Loading...
HomeMy WebLinkAboutUpdated OWTS Design Plan - 09.26.2024SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS W S S S S Unit #7 (3 Bed) Unit #3 (1 Bed) Unit #8 (1 Bed) Unit #4a (1 Bed) Unit #4b (1 Bed) Unit #2 (1 Bed) Unit #1 (1 Bed) Unit #9 2 Bed) Un i t # 1 1 ( 1 B e d ) Unit #6 (1 Bed) RV # 5 RV #1 5 RV #1 2 RV # 1 0 RV # 1 6 RV # 1 4 R V # 1 3 Shed Storage Units Storage Units Existing Septic Field SS SS SSSS R116' MIN. WELL SETBACK FV FV FV FV FV FV FV FV FV FV FV FV FV FV FV FV Union Pacific Railroad 16 t h S t r e e t / C . R . 3 1 1 Main Street / Highway 6 SS SS SS SS X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X > > > > > > > > > OE OE OE OE OE OE OE OE OE OE OE OE OE X X X X X X X X X X X X X X OE OE OE 10' MIN. 6' MIN., TYP. CONSTRUCT 2 ADD'T BEDS (4x13 QUICK 4 UNITS EACH) PR O P E R T Y L I N E FLUSH VALVE ASSEMBLY, TYP. (4 PER BED) EXISTING 2,000-GALLON SINGLE-COMPARTMENT PRECAST CONCRETE SEPTIC TANK INSTALL TWO (2) ADD'T 1-1/2"Ø SCH.40 PVC DISTRIBUTION LATERALS, TYP. EX. 1-1/2"Ø SCH.80 PVC TRANSPORT PIPE REPLACE THE EX. 4-ZONE DISTRIBUTION VALVE WITH A 6-ZONE DISTRIBUTION VALVE EXISTING 1,000-GALLON TWO-COMPARTMENT PRECAST CONCRETE SEPTIC TANK W/ HIGH HEAD DOSING PUMP EXISTING SEPTIC TANKS (2000± GALLONS SS SS 10 ' S E T B A C K 1-1/2"x1-1/4" SCH.40 PVC REDUCER, TYP. INSPECTION PORT, TYP. (4 PER BED) FV FV FV FV FV FV FV FV FV FV FV FV TP#2 PROFILE PIT TP#1 TP#3 TP#4 TO SUPPORT: UNITS #6, 9 & 11 RV(s) #5, 10, 12, 15, & 16) FV FV FV FV FV FV FV FV FV FV FV FV FV FV FV FV DV FM FM FM FM FM FM FM FM FM FM FM FM FM 1- 1 / 2 ' ' Ø 1- 1 / 2 ' ' Ø 1- 1 / 2 ' ' Ø 1- 1 / 2 ' ' Ã ˜ 1- 1 / 2 ' ' Ã ˜ 1- 1 / 2 ' ' Ã ˜ 1- 1 / 2 ' ' Ø 1- 1 / 2 ' ' Ø 1- 1 / 2 ' ' Ø EX. BED (52 QUICK 4 UNITS) EX. BED (52 QUICK 4 UNITS) EX. BED (52 QUICK 4 UNITS) EX. BED (52 QUICK 4 UNITS) Scale: N.T.S. Site & Soils Evaluation Scale: N.T.S. Purpose and Existing System Scale: N.T.S. Flush Valve Scale: N.T.S. Automatic Distributing Valve 00 20'40' Scale: 1" = 20' 37110DERIC J O N WA L T E R COL O R A D O LICE N S E D P R O F E SSIONA L E N G INEER 9/25/24 NORTH RevisionDate 923 Cooper Avenue, Ste. 201 Glenwood Springs, CO 81601 tele: 970.945.5252 www.bu-inc.com Engineer or Surveyor Seal Sheet Client Information: Project No.: Filename: Designer: Drafter: Date: N: \ P r o j e c t s \ 2 0 1 7 \ 1 7 0 2 6 - 3 M - G r e e n D i a m o n d \ d w g \ 1 7 0 2 6 - O W T S - 2 0 2 4 . d w g 9/ 2 5 / 2 0 2 4 3 : 5 3 P M Subsurface Utility Engineering (SUE) Required Project: If "Yes", SUE Certification by: Firm: Job #: Date: Agency Approval Agency: Dept: By: Date: Comments: 9/25/24 DJW DJW 17026-owts-2024.dwg 17026 970.200.6020 Grand Junction, CO 81505 737 Corral Drive 3M Investors, LLC Si l t , C o l o r a d o 9/25/24 Rev. inspection ports & note #2.A Sy s t e m R e p a i r On s i t e W a s t e w a t e r T r e a t m e n t S y s t e m ( O W T S ) Gr e e n D i a m o n d R e n t a l s & S t o r a g e C.1 No N/A N/A N/A ORIGINAL SOIL EVALUATION (2017) 1.SOIL PERCOLATION TESTS IN THE NATIVE SOILS (SILTY CLAY LOAM) RANGED FROM 43-75 MPI (60 MPI AVERAGE) INDICATING A SOIL TYPE OF 3 AND AN LTAR OF 0.35 GPD/SF. 2.NO GROUNDWATER WAS ENCOUNTERED OR OBSERVED IN THE 8-FOOT DEEP PROFILE PIT. SITE EVALUATION 1.SITE AND SOIL EVALUATIONS WERE PERFORMED BY: DERIC J. WALTER, PE BOUNDARIES UNLIMITED INC. 923 COOPER AVE., STE. 201 GLENWOOD SPRINGS, CO 81601 970.945.5252 2.EVALUATION DATE(S): SEPTEMBER 24, 2017. 3.SETBACK REQUIREMENTS FOR A TREATMENT LEVEL 1 (TL1) STA TRENCH/BED, UNLINED SAND FILTER OR SEEPAGE PIT (PER TABLE 7-1) AND AN ADWF=1,199 GPD: 3.A.SPRING OR WELL=100' + 16' = 116' 3.B.POTABLE WATER SUPPLY LINE=25' 3.C.POTABLE WATER SUPPLY CISTERN=25' 3.D.DWELLING=20' 3.E.PROPERTY LINE, PIPE OR LINED IRRIGATION DITCH=10' 3.F.INTERMITTENT IRRIGATION LATERAL, INFILTRATION STRUCTURE=25' 3.G.LAKE, WATER COURSE, IRRIGATION DITCH, STREAM OR WETLAND=50' + 16' = 66' 3.H.DRY GULCH, CUT BANK OR FILL AREA=25' 3.I.SEPTIC TANK=5' 3.J.RESTRICTIVE LAYER OR GROUNDWATER (VERTICAL): 4' (TL 1, GRAVITY FEED) 3.SETBACK REQUIREMENTS FOR THE SEPTIC TANK SHALL BE (PER TABLE 7-1): 3.A.SPRING OR WELL=50' 3.B.POTABLE WATER SUPPLY LINE=10' 3.C.POTABLE WATER SUPPLY CISTERN=25' 3.D.DWELLING=5' 3.E.PROPERTY LINE, PIPE OR LINED IRRIGATION DITCH=10' 3.F.INTERMITTENT IRRIGATION LATERAL, INFILTRATION STRUCTURE=10' 3.G.LAKE WATER COURSE, IRRIGATION DITCH, STREAM OR WETLAND=50' 3.H.DRY GULCH, CUT BANK OR FILL AREA=10' 3.I.STA TRENCH/BED, UNLINED SAND FILTER OR SEEPAGE PIT=5' SURFACE 12" SILTY CLAY LOAM (TYPE-3) Vicinity Map 1"=2000' TOPSOIL 7' ± NO R T H SITE To New Castle Hwy. 6 Silt PREFABRICATED PIPE SUPPORT OR CHEMICAL RESISTANT ZIP TIE HANGING SYSTEM (PIPE @ 6" MIN. ABOVE BASE ) MAINTENANCE NOTES 1.TO ENCOURAGE THE HEALTH AND LONGEVITY OF THE OWTS SYSTEM, THE OWNER SHALL CONSIDER THE FOLLOWING: 1.A.MINIMIZE THE AMOUNT OF WATER THAT GOES DOWN THE DRAIN, THE BETTER YOUR SYSTEM WILL WORK. 1.B.MINIMIZE SOLIDS GOING DOWN THE DRAIN. 1.C.ELIMINATE GARBAGE DISPOSALS OR KEEP THE USE OF GARBAGE DISPOSALS TO A MINIMUM. 1.D.MINIMIZE GREASE AND OILS THAT GO DOWN THE DRAIN. 1.E.USE LINT FILTERS ON LAUNDRY MACHINE DRAINS. 1.F.KEEP SAND AND DIRT OUT OF THE BUILDING DRAIN. 1.G.AVOID FLUSHING SANITARY NAPKINS OR PAPER PRODUCTS OTHER THAN TOILET PAPER. 1.H.DO NOT USE LYE-BASED DRAIN UNCLOGGER CHEMICALS SUCH AS DRAINO, OVEN-OFF, OR OTHER STRONG CLEANING AGENTS. 1.I.DO NOT PUT ANY “ROOT DETERRENTS” DOWN THE DRAIN. 1.J.DO NOT POUR PAINT THINNER, PESTICIDES, PAINTS OR PHOTO LAB CHEMICALS DOWN THE DRAIN 1.K.MINIMIZE USE OF CHLORINE BLEACH AND TOILET ADDITIVES. 2.THE OWNER SHALL CONTRACT WITH A SEPTIC TANK INSPECTOR TO INSPECT THE TANK ANNUALLY FOR GREASE AND SEDIMENT ACCUMULATION. THE INSPECTOR SHALL REMOVED AND PROPERLY DISPOSED OF ACCUMULATED GREASE AND SEDIMENT AS NEEDED TO ENSURE PROPER FUNCTION OF THE SYSTEM. 1-1/4"Ø PVC DISTRIBUTION PIPE 1-1/4"Ø PVC ELBOW 1"Ø BALL VALVE & TREADED ASSEMBLY10"Ø IRRIG. VALVE BOX 1-1/4" x 1" PVC REDUCER 1-1/2"Ø SCH.80 PVC FROM PUMP EX. STYROFOAM INSULATED FIBERGLASS LID WITH STAINLESS STEEL BOLTS AND URETHANE GASKET 24"Ø PVC ENCLOSURE GRAVEL BASE REPLACE THE EX. VALVE WITH AN ORENCO 6 ZONE 1-1/2"Ø DISTRIBUTING VALVE ASSEMBLY (V6606A) CHECK VALVES ORIGINAL SYSTEM DESIGN NOTES: 1.ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH GARFIELD COUNTY ONSITE WASTEWATER TREATMENT SYSTEMS (OWTS) REGULATIONS, MOST CURRENT EDITION AND LOCAL AGENCY REQUIREMENTS WHICH MAY OR MAY NOT SPECIFICALLY BE NOTED ON THE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR KNOWING AND CONFORMING TO SUCH SPECIFIC DETAILS AS ARE REFERRED TO IN THE ABOVE MENTIONED REGULATIONS. THIS DRAWING DOES NOT CONSTITUTE AN OWTS PERMIT. A PERMIT MUST BE OBTAINED FROM APPROPRIATE LOCAL AGENCY. THE ENGINEER MUST OBSERVE THE CONSTRUCTED SYSTEM BEFORE BACKFILL AND PROVIDE A LETTER OF INSPECTION AS REQUIRED BY THE LOCAL AGENCY. A REQUEST FOR INSPECTION MUST BE MADE BY THE CONTRACTOR AT LEAST 48-HOURS PRIOR TO THE EXPECTED TIME OF BACKFILLING. 2.DEMAND CALCULATIONS (SEC.43.6.A.2.h) 2.A.ONE (1) THREE (3) BEDROOM RESIDENCE PLUS SIX (6) ONE (1) BEDROOM RESIDENCES PLUS TWO (2) RECREATIONAL VEHICLE (RV) SPACES USING DOSING AND TREATMENT LEVEL 1 (TL1). 2.B.AVERAGE DAILY WASTEWATER FLOW (ADWF): 2.B.1.SINGLE FAMILY DWELLING WITHOUT A LAUNDRY WASHER (NO LAUNDRY FACILITIES ONSITE): 75 gpdc - 19.5 gpdc = 55.5 gpdc. 2.B.2.TRAVEL TRAILER PARKS (RV) WITH INDIVIDUAL WATER AND SEWER HOOKUP PER UNIT (NO LAUNDRY FACILITIES ONSITE): 100 gpd 2.B.3.ADWF = (55.5 gpdc * (3 BEDROOMS * 1 UNIT+1 BEDROOM * 6 UNITS) * 2 PERSONS/BEDROOM )) + (100 gpd * 2 RVs ) = 1,199 gpd 3.SEPTIC TANK (SEC.43.9.B.2.a): 3.A.DOSING IS TO BE USED. THEREFORE, 48 HOURS OF DETENTION IS REQUIRED: ADWF*(48/hrs/24hrs) = 1,199 gpd * (48/HRS/24HRS) = 2,398 GALLONS 3.B.INSTALL A 2,000-GALLON SINGLE-COMPARTMENT TANK IN SERIES WITH A 1,000-GALLON TWO (2) COMPARTMENT TANK WITH A HIGH HEAD DOSING PUMP SYSTEM IN THE 2nd COMPARTMENT OF THE SMALLER TANK. 3.C.INSTALL AN EFFLUENT FILTER IN THE OUTLET TEE OF THE 2,000-GALLON SINGLE-COMPARTMENT TANK. 3.D.THE TANK ARE NOT SUBJECT TO BUOYANCY. 4.ABSORPTION AREA CALCULATIONS 4.A.GROUNDWATER WAS NOT ENCOUNTERED AND THE PROPERTY CONTAINS SLOPES LESS THAN 20%. THEREFORE, BUT THE ELEVATION OF THE SYSTEM IS HIGHER THAN THE ELEVATION OF THE SEPTIC TANKS. THEREFORE, THE SYSTEM SHALL BE A PRESSURE DOSED SHALLOW GRAVELLESS CHAMBER SYSTEM IN A BED CONFIGURATION. 4.B.SOILS WERE ANALYZED BY BOUNDARIES UNLIMITED INC. (SEPTEMBER 24, 2017) TO BE SILTY CLAY LOAM WITH PERCOLATION RATES BETWEEN 43-70 MINUTES PER INCH (MPI) (AVERAGE = 60 MPI). THEREFORE, THE SOIL TYPE IS CONSIDERED TO BE TYPE-3 WITH A TREATMENT LEVEL 1 LONG TERM ACCEPTANCE RATE (LTAR) OF 0.35 gpd/SF FOR TL1 4.C.MINIMUM SOIL TREATMENT AREA, A: A = ADWF = 1199 = 3,425.8 S.F. LTAR 0.35 gpd/S.F. 4.D.SIZE ADJUSTMENT FACTORS: PRESSURE DOSED BED = 1.0; CHAMBERS IN BED CONFIGURATION= 0.7 4.D.1.A, adj = 3,425.8 SF * 1.0* 0.7 = 2,399 SF 4.E.GRAVELLESS CHAMBER SYSTEM: 4.E.1.INFILTRATOR QUICK4: 2,399 SF / 12 SF/UNIT = 200 UNITS IN A MULTIPLE BED CONFIGURATION. 4.E.2.ADS ARC36 (STANDARD): 2,399 SF / 15 SF/UNIT = 160 UNITS IN A MULTIPLE BED CONFIGURATION. 5.THIS SYSTEM IS SIZED FOR TYPICAL DOMESTIC WASTES ONLY. BACKWASH OR FLUSHING FLOWS FOR REVERSE OSMOSIS UNITES OR WATER SOFTENERS AND/OR FILTERS SHOULD NOT BE INTRODUCED INTO THIS SYSTEM. 6.CLEAN OUTS ARE REQUIRED AT THE HOUSES/RV(s) AND AT ALL BENDS AND AT LEAST EVERY 100-FEET BETWEEN THE HOUSES AND THE SEPTIC TANK. 7.THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING ALL WATER TIGHT COMPONENTS THROUGHOUT THE SYSTEM TO PREVENT INFILTRATION. 8.INSTALL RISERS AS NECESSARY TO BRING ALL ACCESS PORTS TO FINAL GRADE. PORTS SHALL BE MARKED IF CAPS ARE TO BE BURIED. 9.INSTALL 3-INCHES OF BLUEBOARD INSULATION, 3-FEET WIDE, OVER SEWER AND EFFLUENT PIPE WHEREVER DEPTH IS LESS THAN 3-FEET. UNDER NO CIRCUMSTANCES SHALL COVER BE LESS THAN 2-FEET. 10.LOCATIONS OF ALL COMPONENTS MAY BE VARIED AS NECESSARY AS LONG AS ALL MINIMUM DISTANCES AND SLOPES MEET THOSE REQUIRED. To Rifle CR # 1 1 3 NOTES: 1.EFFLUENT HAS BEEN OBSERVED TO SATURATE THE SURFACE SOILS ON ALL FOUR (4) OF THE EXISTING ABSORPTION BEDS. THEREFORE, THE PURPOSE OF THIS DESIGN IS TO EXPAND THE EXISTING ABSORPTION SYSTEM TO REDUCE THE LOAD ON EACH BED. THIS WILL BE ACCOMPLISHED BY REPLACING THE EXISTING DISTRIBUTION VALVE AND ADDING TWO (2) ADDITIONAL ABSORPTION BEDS FOR A TOTAL OF SIX (6). 2.EXISTING SYSTEM: THE EXISTING SYSTEM WAS CONSTRUCTED IN 2017 AS FOLLOWS: 2.1.2000-GALLON SINGLE COMPARTMENT PRECAST CONCRETE SEPTIC TANK; 2.2.1000-GALLON TWO-COMPARTMENT PRECAST CONCRETE SEPTIC TANK WITH AN ORENCO BIOTUBE PROPAK; 2.3.PUMP: ORENCO PF3005 (30 GPM, 1/2 HP, 115V HIGH HEAD VERTICAL TURBINE WITH DEMAND DOSE CONTROLS); 2.4.TRANSPORT PIPE DIAMETER/MATERIAL: 1-1/2"Ø SCH.80 PVC; 2.5.LATERAL PIPE DIAMETER/MATERIAL: 1-1/4"Ø SCH.40 PVC; 2.6.ORIFICE SIZE/SPACING: 3/16"Ø AT 4' 0.C.; 2.7.OPERATING HEAD AT THE DISTAL END ORIFICE: 5'; 2.8.DRAIN-BACK VOLUME FROM TRANSPORT PIPE: 29 GALLONS; 2.9.FOUR (4) ABSORPTION BEDS EACH COMPRISED OF 52 INFILTRATOR QUICK4 UNITS (208 TOTAL). 3.THE DOSING SYSTEM FLOATS SHALL BE RESET ACCORDING TO THE FOLLOWING PARAMETERS: 3.1.DOSE SIZE: 100 GALLONS; 3.2.PUMP ON TIME: 200 SECONDS; 3.3.DOSES PER DAY: 12 3.4.CONTACT SCG ENTERPRISES AT 303.697.9404 OR VALLEY PRECAST, INC. AT 719.395.6764 FOR SYSTEM SPECIFICATIONS AND ADJUSTMENT PROCEDURES) BOTTOM TO BE LEVEL AND FLAT OVER ENTIRE AREA TO WITHIN 0.1'±. (TYP.). IF NECESSARY TO ACHIEVE THIS SURFACE, IMPORT CONCRETE SAND TO USE AS LEVELING MATERIAL. REMOVE ANY ENCOUNTERED BOULDERS AND BACKFILL WITH LOAMY SAND OR SANDY GRAVELS. DO NOT USE COMPACTED MATERIALS. GENERAL ABSORPTION AREA NOTES 1.INSTALL CHAMBER UNITS IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. 2.ABSORPTION BEDS SHALL NOT EXCEED 12' WIDE BY 100-FEET IN LENGTH, SHALL PARALLEL THE TOPOGRAPHY AND SHALL BE INSTALLED IN A RECTANGULAR PATTERN WHENEVER POSSIBLE. 3.THE BOTTOM OF THE ABSORPTION BED SHALL BE LEVEL AND THE BOTTOM AND SIDEWALLS MUST BE RAKED TO REMOVE ANY SOIL SMEARS INCURRED DURING THE EXCAVATION. FAILURE TO DO SO MAY REQUIRE THE CONTRACTOR TO REPLACE THE ABSORPTION FIELD AT HIS/HER OWN EXPENSE. 4.DRAINAGE SWALES ARE TO BE PROVIDED ABOVE AND AROUND THE FIELD, AS NECESSARY, TO PREVENT SURFACE RUNOFF FROM ENTERING ABSORPTION AREA. 5.NO EXCAVATION OF THE ABSORPTION FIELD IS TO BE DONE DURING WET WEATHER AND USE OF RUBBER TIRE VEHICLES OVER THE ABSORPTION AREA IS STRICTLY PROHIBITED. 6.UNSUITABLE MATERIAL EXISTING WITHIN THE FIELD SHALL BE EXCAVATED AND BACKFILL SHALL CONSIST OF IMPORTED LOAMY SAND OR SANDY GRAVEL. THE ENGINEER SHALL BE CONTACTED IF BEDROCK OR GROUNDWATER IS ENCOUNTERED IN THE EXCAVATION. 7.TOPSOIL COVER MAY BE VARIED (1-FOOT MINIMUM, 2-FOOT MAXIMUM) TO ALLOW FOR LANDSCAPING. 8.WHEN MULTIPLE BEDS ARE USED, BEDS SHALL BE SEPARATED BY 6-FEET MIN. OF UNDISTURBED SOILS. 4"Ø PERFORATED PVC PIPE. EXTEND PIPE TO REST ON BOTTOM OF THE BED COVER WITH 6" OF TOPSOIL AND REVEGETATE 12 " M I N . , 24 " M A X . INSTALL A 12"Wx24"L SPLASH BLOCK BELOW EACH INLET PIPE GRAVELLESS CHAMBER SYSTEM: INFILTRATOR QUICK 4, ADVANCED DRAINAGE SYSTEMS ARC36 (STANDARD), OR ENGINEER APPROVED EQUAL. FILL OVER THE CHAMBERS WITH UNCOMPACTED WELL GRADED LOCAL SOILS. 4"Ø COUPLING (UNION). USE A HOLE SAW TO CUT OUT CIRCLE OFF THE CENTER OF THE UNIT STANDARD INSPECTION PORT, TYP. (4"Ø PVC SOLID PIPE CUT TO FIT. LOCATE PER PLAN VIEW. ATTACH REMOVABLE CAP OR THREADED CLEANOUT ASSEMBLY. CIRCULAR IRRIGATION-STYLE VALVE BOX & COVER - LID COLOR PURPLE OR GREEN - LABEL "SEWER" Scale: N.T.S. Gravelless Pressure Dosed Chamber Absorption Bed 1-1/4"Ø PRESSURE DOSING PIPE WITH 3/16"Ø HOLES DRILLED EVERY 4' O.C., FACING UP, AND ONE (1) HOLE FACING DOWN AT THE END OF EACH TRENCH (FOR WEEPING). INSTALL A 12" PAVER OR SPLASH STONE BELOW THE DOWN FACING HOLE TO PREVENT SOIL EROSION. COVER THE CHAMBER UNITS WITH A NON-WOVEN FILTER/LANDSCAPE FABRIC TO LIMIT FINE MIGRATION INTO THE CHAMBERS