Loading...
HomeMy WebLinkAboutCommercial Plan Check ListGarfield County BUILDING DEPAR|MENT 1oB Eighth Street, Suite 4o1, Glenwood Springs, co 87607 Tel: (97O) 945-8212 Commercial PIan Review Checklist Reference Building Code: 2075 IRC Permit Number:jt-r.o-off -Lft- M srrp t: DETERMTNE THE usE oR usEs oF THE BUILDING a -lt& I t cr r' "='; Determine the appropriate occupancv .lrrriiil.ion(s) S + 5- \ b. Check for potential incidental accessory occupancies ;lf A c. Determine if the building, if a mixed-occupancy condition, was designed usilg the separated, non-separated or accessory occupancy provisions p5$-Sf,?' d. Review for fire sprinkler requirements based on occupancy classification and related factors t'lrrr"6@A e. Check for hazardous materials that will be used or stored within buildinC Zc,tJDtldtf [Kl sre p z:F DETERMINE DETAI LED BUITDING ATTRI BUTES. Determine square footage per floor- r Determine grade plane elevation -r Determine height of building in feet -. Determine height in stories above grade plane .z . Checkfor basements z . Check for mezzanines, or confirm areas labeled as mezzaninesl2a"gr r Determine lowest level of fire department vehicle access . Determine if building is required to be fire sprinklered or not t) b STEP 3: DETERMINE THE TYPE OF CONSTRUCTION Ta $f srrn c:DETERMINE TOCATION OF THE BUILDING ON THE SITE A Determine amount of open frontage e Determine fire resistance of exterior walls E Determine protection of openings A ldentify any assumed property lines between two buildings on the same lot [f Review projections Et srep s:7 DETERMINE ATLOWABLE BUITDING SIZE A. Determine tabular building height and area- B. Calculate height increases in stories ' C. Calculate height increases in feet a D. Calculate area increase- i. Sprinkler increase i)L ii. Frontage increase l)A {g -$ oec. r 13'o60 7a'r'tor-t$ If$-tl ocr t l75e .tuucr'erco f.;tuort{- t9 {86 tQ Ft' ffi sre r o: DETERMTNE ArLowABrE BurrDrNG AREA tF Mutl-sroRy BUILDING STEP 7:DETERMI NE MIXED.OCCUPANCY APPLICATIONS i. Determinefire-resistiveseparationrequirements ii. Check missed area ratio Commerciol Plan Review Checklist - Poge 2 STEP 8:COMPARE ACTUAL CONDITIONS VS. MAXIMUM ALTOWABTES p sree s, REVTEW sPEctAL ocuPANcY PRovlsloNs STEP 10:REVIEW MEANS OF EGRESS tr STEP 11: DETERMINE ACCESSIBILITY REQUIREMENTS w STEP 12:DETERMINE FIRE RESISTANCE OF ASSEMBLIES tr STEP 13:DETERMINE DETAITED FIRE PROTECTION REQUIREMENTS &'FIRE AREAS p stev uz DETERMTNE tNTERtoR FtNtsH REQUTREMENTS STEP 15: DETERMINE INTERIOR ENVIRONMENT REqUIREMENTS ffi STEP 16:DETERMINE Att OTHER APPLICABLE DETAILED CODE REQUIREMENTS Commerciol Plon Review Checklist - Poge 3 ffi srrn rz:DETERMINE G ENERAT STRUCTURAL REQUI REMENTS o 40 PSF up to 7000 feet elevation o 50 PSF 7001 - 8000 feet elevation o 75 PSF 8001 - 9000 feet elevation o 100 PSF above 9001 feet elevation o 36 inches up to 8000 feet elevation o 42 inches over 8001 feet elevation *NO[!: Not oll of the above steps will apply to oll proiects.