Loading...
HomeMy WebLinkAboutRes Check ReportGenerated by REScheck-Web Software Com pl ia nce Certificate Project Finholm Residence Energy Code: Location: Construction Type: Project Type: Conditioned Floor Area Glazing Area Climate Zone: Permit Date: Permit Number: All Electric ls Renewable Has Charger Has Battery: Has Heat Pump: 2018 tECC Garfield County, Colorado Single-family New Construction 2,969 ?82 47o/o s (8499 HDD) false false false false false Owner/Agent: Finholm $srt $ \il Desig ner/Contractor: Compliance: 7.3yo Better Than Code Maximum UA: 5O9 Your UA: 472 The o/o Better or Worse Than Code lndex rellects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy sse or cost relative to a minimum-code home. Slab-on-grade tradeoffs are ro longer considered in the UA or pedormance compliance path in REScheck. Each slab-on-grade assembly ir the specified climate zone must meet the minimum ene.gy code insulation R-value and depth requirements. Envelope Assemblies Construction Site: 240 Rippy Lane New Castle, CO 81647 Ceiling: Flat Ceiling or Scissor Truss Skylight 2: Metal Frame Wall: Wood Frame, 15" o.c. Window 2: Metal Frame Crawl Wall: Solid Concrete or Masonry Wall height: 3.5' Depth below grade: 3.0' Insulation depth: 3.0' 2,969 27 2,223 1,040 49.O 0.0 0.026 0.500 0.031 0.300 0.026 0.550 0.060 0.300 76 74 37 3\2 76 15 7T al l 0.0 28.0 10.0 0.05i. 0.055 33 35 Compliancer Passes using UA trade-off Cavity R-Value Cont. R-Value Prop. Req. U-Factor U-Factor Prop. UA Req UA Gross Area Assembly or Perimeter 903 8.0 Project Title: Finholm Residence Data filename: Report date: 04124124 Page J. of10 Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit applicatlon. The proposed building has been designed to meet the 20L8 IECC requirements in REScneck Version : REScheck-Web and to comply with the mandatory requirements listed in the REscheck lnspection Checklist. Babak Khatibtoo, pE - Mechanicat Engineer F,rq F-qK <{AZa{gZnC o6tfit2a24 Name - Title Signature Date Project Title: Finholm Residence Data filename: Report date: 04124124 Page 2 of10 REScheck Software Version : REScheck-Web lnspection Checklist Energy Code: 2018 IECC Requirements: 0.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Additional Comments/Assumptions: Plans Verified Value Field Verified Value Complies?Comments/Assumptions Section # & Req.lD Pre-lnspection/Plan R€view 103.1, 103.2 lPRl ll .t+) : Construction drawings and , documentation demonstrate ,energy code compliance for the : building envelope. Thermal envelope represented on construction documents. iflcomplies ,nDoes Not INot observable ,INot npplicable I Construction drawings and I documentation demonstrate ienergy code compliance for :lighting and mechanical systems. . Systems serving multiple :dwelling units must demonstrate :compliance with the IECC i Commercial Provisions. 'nNot observable i[ruot applicable . : a 103.1, 103.2, 403.7 lPR3l1 .l;r nDoes Not omplies Heating and cooling equipment is sized per ACCA Manual S based on loads calculated per ACCA Manual J or other methods approved by the code olficial. 302.1, 443.7 lPR2l' .9, Heatlng: Btu/h r_ Cooling: Btu/h r Heating: Btu/hr_ Cooling: Btu/hr tr nNot observable nNot Applicable Complies Does Not 3 Low:m (Tier 3)7 High lmpact (Tier 1)2 Medium lm (Tier 2) Project Title: Finholm Residence Data filename: Report date: 04124124 Page 3 oflO Complies?Comment6/Assumptions Section # & Reo,lD Foundation lnspection Plans veritied Value Field Vorified Value 402.2.11 lFoTll '*) llcomplies iflDoes ttot inruot obr"ru" lnruot npplicab lSee the Envelope Assemblies t,table for values. I R. R- R- R- Unvented crawl space wall insulation R-value. ble ilei 303.2 IFO8]1 Wj Unvented crawl space wall insulation installed per manufacturer's instructions. :nComplies j[Jooes t',tot :nNot Observable ;nNot Applicable Unvented crawl space continuous vapor retarder installed over exposed earth, joints overlapped by 6 in. and sealed, extending at least 6 in, up and attached to the wall. !Complies nDoes Not !Not Observable nNot Applicable 402.2.1r lFo9l1 'gr nComplies EDoes Not INot observable nllot npplicable See the Envelope Assemblies table for values. tn tn402.2.tt lFO10l1 rqi,' Unvented crawl space wall insulation depth of burial or distance trom top of wall. 303.2.1 IFor.1l, tri-' A protective covering is installed to protect exposed exterior insulation and extends a minimum of 6 in. below grade. ,ncomplies lnDoes Not jnruot observable inruot npplicabte 403.9 lFor.2l, xt :nComplies ,noo"t tttot 'nNot observable ,ENot Applicable Snow- and ice-melting system controls installed. Additional Comments/Assumptions : 3 Low:m ct (Tier 3)1 High Impact (Tier 1)2 Medium Im ct (Tier 2) Project Title: Finholm Residence Data filename: Report date: 04124124 Page 4 oflo 5€ction & Req.lD Framing / Rough-ln lnspection Plans Verified Value Field verified Value Complies?Co mm €nts/Assu mptions 402.r.1, 402.3.1, 402.3.3, 402.5 IFR2 ]1 I ,ncomplies ,nooes wot LlNot Observable ;[JNot Rpplicable : U-U-See the Envelope Assemblies table for values. Glazing U-factor {area-weighted average). 303.1.3 I FR4 ]1 .:JJ U-factors of fenestration products are determined in accordance with the NFRC test procedure or taken from the default table. plies Does Not Observable Applicable 402.r.L, 402.3.3, 402.3.6, 402.5 IFRs ]1 ..tt; Skylight U-factor U :nComplies ;flooes l,tot lINot observable i[JNot npplicable See the Envelope Assemblies table for values U Fenestration that is not site built is listed and labeled as meeting AAMA /WD MA/CS A ]-OII 1.5.2 I A44O or has inliltration rates per NFRC 400 that do not exceed code limits. nNot Applicable 4O2.4.1.7 lAir barrier and thermal barrier IFR23]1 linstalled permanufacturer's .. : instructions.1e: 402.4.3 IFR2 ol1 -.13.r nComplies 'nDoes Not LlNot Observable fJcomplies flDoes Not ENot observable nNot Applicable . lC-rated recessed lighting fixtures ' sealed at housing/interior finish .and labeled to indicate <2.o cfm leakage at 75 Pa. plies Applicable 402.4.5 I FR16],Does Not Not Observable :R-6 where < 3 inches. Supply and .return ducts in other portions of :the building insulated >= R-5 for :diameter >= 3 inches and R-4.2 i lfor < 3 inches in diameter. .>= 3 inches in diameter and >= 403.3.1 lFR12l1 Supply and return ducts in attics insulated >= R-8 where duct is plies oes Not Observable Applicable 403.3.2 I FR13]1 3i lDucts, air handlers and filter lboxes are sealed with :loints/seams compliant with :lnternational Mechanical Code or , lnternational Residential Code, as nDoes Not INot Observable lNot Applicable a plies 403.3.5 lFR1513 -3t-r nDoes Not nNot observable nNot npplicable Complies:Building cavities are not used as ,ducts or plenums. 403.4 lFR17l, HVAC piping conveying fluids above 105 qF or chilled fluids below 55 oF are insulated to >R- 3. nComplies flDoes Not nNot observab:e nNot Applicable R.R- 403.4.1 lFR24l1 ,,1a nDoes Not Ies Not Observable Not ble Protection of insulation on HVAC piping. 1 High lm ct (Tier 1)2 Medium lmpact (Tier 2)3 Low :mpact (Tier 3) Project Title: Finholm Residence Data filename: Report date: 04/24124 Page 5 of10 Hot water pipes are insu.lat€d to >R-3.Not Observable are Additional Comments/Ass um ptions : m Low1h Project Title: Finholrn Residence Data filename: Report date: 04J24124 Page 6 of10 All installed insulation is labeled or the installed R-values provided. lies :Not i I mp ot Observable i ot Applicable i 402.L.1, 402.2.5, 402.2.6 ilN311s Wall insulation R-value. lf this is a mass wall with at least % of the wall insulation on the wall exterior, the exterior insulation requirement applies (FR10). R-_ ! Wood ! Mass n Steel [Complies lDoes Not ENot observable lNot Applicable R-see the Envelope Assemblies table for values.fl Wood I Mass ! steel 303.2 ltN4ll IComplies EDoes Not ENot observable nruot Applicable Wall insulation is installed per manufacturer's instructions. Additional Com ments/Assumptions: Medium Im (Tier 2)3 (rier 3)LowLHigh lmpact (Tier 1 Project Title: Finholm Residence Data filename: Report date: 04124124 Page 7 ofJ"0 Plans Verified Value Field Verified Value Complias?Comments/Assu mp:ions Sectior & Req,lD Final lnspection Provis:ons 402.r.7, 442.2.7, 402.2.2, 402.2.6 lFr1l1 I:tl :n Ceiling insulation R-value.R- nn Not Observable Not Applicable R-_ fl wood I steel :See the Envelope Assemblies ':table for values. :[]complies l[]ooes I'totWood Steel 303.1,1.1, :Ceiling insulation installed per 303.2 imanufacturer'sinstructions. lFl2l1 ]BIown insulation marked every 1300 ft,. plies Not .!Not observable Applicable Vented attics with air permeable . insulation include baffle adjacent ;to soffit and eave vents that extends over insulation. 402.2.3 IFt2212 []ruot Iicable plies Not !Not Observable Attic access hatch and door insulation >R-value of the adjacent assembly. nComplies flDoes Not nNot observable nNot Applicable R-R402.2.4 lFr3l1 402.4.7.2 I Ft17 ]1 Blower door test @ 5O Pa. <=5 ach in Climate Zones 1-2, and <=3 ach in Climate Zones 3-8. nComplies nDoes Not INot observable [JNot Applicable ACH 50 :ACH 50 = Ducts are pressure tested to determine air leakage with either: Rough-in test: Total leakage measured with a pressure dilferential of 0.1 inch w.g. across the system including the manufacturer's air handler enclosure if installed at time of test. Postconstruction test: Total leakage measured with a pressure differential of o.1 inch w,g. across the entire system including the manufacturer's air handler enclosure. cfm/100cfm/100F-ftz 403.3.3 l Ft2 7l1 !complies f]Does Not !Not Observable nNot Applicabte iDuct tightness test result of <=4 icfm/100 ft2 across the system or :<=3 cfm/10o ft2 without air .handler @ 25 Pa. For rough-in 403.3.4 cfm/100 lFr4l1 cfm/100 ftt-ftt- .nNot :nruotadneetonVCationficmtests,v uocc d un Fram n ecti olns Does Not plies Observable Applicable ,ncomplies :nDoes Not :nNot Observable ,flruot npplicable :Air handler leakage designated403.3.2.1 lFt24l1 by manufacturer at <=27o of design air flow. ; Programmable thermostats installed for control of primary ,heating and cooling systems and , initially set by manufacturer to'code specifications. iflcomplies nOoes ttot L-lNot Observable jnruot applicable 403.1.1 lFrel, Heat pump thermostat installed ,on heat pumps. 403.1.2 lFr10l, :Ecomplies :nDoes Not nNot observable !Not Applicable :Circulating service hot water isystems have automatic or , accessible manual controls. o e5mpnDoesotN :nNot observable ble 403.5.1 I F r11], !t:ot 1 lm ct (Tier 1)2 Medium lmpact (Tier 2)3 Low lmpact (Tier 3) Project Title: Finholm Residence Data filename: Report date: O4124124 Page B of10 Plans Verified Value Field Verified Value Complies? Section # & Req.lD Final lnspection Provas:ons comm ents/Assu m ptions lAll mechanical ventilation system ifans not part of tested and listed :HVAC equipment meet efficacy :and air flow limits per Table :R403.6.1. :ncomplies .nDoes Not :!Not Observable ,nNot Applicable 403.6.1- lFr25l, iHot water boilers supplying heat ithrough one- or two-pipe heating :systems have outdoor setback control to lower boiler water plies Applicabletemoutdoobasedonperature tem Not 1[Not Observable 403.2 lFr26l, pipe. Gravity and thermos- syphon circulation systems are not present. Controls for circulating hot water system pumps start the pump with signal for hot water demand within the occupancy. Controls automatically turn off the pump when water is in circulation loop is at set-point temperature and no demand for hot water exists. lNot Applicable [lComplies flDoes Not Heated water circulation systems !Not observable 403.5.1.1 lFr2812 ihave a circulation pump. The ,system return pipe is a dedicated lreturn pipe or a cold water supply Electric heat trace systems comply with IEEE 515.1 or UL 515. Controls automatically adjust the energy input to the heat tracing to maintain the desired water temperature in the lIDoes Not llNot observable ;flNot npplicable : tes403.5.1.2 lFt29l2 Demand recirculation water :systems have controls that :manage operation of the pump :and limit the temperature of the iwater entering the cold water 403.5.2 I Fr3O]2 tn to <= 104eF !Not Observable ,nNot Applicable i 855.1. Potable water-side , pressure loss of drain water heat : rrecovery units < 3 psi for individual units connected to one .or two showers. Potable water- side pressure loss of drain water 403.5.4 lFr31l, om tesp 'nDoes Not INot Observable [JNot Applicable Drain water heat recovery units tested in accordance with CSA heat recovery units < 2 psi for individual units connected to three or more showers. Complies Does otN otN bserva ble N ot ble 404.1 lFr6l1 9oo/o or more of permanent fixtures have high efficacy lamps 404.1.1 lFr23l3 3t, Does Not te5 :flNot observable Not Applicable Fuel gas lighting systems have no continuous pilot Iight. Compliance certificate posted plies :nNot :nNot Does Not 401.3 lFtT 12 Observable Applicable 2 Medium Im (Tier 2)3 Low lm (Tier 3)1 (Tler 1)H Project Title: Finholm Residence Data filename: Report date: O4/24124 Page 9 oflO EDoes Not Observable icable Manufacturer man uals for mechanical and water heating have been provided. Additional Comments/Assumptions: L Project Title: Finholm Residence Data filename: Report date: 04124124 Page 10 ofl0 2018 IECC Energy Effi c ie ncy Certifi cate Above-Grade Wall Below-Grade Wall Floor Ceiling / Roof Ductwork (unconditioned spaces): Window Door Skylight Heating System:_ Cooling System:_ Water Heate Name: Comments 28.OO t 8.oo o.oo 49.OO o,30 o.50 Date: R-Valuelnsulation Rating Glass & Door Ratang U-Factor SHGC EfficiencyHeating & Cooling Equipment