Loading...
HomeMy WebLinkAboutOwner's Response to Correction LetterColleen Wirth Ounar ,(reVonse * earrcchbu k{-eh - From: Sent: To: Cc: Subject: Attachments: Thanks, Jeremy Keranen Office: (970) 384-227t Cell: (970) 6L8-7752 www.vou ng-services.co m Jeremy Keranen <jeremy@young-services.com > Thursday, August 8,2024 9:40 AM Colleen Wirth; Mic Baca Gloria Keranen Re: BLRE-06-24-8755 - KERANEN ADU / Garage permit is PENDING 24-7-162 (03-29-24) Garage&ADU Subsoil Study signed.pdf; Keranen ADU - 449 Ram Lane Manual J Reports.PDF; Keranen ADU - 449 Ram Lane Heat Loss Reports.PDF You don't often get email from jeremy@young-services.com. iliearnnr w,iLry ilhis iis iififiiiportanit HiColteen, See responses betow in green and the attached documents. Ptease let me know if anything else is needed RECEIVED AU6 0 8 2A24 GARFIELD COUNTY COM.:{UNITY I]EVEL,)PMEruT From: Cotteen Wi rth <cwi rth@ga rfietd -cou nty. com> Date: Tuesday, Juty 23, 2024 al3:04 PM To: Jeremy Keranen <jeremy@young-services.com>, Mic Baca <studiom.engineer@gmait.com> subject: BLRE-06-24-8755 - KERANEN ADU / Garage permit is PENDING BLRE-06-24-8755 Keranen ADU 449 Ram Lane Sitt CO Courtesy Message for Keranen ADU project team: l'm compteting the code review for your ADU project and need further information before I finish the ptans examination and marking up of your FIELD COPY: GORRECTIONS: 1. Suppty a copy of Kumar & Associates geotechnical report #24-7-162 dated Ogl29l2024 (referenced by Mic Baca's 51.0 foundation notes.) Report is attached 2. Please state in writingyour chosen "ENERGY COMPLIANCE PATH" 2.a.Do you intend the buitding to be construction in accordance with the PRESCRIPTIVE PATH and 2018 IECC Tabl,e R402.1.2 Climate Zone 5? Yes, Prescriptive Path perZone#51 R402.1.2 2.b. Do you intend to submit for ptans examination a separate RESGheck Report (for UA alterative trade offs under the PRESCRIPTIVE COMPLIANCE PATH)? No 2.c. Do you intend to hire a HERS RATER to prepare reports and go with an ENERGY PERFORMANCE PATH? NO 2.d. Other ENERGY PERFORMANCE SOFTWARE method? See attached Manuat JB l,oad catculation and heating system summary '{Lt s\ .\) .\ -N 1 Feedback: White your ptans do reference the 2018 IECC code and inctuded some R-vatues and U- factor notations, it is unknown which energy path you intend to buil,d to. Written confirmation most hetpfut so Garfield County Buitding lnspectors have correct understanding during fietd inspections. Based on your submittal it remains unclear if you desire to go strictty with Tabte R402.1.2 Ctimate Zone 5 assembties? Or if you desire any buil,ding or system design "trade offs" for the as-built construction. Please answer items 1-2d comptetety and send your written response by email to Gotl,een Wirth, Pta n s Exa m i n e r, cwirth@ga rf ield-cou nttr. co nr Thanks for your efforts putting this ADU project apptication -- I Look forward to seeing it move forward. Buitding Ptans Examiner Garfietd County Community Devetopment 108 Bth Street, Suite 401 (970) 945-1 377 ext 1 61 0 cwirth@ga rf ietd-county.com 2