HomeMy WebLinkAboutSubsoils Report for Foundation DesignLKP Engineering, Inc.
CIVILIGEOTECHMCAL
SOI AND FOUNDATION INVESTIGATION
F'OR A
PROPOSED RESIDENCE
LOT 32, ELK SPRTNGS, FTLTNG 6
A SUBDIVISION OF LOS AMIGOS RANCH PUD
38 WOODRUFF ROAD
GLENWOOD SPRINGS
GARFTELD COUNTY, COLORADO
PROJECT NO. 2I.3497
MARCH 26,202I
PREPARED FOR:
RYAN IVY
2579 COANTY ROAD 115
GLENWOOD SPRTNGS, CO 81601
P.O. Box 724,Eagle, CO 81631 Tel. (970) 390-0307 www.LKPEngineerine.com
TABLE OF CONTENTS
EXECUTIVE SUMMARY ........
SCOPE OF STUDY
SITE DESCRIPTION.
PROPOSED CONSTRUCTION
FIELD INVESTIGATION
SUBSURFACE SOIL AND GROUNDWATER CONDITION.
FOUNDATION RECOMMENDATIONS
SLAB CONSTRUCTION
RETAINING WALLS......
UNDERDRAIN SYSTEM....
SITE GRADING AND DRAINAGE
LAWN IRRIGATION ...........
LIMITATION............
FIGURES
LOCATION SKETCH. .
SUBSURFACE EXPLORATION LOGS
PERIMETER DRAIN DETAIL.
STRUCTURAL FILL WITH GEOGRID
. .DRAWING NO. 1
. .FIGURENO's 1-2
FIGURE NO. 3
. . FIGURE NO. 4
2
2
2
aJ
aJ
J
4
5
5
6
6
7
7
LKP Engineering,Inc.
EXECUTIVE SUMMARY
The proposed residence should be supported with
conventional type spread footings, designed for an allowable soil
bearing prsssure of 2000 psf. They should construct the footings
on the undisturbed silty, sandy clay with basalt rocks or structural
fill with geogrid. See X'oundation Recommendations.
SCOPE OF STUDY
This report presents the results of a subsurf'ace Soil and Foundation Investigation for a
proposed residence to be constructed on Lot32, Elk Springs, Filing 6, A Subdivision of Los
Amigos Ranch PUD, 38 Woodruff Road, Glenwood Springs, Garfield County, Colorado. The
purpose of the subsurface soil and foundation investigation was to determine the engineering
characteristics of the foundation soil and to provide recommendations for the foundation design,
grading, and drainage. Geologic hazqrd studies )are outside of our scope of services.
SITE DESCRIPTION
Lot32, Elk Springs Filing 6, A Subdivision of Los Amigos Ranch PUD is 2.285 acres
and it is located at the southeast comer of the intersection of Los Amigos Drive and Woodruff
Road, Glenwood Springs, Garfield County, Colorado. Vegetation within the proposed building
site consisted of sparse grass, juniper trees, and sage brush. The topography was moderate with
average slopes from about 10 to 15 percent. Drainage is to the southwest. Along the northwest
property line was Woodruff Road. To the southwest was HOA vacant parcel. To the northeast of
LKP Engineering,Inc.
J
the lot there was an existing residence. To the southeast was a vacant lot. Lot 32 was also vacant.
PROPOSED CONSTRUCTION
The soil and foundation investigation was done during the process of the lot purchase.
Architectural plans have not been developed yet. We have assumed that the proposed residence
will be two story, wood frame construction with a possible basement, on a concrete foundation,
with an attached garage. We anticipate loads to be light, typical of residential construction.
If the frnalizedplans differ significantly from the above understanding, they should
noti$ us to reevaluate the recommendations of this report.
FIELD INVESTIGATION
The field investigation, conducted on March 20,202I, consisted of logging and sampling
two test pits. The test pits were dug by you with Deere 60D trackhoe. Approximate locations of
the test pits are shown on Drawing No. 1. We show the soil profile of the test pits on the
Subsurface Exploration Logs, Figure No's 1 and2. Soil samples for laboratory soil analysis and
observation were not taken due to the shallow refusal on basalt cobbles and boulders.
SUBSURFACE SOIL AND GROUNDWATER CONDITION
The soil profiles encountered in the two test pits were uniform, consisting of about a one
to 1.5 feet of topsoil over whitish, calcareous, gypsiferous, silty, sandy clay with basalt rocks of
gravel to cobbles and boulder size, cemented, to the maximum depth explored of 4 and 3 feet
respectively. Ground water was not encountered in the test pits.
LKP Engineering,Inc.
4
FOUNDATION RECOMMENDATIONS
The proposed residence should be supported with conventional type spread footings,
designed for an allowable soil bearing pressure of 2000 psf. They should construct the footings
on the undisturbed silty-sandy clay with basalt gravel, cobbles and boulders. From previous
experience with similar soils, it is very likely that excavation of the large basalt rocks to level the
foundation excavation for the construction of the footings, can leave large voids and uneven
subgrade. If the thickness of the leveling, structural fill is more than 6 to 8 inches, structural fiIl
improved with Tensar geogrid, as shown on the attached detail, figure number 4, will be
implemented.
The completedfoundation excovation must be observed and tested by the undersigned
engineer to verifu that the soil conditions encountered during construction are os anticipated in
this report.
We recommend a minimum width of 16 inches for the continuous footings and2 feet for
the isolated footing pads. Continuous foundation walls should be reinforced top and bottom to
span an unsupported length of at least 10 feet.
The proposed foundation should be set at a minimum depth of four feet below the
finished grade or at the minimum depth required by the local building code. The foundation
excavation should be free from excavation spoils, frost, organics and standing water. We
recommend proof-rolling of the foundation excavation. Soft spots detected during the proof-
rolling, should be removed by overexcavation. Any overexcavation within the proposed
foundation should be backfilled, in 8 inches loose level lifts and compacted to l00Yo of the
maximum dry density and within 2 percent of the optimum moisture content as determined in a
laboratory from a Standard Proctor test (ASTM D-698). A structural fill, placed under footings
should be tested by a qualified professional.
LKP Engineering,Inc.
5
SLAB CONSTRUCTION
The natural on-site soils, exclusive of topsoil and organics, are suitable to support lightly
loaded slab-on-grade construction. The subgrade for the slab-on-grade construction should be
proof compacted to detect and remove soft spots. They should backfill overexcavated soft spots
and other underslab fill with the on-site soil, free from topsoil and organics, or other suitable
material, compacted to a minimum of 95 percent of the maximum standard Proctor density
(ASTM D-698). Suitable material should be free from topsoil, organics and rock fragments
greater than 3 inches. If during excavationfor the slab-on-grade similqr conditions, as described
in the above foundation recommendations section, with large voids or uneven surface are
created, structural fill as-describe above and as shown on the Structurol fill with geogrid detsil,
figure number 4 will be used.
The concrete slab should be constructed over a4-inch layer of clean gravel consisting of
-314-inch gravel with at least 50% retained on the No. 4 sieve and less than 3 percent passing the
No. 200 sieve.
They should reinforce the concrete slab-on-grade and score controljoints according to
the American Concrete Institute requirements and per the recommendations of the designer to
reduce damage due to shrinkage. The concrete slab should be separated from the foundation
walls and columns with expansion joints to allow for independent movement without causing
damage.
RETAINING WALLS
Foundation walls retaining earth and retaining structures that arelaterally supported
should be designed to resist an equivalent fluid density of 60 pcf for an "at-rest" condition.
Laterally unrestrained structures, retaining the on-site eafth, should be designed to resist an
equivalent fluid density of 40 pcf for the "active" case.
LKP Engineering,Inc.
6
The above design reconlmendations assume drained backfill conditions and a horizontal
backfill surface. Surcharge loading due to adjacent structures, weight of temporary stored
construction materials and equipment, inclined backfill and hydrostatic pressure due to
undrained backfill should be incorporated in the design. They should try to prevent the buildup
of hydrostatic pressure behind the retaining wall.
Passive earth pressure of360 psfcan be used for the lateral pressure against the sides of
the footings. Resistance to sliding at the bottom of the footings can be calculated based on a
coefficient of friction of 0.5. Undisturbed soil or a structural fill compacted to 100 percent of the
maximum dry density and within 2 percent of the optimum moisture content will be used to
resist lateral loads at the sides of the footings.
UNDERDRAIN SYSTEM
To reduce the risk of surface water infiltrating the foundation subsoil, we recommend
installation of a foundation perimeter drain (see Figure No. 3). The foundation perimeter drain
should consist of a 4-inch diameter, perforated pipe, sloped to a suitable gravrty outlet, at a ll4
inch per foot for flexible or at a 1/8 of an inch for rigid pipe. The bottom of the trench adjacent
to the footing should be lined with a polyethylene moisture barrier glued to the foundation wall.
The drain pipe should be covered with a minimum of 6 inches of -3l4-inch free-draining
granular material. Geotextile (Mirafi 140N or equivalent) should be used to cover the free-
draining gravel to prevent siltation and clogging of the drain. The backfill above the drain should
be granular material to within 2 feet of the ground surface to prevent a buildup of hydrostatic
pressure.
SITE GRADING AND DRAINAGE
The following recommendations are general. Exterior backfill should be compacted at or
near the optimum moisture content to at least 95o/o of the maximum standard Proctor density
under pavement, sidewalk and patio areas and to at least 90%o of the maximum standard Proctor
LKP Engineering,Inc.
7
density under landscaped areas. They should use mechanical methods of compaction. Do not
puddle the foundation excavation.
The site surrounding the building structure should slope away from the building in all
directions. A minimum of 12 inches in the first 10 feet is recommended in unpaved areas, and
three inches in the first 10 feet in paved areas. The top of the granular foundation backfill should
be covered with a minimum of I foot of relatively impervious filIto reduce the potential of
surface water infiltrating the foundation subsoils.
Surface water naturally draining toward the proposed building site should be diverted
around and away from it by means of drainage swales or other approved methods. The roof
drains and downspouts should extend and discharge beyond the limits of the backfill.
LAWN IRRIGATION
It is not recommended to introduce excess water to the foundation soils by installing
sprinkler systems next to the building. The installation of the sprinkler heads should ensure that
the spray from the heads will not fall within 10 feet of foundation walls, porches or patio slabs.
Lawn irrigation must be controlled.
LIMITATION
This report has been prepared according to locally accepted Professional Geotechnical
Engineering standards for similar methods of testing and soil conditions at this time. The type of
soil testing was selected by the owner and general contractor as the preferred method for the soil
and foundation investigation over a soil and foundation investigation with a drill rig. There is no
other warranty either expressed or implied.
The findings and recommendations of this report are based on field exploration,
laboratory testing of samples obtained at the specific locations shown on the Location Sketch,
Drawing No.1 and on assumptions stated in the report. Soil conditions at other locations may
vary. which may not become evident until the foundation excavation is completed. If soil or
LKP Engineering,Inc.
8
water conditions seem different from those described in this report, we should be contacted
immediately to reevaluate the recommendations of this report. We are not responsible for
technical interpretation by others of the data presented in this report.
This report has been prepared for the exclusive use of Ryan Ivy, for the specific
application to the proposed residence on Lot 32,EIk Springs, Filing 6, A Subdivision of Los
Amigos Ranch PUD, 38 Woodruff Road, Glenwood Springs, Garfield County, Colorado.
Sincerely,
LKP ENGINEERING,INC.
LuizaPetrovska, PE
-..."..'''
i *i ^ ?sszli i *iffi*q@{r"",'l*:ii
iii"t:.
.'
J:\ WP X4-LKP\ 2021\21 -3 497 CLAY- SAND-BASALT-PITS.DOCX
LKP Engineering,Inc.
ASnUnS V NO OfSVS rON Sr [fl-Vt{lXOUddV
st Jd rsft fHt_ lo Notlvcol 3Hl- :3J-oN
l{?1lT'
,* \lrg**:?H t€/'g
dT l#?
sgs . ,fr---
1#-'
{-"
€ffiu
$,
6&-'.
qqp rye*'Q$
{
-*"#y €3€Y
#s JS?
sfir
*W,a,%
Il
f
?
q
*g
\/
l^
fi I
**ptr rY$ rfr J8?fir
k
/{0
//t
.*-##-1h
r** 3v st*tW
=igzr roz * \
uroc'6upseul6ujd;'l'r/n^r ZOC0-O6g (01.6) pI
ftgfg OC 'a16o3 'y72 xoE 'O'd
'cul 'Eurteaur7ug
rvcrNucsrogc,/ttalc
dXT
HCJEXS NOIJVCOT
oovuo-roc'I.tNnoc c']f HUVo
scNluds oooMNSt9 'ovou llnuoooM 8e
scNtuds vrf 'cnd HoNVU
soctnv so] lo NotstN osns v'zc Io'lL6Vt-LZ
: oN lSfroud
,09="1- ,!.lvcs
,
: oN oNtMw0
DATE OBSERVED: MARCH 20,2021
ELEVATION:
Test Pit f L
DEPTH
FEET
s
Y
M
B
o
L
.S
A
M
P
L
E
DESCRIPNON OF MATERIAL
AND SAMPLE LOCANON
LABORATORY
TEST RESULTS
REMARKS
5
-10
-15
20
Topsoil with roots
llhitish, colcoreous, glpsiferous,
silty, sandy clay with bosalt rocks
of gravel to cobbles and boulder
size, cemented
Refusal at 4 feet Ground Water
Encountered
I,EGEND:
tr - 2-inch O.D. California Liner SompleI - Bulk SampleDD - Natural Dry Density (pcf)
MC - Noturol Moisture Content (%)
-200 - Percent Passing No. 200 SieveLL - Liquid LlmitPl - Plosticlty lndexCW - Ground water
tKP ENGINEERING, INC.SUBSURFACE EXPLOMTION TOG
PN),ECr NA:20-3497
Ifla)E NO,:
DATE OBSERVED: MARCH 20,2021
ELEVATION:
Test Pit f 2
DEPTH
FEET
s
Y
M
B
o
L
s
A
M
P
L
E
DESCRIPNON OF MATERIAL
AND SAMPLE LOCANON
LABORATORY
TEST RESULTS
REMARKS
5
_10
-15
_20
X
W
Topsoil with roots over
Vtlhitish, colcoreous, g1'psiferous, silty,
sandy clay with basalt rocks of
gravel, cobbles and boulder size
Refusol at 3 feet Ground Water
Encountered
I,EGEND:
tr - 2-inch O.D. Colifomio Liner SampleI - Bulk Somple
DD - Natural Dry Density (pcf)
MC - Natural Moisture Content (%)
-200 - Percent Possing No. 200 SieveLL - Liquid LimitPl - Plasticity lndexGW - Ground water
tKP ENGINEERING, INC.SUBSURFACE EXPTORATION tOG
PROECT NO.:20-3497
nw ta:2
D
.',FOONNG
'.t
D>
{!
S
-
R
*
R
b'
t
PE AWAY FROM BUILDING
R BACKFILL WITH A MINIMUM
OF ONE FOOT OF RELATIVELY
IMPERVIOUS SOIL
ILTER FABRTC (MlRAFl
140N OR EOUIVALENT)
INUS 3/4-INCH DIAMETER, COARSE,
CLEAN CRUSH ROCK
30 MIL MINIMUM THICKNESS,NCH DIAMETER PERFORATED PIPE SLOPED TO
PLASTIC LINER, GLUED TO TH A DAYLIGHT LOCATION AWAY FROM THE
FOUNDATION AT 1/4-INCH PER FOOT FOR
FLEXIBLE AND 1/B-INCH MINIMUM FOR RIGID PIPE
FOUNDATION WALL
cMLlcEOTECUNICAL
Engineering, Irtc.
P.O. Box 724, Eogle, CO 81631
Tel (970) 590-0307 www.LKPEngineerinq.com
LKP
PERIMETER DRAIN
LOT 32, A SUBDIVISION OF LOS AMIGOS
RANCH PUD, ELK SPRINGS
38 WOODRUFF ROAD, GLENWOOD SPRINGS
GARFIELD COUNTY, COLORADO
PRo'rECt No':
21-g4g7
scALE: N.T.s.
3
HdJRE NO.: