HomeMy WebLinkAboutEngineer's Framing LetterSTRUCTUNEERING, INC. 7322 SW FWY., SUITE-780, HOUSTON, TX 77074; (713)779-1701, (713)779-1708
09/06/2024 1160-9399
CITADEL SELF-STORAGE
DONEGAN RD.,
GLENWOOD SPRINGS, CO
Dear Noah,
This letter is to declare that the partition panels at the first-floor (highlighted on sheet 2)
could be installed after the concrete is poured on the second-floor deck.
Sincerely,
Ashwin Mupparapu, P.E.