Loading...
HomeMy WebLinkAboutApplicationCommunity Development Department 108 8th Street, Suite 401 Glenwood Springs, CO 81601 leTole4s-8212 www. ga rfie I d-cou nW.co m Garfield County BUILDING PERMIT APPLICATION WPE OF CONSTRUCTION :E oemoliiion Home (Singl e or Multi-Level) Duplex or Townhome).25 sf Dwelling Unit (ADU)- MAXIMUM SIZE Reroof FEET PARTIES property owner: West Ranch LLC c/o Anne and Laurer phone:781 Mailing Address: 33 Sunhill Lane, Newton Center MA 02459 Emait Address. anne@sperryi nc. com Janckila Construction Phone:970Contractor: Mailing Address:75 Buckskin Drive Carbondale CO 81623 Email Address. pete@jancki laconstruction. com Architect: Forum Phi Architecture: Mark Hardeman Phone:970 +q- Mailing Address: 210 E Hyman Ave. Suite 202, Aspen CO 8161 1 Email Addresr. mhardema r.com f \ Engineer:Caryatid Structural Phone:970 239-1187 Mailing Address:P.O. Box 1214 Carbondale CO 81623 Emait Addresr. elizabeth@caryatidstructural.com Mailing Address: Manufactured Home lnstaller:Phone: Describe Work:New construction of a single fam ily residence on Lot 2 with an attac garage, solar panel array and new d riveway access on Lot 2 &3 JobAddress: TBD County Road 102 Assessor's parcet Numbe r. 239 1 201 OO27 g & 2391 20 1 00211 su6. Hunt Ranch bt2&3 Btock Owne/s Valuation of Work: S- Property Size (Sq. Ft. or Acresf : 70 ACfeS Sq. Ft. of Building:5486.25 Height:21',g og ploorr. single Class of Work:Addition Garage:Attached Remodel/Alteration Detached Driveway Permit: COIUTINUED Septic:Community Type of Heat:Propane Electric Other mpt Permit #: GRB24-D-9 T{OTIGE Authoritv. This application for a Building Permit must be signed by the Owner of the property, described above, or an authorized agent. lf the signature below is not that of the Owner, a separate letter of authority, signed by the Owner, must be provided with this Application. Legal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for purposes of inspections by the Building Division. Other Permits. Multiple separate permits may be required: (1) State Electrical Permit, (2) County OWTS Permit, (3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access or a State Wastewater Discharge Permit. Void Permit. A Building Permit becomes n of the date of issuance and if work is suspe CERTIFICATTON I hereby certify that I have iead this Application and that the information contained above is true and correct. I understand that the Building Division accepts the Application, along with the plans and specifications and other data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming completeness of the submittals and approval of this Application, a Building Permit will be issued granting permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the Building Division. ln consideration of the issuance of the Building Permit, I agree that I and my agents will comply with provisions of any federal, state, or local law regulating the work and the Garfield County Building Code, OWTS regulations and applicable land use regulations (County Regulation(s)). All County development requiring a permit, except for residential uses, are subject to Article 7 of the Land Use and Development Code. I acknowledge that the Building Permit may be suspended or revoked, upon notice from the County, if the location, construction or use of the structure{s) and facility(ies), described above, are not in compliance with County Regulation(s) or any other applicable law. I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1) requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law. Review of this Application, including submittals, and inspections of the work by the Building Division do not constitute an acceptance of responsibility or liability by the County of errors, omissions, or discrepancies. As the Owner, I acknowledge that responsibility for compliance with federal, state and local laws and County Regulations rest with me and my authorized agents, including without limitation my architect designer, engineer andl or builder. I hereby acknowledge that I have read and understand the Notice and Certification above, as well as, have provided the required information which is correct and accurate to the best of my knowledge. ull and void if the work authorized is not commenced within 180 days ' nded or abandoned for a period of 180 days after commencement. l-'1 Anne Sperry ( ) 9r^-".^7t1t24 n ItttaturalGas n n Property Owner Print and Sign /Date OFFICIAT USE ONLV \ Special Conditions:6ee atfa aheal Q/VD / TA/VS Adiusted Valuation:./7q.uzqg8 Plan Check Feel rl9uv /7 'iwIr/7r5 Man'dl4lee'Misc. Fees: RItrEBD 2, '"V'ibg.sr Fees Paid: ^ /\+b.H ,D"ff*F,^t BP No: Tt-fl_E.8Eb OWTS No: ' S-agT-Rgr i Setbacks:occGroup: IR0 const.tveTt p6 R*Zoning: 0t li,e"BUILDING / PTANNING DIV]SION : Signed Approval Date ENERGY COMPLIANCE SHEET REQUIREMENTS: Effective June 30, 2023 Please provide details showing how building complies / meets Garfield County's adopted 2018 IECC and Glimate Zone 5. Depict and show outline the structure's building thermal envelope. Outline should clearly show portions of the building to be conditioned inside the envelope (and label or otherurise identify any areas remaining unconditioned outside this envelope) Energy Compliance Plan should further include: Chosen Energy Compliance Pathr Prescriptive: Cross Sections of insulated assemblies including the selected material/ R-Value and U-Values to comply with IRC Table R402J.2r U-Factor Alternative: Provide a ResCheck Report. Total U-Factor Alternative: Provide software generated submittal design reports and inspection checklist for any RESNET ERI index or other performance path designs Air sealing details around openings, pipes, penetrations, joints Fenestration U-factors Provide mechanical system design details including proposed efficiency rates, types of equipment, fuel types, locations Energy efficient lighting specifications - 90% to be high-efficacy (LED complies) Manual J Report required for new building structures and new equipment installations, STRUGTURAL PLANS: Please provide the following information on the structural plans. r SOILS REPORT - lf the project is located in a subdivision with a final plat requiring site specific soils investigation report or if Structural plans make a specific reference to a soils report, then a copy of the soils report is required to submit a building permit application.. Design specifications to include roof and deck snow load, wind and seismic design and frost depth.o Foundation plan showing complete footing and foundation dimensions. o Footing and foundation details specifying reinforcement and referenced on plans. . Framing plans for each floor level and roof. All beams, columns, joists, rafters and trusses specified. Pre-manufactured structures require the engineers stamp, signature and date.r Framing /connection details, braced wall lines, shear wall schedule, location and hold downs. NOTE: lf any required information is missing, delays in issuing the permit are to be expected. lf determined by the Building Official that additional information is necessary to review the application and/or plans for compliance, the application may be placed on hold until the required information is provided. Work may not proceed without the issuance of a permit. The Building Division will collect a Plan Review fee at time of application submittal. The permit fee, as well as any Road lmpact fees will be collected when the permit is issued. The permit application must be signed by the owner or by person having written authority from the owner to act as their representative. Building cannot be occupied until a Certificate of Occupancy (CO) is issued. Using the building without a CO will be considered an illegal occupancy and may be grounds for vacating the premises. (Final/CO inspection requirements will be attached to your approved field set of plans.) I hereby acknowledge I have read, understand and will abide by the requirements of this checklist. owner Print Anne sPerry Sign: a9*V Date: 7t1t24 GaffiFd ewre:erffY BUILDING DEPARTnWEN'T 1o8 Eigbth Street Suite 407; Gtenwood Springt cO 81601 Tel: (970) 945-8272 Buil ng lssues Defa P R EVilE WC FfrHC Permit No: BLRE-/7*kg g/0 Planning/Z oning lssues il57 .,oa/*3?Ox /8 =.J* /27/ Y sz- ? 7ah'o 2b0? y J7. =- t 35 ft. Streanr Setbacks od Flain Building Height ToningSign-Off Road lmpact Fees tr F G.rade! ToPograPhY 40% Planning lssues Subdivision Plat ao46?z &T FF,D 705. oa D eri ion E *g i *eered Fo*rd+t ios* 6pFA4+-? DrivewaY Fernnit Su D Grade/ ToPograPhY 30% Attach Residential Plan Review List Subdivision Plat Slo*es Fire DePartment Review Valuation Determinationl Fees Line Pla ns1 StamPs/ Sticker ttach Conditions Application Signed Energy Cornpliance Path/Plan Received Plan Reviewer to Sign APPlication Parcel/ Schedule No. 40# Snowload Letter - M'anuf" Homes Soils Report zl-VZ.bt F/S //?/x 7/,6 g= 3t4qg5,s8 & Suennm 4 5t ozo lb los 0zg {XgfrN*['{(}t-H' $CIf L$ t{g:Pffh{T mmx"xn:,gJXl$*F f {zqrnfl,ds