HomeMy WebLinkAboutConditions of PermitCONDITION OF PERMIT
BLMF-O7-24-8772
SAM FEUERBORN & LINDSAY GURLEY
PRE-FABRICATED HOME ON ENGINEERED FOUNDATION CRAWL SPACE
1319 CR 127 , Glenwood Springs - 218528200024
MANUFACTURED HOUSES ARE REGULATED & INSPECTED BY COTORADO DEPT. OF HOUSING (C.D.O.H.)
AND ALL FACTORY.BUILT RESIDENTIAL STRUCTURES INSTALLED IN GARFIELD COUNTY MUST MEET
C.D.O.H. GUIDELINES FOR MANUFACTURE AND INSTATLATION AT THE JOB SITE.
(2018 |ECC'BLOWER DOOR TESTtNG', ON PREMISES AFTER INSTALLATION SHALL NOT APPLY FOR
MANUFACTURED HOME TYPE .
AS CURRENT ENERGY COMPLIANCE FOR STATE OF COLORADO IS TO BE VERIFIED AT THE FACTORY)
1)
2)
3)
FOUNDATION CRAWL SPACE & EXTERIOR DOOR LANDING / STAIRS SHALL COMPLY WITH 2015 I.R.C.,
20 1 8 I.E,C.C. AND MANU FACTURER'S I NSTALLATION REOUI REM ENTS.
REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNry'S BUILDING REOUIREMENTS AND
MAN UFACTU RER'S INSTALLATION REOUI REM ENTS.
WILDFIRE MITIGATION RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE MITIGATION AND
DEFENSIBLE SPACE RECOMMENDATIONS COLORADO STATE FOREST SERVICE AND LOCAL FIRE
DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COMMUNITY DEVELOPMENT WEBSITE FOR
ADDITIONAL I NFORMATION.
ALL PLUMBING AND GAS PIPING CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED
PLUMBER, AND ALL ELECTRICAL CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED
ELECTRICIAN.
ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL
ROUGH-IN APPROVAL, IF ANY, WORK PROPOSED IN ATTIC LOFT. ELECTRICAL FINAL APPROVAL
REOUIRED FOR FINAL INSPECTION & CERT. OF OCCUPANCY.
PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY, PROVIDE BUILDING
INSPECTOR WITH FINAL APPROVAL / SIGN.OFF FROM GARFIELD COUNTY'S PUBLIC HEALTH
DEPARTMENT FOR INSTALLATION OF THE ON-SITE WASTEWATER TREATMENT SYSTEM.
GARFIELD COUNry BUILDING DEPT. INSPECTIONS TO INCLUDE THE FOLLOWING:
A. FOOTINGS DESIGNED AT 2,500 PSF, VERIFY 36 INCH MINIMUM FROST DEPTH & UFERGROUND
INSTALLED. OPEN HOLE SOILS REPORT REOUIRED AT FIRST FOOTING INSPECTION.
B. FOUNDATION
C. SEPTIC SYSTEM CONNECTION
D. PLUMBING/GAS
E. SITE FRAMING, STAIRS, HANDRAILS PER STRUCTURAL ENGINEERS PLANS AND FIELD COPY.
F. FINAL INSPECTION & CERTIFICATE OF OCCUPANCY*
*NOTE: GARFIELD COUNTY REOUIRES C.D.O.H. INSTALLATION INSIGNIA TO BE AFFIXED PRIOR
TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY