HomeMy WebLinkAboutApplicationCommunity Development Department
108 8th Street, Suite 401
Glenwood Springs, CO 81601
leTole4s-8212
www. ga rfie I d-cou nW.co m
Garfield County
BUILDING PERMIT
APPLICATION
WPE OF CONSTRUCTION
:E oemoliiion
Home (Singl e or Multi-Level)
Duplex or Townhome).25 sf
Dwelling Unit (ADU)- MAXIMUM SIZE
Reroof
FEET
PARTIES
property owner: West Ranch LLC c/o Anne and Laurer phone:781
Mailing Address: 33 Sunhill Lane, Newton Center MA 02459
Emait Address. anne@sperryi nc. com
Janckila Construction Phone:970Contractor:
Mailing Address:75 Buckskin Drive Carbondale CO 81623
Email Address. pete@jancki laconstruction. com
Architect: Forum Phi Architecture: Mark Hardeman Phone:970 +q-
Mailing Address: 210 E Hyman Ave. Suite 202, Aspen CO 8161 1
Email Addresr. mhardema r.com
f
\
Engineer:Caryatid Structural Phone:970 239-1187
Mailing Address:P.O. Box 1214 Carbondale CO 81623
Emait Addresr. elizabeth@caryatidstructural.com
Mailing Address:
Manufactured Home lnstaller:Phone:
Describe Work:New construction of a single fam ily residence on Lot 2 with an attac
garage, solar panel array and new d riveway access on Lot 2 &3
JobAddress: TBD County Road 102
Assessor's parcet Numbe r. 239 1 201 OO27 g & 2391 20 1 00211
su6. Hunt Ranch bt2&3 Btock
Owne/s Valuation of Work: S- Property Size (Sq. Ft. or Acresf : 70 ACfeS
Sq. Ft. of Building:5486.25 Height:21',g og ploorr. single
Class of Work:Addition
Garage:Attached
Remodel/Alteration
Detached
Driveway
Permit:
COIUTINUED
Septic:Community
Type of Heat:Propane Electric Other
mpt Permit #:
GRB24-D-9
T{OTIGE
Authoritv. This application for a Building Permit must be signed by the Owner of the property, described above,
or an authorized agent. lf the signature below is not that of the Owner, a separate letter of authority, signed by
the Owner, must be provided with this Application.
Legal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for
purposes of inspections by the Building Division.
Other Permits. Multiple separate permits may be required: (1) State Electrical Permit, (2) County OWTS Permit,
(3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access
or a State Wastewater Discharge Permit.
Void Permit. A Building Permit becomes n
of the date of issuance and if work is suspe
CERTIFICATTON
I hereby certify that I have iead this Application and that the information contained above is true and correct. I
understand that the Building Division accepts the Application, along with the plans and specifications and other data
submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming completeness
of the submittals and approval of this Application, a Building Permit will be issued granting permission to me, as
Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the Building Division. ln
consideration of the issuance of the Building Permit, I agree that I and my agents will comply with provisions of any
federal, state, or local law regulating the work and the Garfield County Building Code, OWTS regulations and
applicable land use regulations (County Regulation(s)). All County development requiring a permit, except for
residential uses, are subject to Article 7 of the Land Use and Development Code. I acknowledge that the Building
Permit may be suspended or revoked, upon notice from the County, if the location, construction or use of the
structure{s) and facility(ies), described above, are not in compliance with County Regulation(s) or any other
applicable law.
I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I
further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1) requiring
the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction or use of the
structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law. Review of this
Application, including submittals, and inspections of the work by the Building Division do not constitute an
acceptance of responsibility or liability by the County of errors, omissions, or discrepancies. As the Owner, I
acknowledge that responsibility for compliance with federal, state and local laws and County Regulations rest with
me and my authorized agents, including without limitation my architect designer, engineer andl or builder.
I hereby acknowledge that I have read and understand the Notice and Certification above, as well as, have
provided the required information which is correct and accurate to the best of my knowledge.
ull and void if the work authorized is not commenced within 180 days
'
nded or abandoned for a period of 180 days after commencement.
l-'1
Anne Sperry ( ) 9r^-".^7t1t24
n
ItttaturalGas n
n
Property Owner Print and Sign /Date
OFFICIAT USE ONLV \
Special Conditions:6ee atfa aheal Q/VD / TA/VS
Adiusted Valuation:./7q.uzqg8 Plan Check Feel rl9uv /7 'iwIr/7r5 Man'dl4lee'Misc. Fees:
RItrEBD 2,
'"V'ibg.sr Fees Paid: ^ /\+b.H ,D"ff*F,^t BP No:
Tt-fl_E.8Eb
OWTS No: '
S-agT-Rgr i
Setbacks:occGroup: IR0 const.tveTt p6 R*Zoning:
0t li,e"BUILDING / PTANNING DIV]SION :
Signed Approval Date
ENERGY COMPLIANCE SHEET REQUIREMENTS:
Effective June 30, 2023 Please provide details showing how building complies / meets Garfield County's
adopted 2018 IECC and Glimate Zone 5.
Depict and show outline the structure's building thermal envelope. Outline should clearly show portions
of the building to be conditioned inside the envelope (and label or otherurise identify any areas remaining
unconditioned outside this envelope)
Energy Compliance Plan should further include:
Chosen Energy Compliance Pathr Prescriptive: Cross Sections of insulated assemblies including the selected material/ R-Value
and U-Values to comply with IRC Table R402J.2r U-Factor Alternative: Provide a ResCheck Report. Total U-Factor Alternative: Provide software generated submittal design reports and inspection
checklist for any RESNET ERI index or other performance path designs
Air sealing details around openings, pipes, penetrations, joints
Fenestration U-factors
Provide mechanical system design details including proposed efficiency rates, types of equipment, fuel
types, locations
Energy efficient lighting specifications - 90% to be high-efficacy (LED complies)
Manual J Report required for new building structures and new equipment installations,
STRUGTURAL PLANS: Please provide the following information on the structural plans.
r SOILS REPORT - lf the project is located in a subdivision with a final plat requiring site specific
soils investigation report or if Structural plans make a specific reference to a soils report, then a
copy of the soils report is required to submit a building permit application.. Design specifications to include roof and deck snow load, wind and seismic design and frost
depth.o Foundation plan showing complete footing and foundation dimensions.
o Footing and foundation details specifying reinforcement and referenced on plans.
. Framing plans for each floor level and roof. All beams, columns, joists, rafters and trusses
specified. Pre-manufactured structures require the engineers stamp, signature and date.r Framing /connection details, braced wall lines, shear wall schedule, location and hold downs.
NOTE: lf any required information is missing, delays in issuing the permit are to be expected. lf
determined by the Building Official that additional information is necessary to review the application
and/or plans for compliance, the application may be placed on hold until the required information is
provided. Work may not proceed without the issuance of a permit.
The Building Division will collect a Plan Review fee at time of application submittal. The permit fee, as
well as any Road lmpact fees will be collected when the permit is issued.
The permit application must be signed by the owner or by person having written authority from the owner
to act as their representative.
Building cannot be occupied until a Certificate of Occupancy (CO) is issued. Using the building without a
CO will be considered an illegal occupancy and may be grounds for vacating the premises. (Final/CO
inspection requirements will be attached to your approved field set of plans.)
I hereby acknowledge I have read, understand and will abide by the requirements of this
checklist.
owner Print Anne sPerry Sign:
a9*V Date: 7t1t24
GaffiFd ewre:erffY
BUILDING DEPARTnWEN'T
1o8 Eigbth Street Suite 407; Gtenwood Springt cO 81601
Tel: (970) 945-8272
Buil ng lssues
Defa
P R EVilE WC FfrHC
Permit No: BLRE-/7*kg g/0
Planning/Z oning lssues
il57
.,oa/*3?Ox /8 =.J* /27/ Y sz- ?
7ah'o 2b0? y J7. =-
t
35 ft. Streanr Setbacks
od Flain
Building Height
ToningSign-Off
Road lmpact Fees tr F
G.rade! ToPograPhY 40%
Planning lssues
Subdivision Plat
ao46?z
&T FF,D 705. oa
D eri ion
E *g i *eered Fo*rd+t ios*
6pFA4+-?
DrivewaY Fernnit
Su D
Grade/ ToPograPhY 30%
Attach Residential Plan Review List
Subdivision Plat Slo*es
Fire DePartment Review
Valuation Determinationl Fees
Line Pla ns1 StamPs/ Sticker
ttach Conditions
Application Signed
Energy Cornpliance Path/Plan Received
Plan Reviewer to Sign APPlication
Parcel/ Schedule No.
40# Snowload Letter - M'anuf" Homes
Soils Report zl-VZ.bt
F/S //?/x 7/,6 g= 3t4qg5,s8
& Suennm
4 5t ozo
lb los
0zg
{XgfrN*['{(}t-H' $CIf L$ t{g:Pffh{T
mmx"xn:,gJXl$*F
f {zqrnfl,ds