINAL BUILDING WAS CONSTRUCTED / INSPECTED UNDER THE 2015 IRC / IBC CODES. IF ANY STRUCTURAL MEMBERS ARE ENCOUNTERED DURING DEMOLITION, STRUCTURAL ENGINEERS WET STAMP DETAIL MAY BE REOUIRED, IT SHALL BE AT DISCRETION OF THE GARFIELD COUNTY BUILDING INSPECTOR TO REOUIRE FURTHER STAMPED ENGINEERED DETAILS BASED ON OBSERVED FIELD CONDITIONS. ANY NEW INTERIOR NON-BEARING PARTITION FRAMING TO BE BUILT PURSUANT TO 2015 IRC CHAPTERS 3 AND 6. $ N a\ Nsb