HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
B LRE-0 9-23-8 334
James Mindling 2012 lrrevocable Family Trust
625 sq ftADU (Accessory Dwelling Unit) above 699 sq ft gurage
30 St Finnbar Road, Carbondale
St Finnbar Farm Subdivision, LotT
1) ALL WORK SHALL COMply WITH THE 2015 TNTERNATIONAL RESTDENTIAL CODE (l.R.C.)AND 2018
I NTERNATIONAL ENERGY CONSERVATION CODE (I.E.C.C.)
2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE
ATTACHED "GARFIELD COUNTY BUILDING REOUIREMENTS". NUMBER REFERENCES NOTED ON
PLANS REFER TO SPECIFIC ITEMS ON THIS LIST.
3) ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL
ROUGH.IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS
REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.
4) WILDFIRE MITIGATION RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE MITIGATION AND
DEFENSIBLE SPACE RECOMMENDATIONS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE
DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COMMUNITY DEVELOPMENT WEBSITE FOR
ADDITIONAL I N FORMATION.
5) OPEN HOLE SOTLS REPORT tS REOUTRED AT FOOTING INSPECTION AND PRIOR TO ANY CONCRETE
POUR. PROVIDE COPY OF GEOTECHNICAL ENGINEERS REPORT TO THE BUILDING INSPECTOR.
3,000 PSF.
6) pRE-ENGINEERED ROOF TRUSSES. HAVE ENGINEERING FOR BUILDING INSPECTOR AT TIME OF
FRAME INSPECTION.
7) ALL HtcH STRENGTH BOLTTNG AND FTELD WELDING REOUIRES SPECIAL INSPECTOR. PROVIDE
APPROVAL REPORTAT FRAMING INSPECTION (MAY BE REOUIRED BASED ON BUILDING INSPECTOR
DISCRETION BASED UPON FIELD OBSERVATION OF ON-SITE CONDITIONS AT TIME OF FRAMING
TNSPECTTON).
8) A LOT tMPROVEIVIENT CERT|F|CATE, SEALED BY A COLORADO LICENSED SURVEYOR lS REOUIRED AT
FOUNDATION INSPECTION TO VERIFY STRUCTURE _ INCLUDING PROPOSED ROOF OVERHANGS,
DECKS AND OTHER PROJECTIONS _ IS IN COMPLIANCE WITH MINIMUM SETBACKS AND/OR
BUILDING ENVELOPE REOUIREM ENTS.
9) FLOODPLAIN ELEVATION CERTIFICATE: A FLOODPLAIN ELEVATION CERTIFICATE (FEMA FORM),
SEALED BY A COLORADO PROFESSIONAL LICENSED SURVEYOR, IS REOUIRED PRIOR TO FRAME
INSPECTION. THIS CERTIFICATE SHALL VERIFY THAT FINISH FLOOR ELEVATION IS A MINIMUM OF 12
I NCH ES ABOVE FLOODPLAI N ELEVATION.
1O) ANY CONSTRUCTION ACTIVITY THAT CHANGES THE BASIC CHARACTER OR TOPOGRAPHY OF THE
NATURAL LAND LOCATED IN THE 'IOO-YEAR FLOODPLAIN MUST FIRST OBTAIN A "FLOODPLAIN
DEVELOPMENT PERMIT" THROUGH GARFIELD COUNTY'S PLANNING DEPARTMENT.
11) CAREFUL: MUST NOT REMOVE VEGETATION FROM 35 FT RIPARIAN ZONE MEASURES FROM THE
HIGH WATER MARK.
12) BLOWER DOOR TEST tS REOUTRED FOR THE ADU - MUST SUBMTT BLOWER DOOR TEST REPORT TO
GARFIELD COUNTY COMMUNIry DEVELOPMENT DEPT. OFFICE PRIOR TO SCHEDULING FINAL
BUILDING INSPECTION / C.O. FINAL.
13) ADU ABOVE GARAGE DESTGNED UNDER THE PRESCRTPTTVE PATH USING 2018 IECC TABLE R402.1.2.
MANUAL J AND S REPORTS SCANNED INTO LASERFICHE. WHOLE.HOUSE MECHANICAL
VENTILATION SYSTEM SHALL BE INSTALLED. SEE COVER SHEET AOO1 .
$