Loading...
HomeMy WebLinkAboutOwners Reply-Scope of Workopz* efk e9 ,4 fr-/# Colleen Wirth From: Sent: To: Subject: Attachments: Follow Up Flag: Flag Status: Mike McPhee < mmcconstructionllc@ hotmail.com > Sunday, September 22, 2024 9:06 AM Colleen Wirth Re: BLRE-O9-24-8881- McPhee Detached garage shop is UNDER REVIEW 24-08-11 McPHEE ADU.Pdf Follow up Flagged Hi Coleen, We are hoping to amend the plans that I turned in into an ADU( plans attached) once we get approved for hauling water. I would like to get the foundation in and frame through the winter. I will answer your questions as though the ADU will be added in the future. Answers to your questions: j.. I won't get the floor poured this winter, so the in floor radiant tubing won't be addressed untilthe water approval. lt will be electric only a. Wall/ceiling mounted heater b. No heat at this time c. Unheated until approved for water 2. a. I will make this a fire resistive assembly. lt won't take place until water is approved and then I can do rough in work in the ceiling and walls. b. lt will be seParate c. I will install a 20 minute door at the bottom of the stairs for the future ADU 3. Yes, that is correct. Once approved for water, I will begin the OWTS process a. Correct, I will need to sleeve under the footings for future sewer and water lines, but that is it for rough- ins Thanks so much for your helP, Mike and Mary McPhee From: Colleen Wi rth <cwirth @ga rfield-cou nty.com> Sent: Friday, Septembe r 20, 2024 2:52 PM To: sakkmcphee@msn.com <sakkmcphee@msn.com>; mmcconstructionllc@hotmail.com <m mcconstructionllc@ hotma il.com> Subject: BLRE-09-24-8881 - McPhee Detached garage shop is UNDER REVIEW BLRE-O9-24-8881 McPhee Detached garage shop 839 Sun King Dr Courtesy Update for Mike and MarY: Hetto, I'm now starting the plans examination for your new detached shop outside Gtenwood Springs \. "s hN 1 Before I begin stamping and red[ining the finished FIELD COPY of ptans, I want to cl.arify a few items under the work scope to ensure I review referencing correct sections of code: REQUESTING A WRITTEN RESPONSE FROM THE PROPERW OWNER(S) AS FOLLOWS: 1. The buitding appl.ication form states type of buitding heat = "e[ectric", is that correct? 1.a. wil,l. the main [eve[ garage shop have etectricaI heat mats, electrical baseboard heating, roof or ground mounted sotar arrays, walt / ceil,ing mounted heaters or other? 1.b. witt the second levet'storage'area accessed by interior stairway be heated as wett? 1 .c. witt the second story [eve[ of structure remain unheated? 2. Architecturatsheet A2 shows 5/8 type x drywatt on garage ceiting area. 2.a. Do you intend there to be a (fire-resistive assembty) or occupancy separation between the enctosed garage and the hatt / stairway / storage space above it? 2.b. Or is the storage above intended to be a continuation of the garage occupancy on main levet? 2.c.1'm trying to decipher if there is to be a 20-minute fire rated door within the buiLding space.... Or if the entirety of the whote buitding design is meant to be a garage? 3. AS prlvate owTS onslte wastewater treatment system, communlty sewer servlce and naturaI gas and propane remain bl.ack on the buitding appLication form, woutd I be correct in understanding this buitding structure witt NOT tie into an existing or proposed sewer service? 3.a. And no potabte water suppty, water piping or finished pLumbing fixtures wiLl, be instaUed within the new buitding at this time? Please repty to items 1 - 3.a. as best you can. Your written feedback witt be most hel,pful, to "stapte" the responses to the issued FIELD COPY for the Garfiel.d County Buitding lnspectors to reference and view during inspections. Cotteen Wirth Buitding Plans Examiner Garfietd County Gommunity Development 1OB 8th Street, Sulte 401 (970) 945-1 377 ext 1 61 0 cwirth@garf ietd-county.com 2