HomeMy WebLinkAboutOwner's Response to Correction LetterColleen Wirth
Ounar ,(reVonse *
earrcchbu k{-eh -
From:
Sent:
To:
Cc:
Subject:
Attachments:
Thanks,
Jeremy Keranen
Office: (970) 384-227t
Cell: (970) 6L8-7752
www.vou ng-services.co m
Jeremy Keranen <jeremy@young-services.com >
Thursday, August 8,2024 9:40 AM
Colleen Wirth; Mic Baca
Gloria Keranen
Re: BLRE-06-24-8755 - KERANEN ADU / Garage permit is PENDING
24-7-162 (03-29-24) Garage&ADU Subsoil Study signed.pdf; Keranen ADU - 449 Ram
Lane Manual J Reports.PDF; Keranen ADU - 449 Ram Lane Heat Loss Reports.PDF
You don't often get email from jeremy@young-services.com. iliearnnr w,iLry ilhis iis iififiiiportanit
HiColteen,
See responses betow in green and the attached documents. Ptease let me know if anything else is needed
RECEIVED
AU6 0 8 2A24
GARFIELD COUNTY
COM.:{UNITY I]EVEL,)PMEruT
From: Cotteen Wi rth <cwi rth@ga rfietd -cou nty. com>
Date: Tuesday, Juty 23, 2024 al3:04 PM
To: Jeremy Keranen <jeremy@young-services.com>, Mic Baca <studiom.engineer@gmait.com>
subject: BLRE-06-24-8755 - KERANEN ADU / Garage permit is PENDING
BLRE-06-24-8755 Keranen ADU 449 Ram Lane Sitt CO
Courtesy Message for Keranen ADU project team:
l'm compteting the code review for your ADU project and need further information before I finish the ptans
examination and marking up of your FIELD COPY:
GORRECTIONS:
1. Suppty a copy of Kumar & Associates geotechnical report #24-7-162 dated Ogl29l2024
(referenced by Mic Baca's 51.0 foundation notes.) Report is attached
2. Please state in writingyour chosen "ENERGY COMPLIANCE PATH"
2.a.Do you intend the buitding to be construction in accordance with the PRESCRIPTIVE
PATH and 2018 IECC Tabl,e R402.1.2 Climate Zone 5? Yes, Prescriptive Path perZone#51
R402.1.2
2.b. Do you intend to submit for ptans examination a separate RESGheck Report (for UA
alterative trade offs under the PRESCRIPTIVE COMPLIANCE PATH)? No
2.c. Do you intend to hire a HERS RATER to prepare reports and go with an ENERGY
PERFORMANCE PATH? NO
2.d. Other ENERGY PERFORMANCE SOFTWARE method? See attached Manuat JB l,oad
catculation and heating system summary
'{Lt
s\
.\)
.\
-N
1
Feedback: White your ptans do reference the 2018 IECC code and inctuded some R-vatues and U-
factor notations, it is unknown which energy path you intend to buil,d to. Written confirmation most
hetpfut so Garfield County Buitding lnspectors have correct understanding during fietd
inspections. Based on your submittal it remains unclear if you desire to go strictty with Tabte
R402.1.2 Ctimate Zone 5 assembties? Or if you desire any buil,ding or system design "trade offs" for
the as-built construction.
Please answer items 1-2d comptetety and send your written response by email to Gotl,een Wirth,
Pta n s Exa m i n e r, cwirth@ga rf ield-cou nttr. co nr
Thanks for your efforts putting this ADU project apptication -- I Look forward to seeing it move forward.
Buitding Ptans Examiner
Garfietd County Community Devetopment
108 Bth Street, Suite 401
(970) 945-1 377 ext 1 61 0
cwirth@ga rf ietd-county.com
2