Loading...
HomeMy WebLinkAboutOWTS Design Report 05.07.2024K-CROATT{?.4. Box 4o Mar.k, CA g7o. zio.oif z / kttclz*yl alrurA@ourlott&,com Onsite Wasteweter Treafnrent System Design M"y 7, ZOZ4 Coleman Proiect I0I Monument Ridge Road Parachute, CO 81635 Parcel No. 2407 -202-26-0IA Prepared By: K-Cronk Engineering, Inc. P.O. Box I40 Mack, CO 81525 e70-25A-0572 Site Historv There is an existing residence on the site that is served by an existing onsite wastewater treatment system (OWTS) that will remain in use. The owner of the property wishes to construct a new studio accessory dwelling unit (A.D.U.) to be sened by a separate OWTS. The A.D.U. will be greater than 400 sq. ft., therefore the OWTS will be designed to accommodate a two-bedroom minimum residential loading (Garfield Counfy OWTS Regulations 43.6.A.2-C & Table 6-2, footnote 3). The site consists of approximately 6.288 acres of uncultivated native soil. Drainage is towards the west. A percolation tesVsoils &ahation and site study were conducted on the property of reference on November 13, 2009 by Hepworth-Pawlak Geotechnicalo Inc. This OWTS design has been prepared for the project based on information disclosed by the report mentioned above.k-Cronk Engineering, Inc. must be contacted to arrange a site visit prior to installation to conlirm soils lithology. An observation hole within 50' of the nronosed soil treatment area multPe urovided bv the client to ttre desien engineer for insnection. Should the soils. Iithologv differ ffi the November ls. 20og {pnort,bv Henworth-Paqlq\ 9,,eotechnilal,Inc.ffi mav be required. A discussionof the engineered OWTS design follows. alperco1ationtest/soilsevaluationisattachedforreferenceasAppendix A. The location of the perc excavation trench is shorvn in the Plot Plan included in this report. Development of Desiqn Parameters Based on the results from the November 13,2009 perc testlsoils evaluation (Appendix A), a desigt perc rate of 18 min/in. and corresponding long term acceptance rate (LTAR) of 0.60 are chosen for overall system sizing for an infiltratoi trench soil treatrnent area designed to discharge to subsoils below the 36" depth. 1 System Desisn An INFILTRAIOTR trench soil treatment system is proposed for discharge of septic effluent at the site. Construction of the system will consist of excavating level trenches in the soil treatnent area. $gg{!4g durins construction mav affect slope. therefore contractor shall verifv slope at time of installation. Sioil treatment area orientation mav be adiusted ner site vqriations to fac4itatq consistent treFch ffil contours. Each trench excavation shall be continued to a level depth of @ of the trench (see Soil Treatment Area Cross Section). If consistent trench depth cannot be maintained.lNFlIIftlIOX chambers may be installed level at 24" minimum and 48" maximum BGS. After removal of surface soils, the open excavations will be disked or scarified to promote subsurface absorption. Following completion of the trench excavations, QUICK4 STANDAfuD INFILTRATORS (or equivalent) will be uod to ionstruct a septic effluent distribution system in the open excavations. The INFILTRATOR effluent distribution system will be installed in accordance with the "Infiltrator Tecbnical Manual", available from Infiltrator Systems Inc., 123 Ehn Street, Suite 12, Old Saybrook, Connecticut 06475. Adiacent Iilf7IIRlIOfiS shall be fastened with a minimum of three (3) 7+" self-tappins screws to prevent movement and separation during backfilline. Septic effluent will be transferred from the upper trench to each of the adjacent do*nhill trenches through a serial distribution network as shown in the included graphics. The serial distribution connections between adiacent trenches will facilitate the saturation of the uphill trench before septic effluent is allowed to flow to each ofthe adjacent downhill frenches. After the INFILTRATORS are installed, synthetic filter fabric (140-200 mesh) will be placed over the INFILTRATORS and the system will be covered with a soil cap. The soil cap will consist of approximately 24" of sandy loam backfill. The soil cap will be mounded 5olo above the existing ground surface to promote surface run off away from the soil treatment area. The installer should confirm the feasibility of gravity discharge of sewage effluent from the foundation line to the soil treatment areaby field verification of assumed design parameters. Assumed design parameters with respect to gravity discharge include: r If the distance from the sewage pipe at exit from the foundation line to the entry of the soil treatment area is 50' or less, . The elevation ofthe ground surface at the entry of the soil treatment area shall be no more than 15" above the invert elevation of the sewage pipe at exit from the foundation line. If field measurements do not confirm these design assumptions, gravity discharge of septic effluent from the proposed structure cannot be assured and a lift station may be required. Please contact the design engineer and Mesa County to address any design modifications necessary if these design assumptions are not upheld. A 1,000 gallon, fwo compartment septic tank is required to provide a minimum of 48 hours retention time for sewage generated &om the proposed project. A non-corrodible Orenco filter (model# FTW0436-28) shall be iortun"a at the final outlet tee of the septic tank to limit the size of solids and sludge passing into -2- from the surface. As shown in the included graphics, the trench soil ffeatment system will consist of trrro (2) trenches 3' wide x 36" deep x 60' long with a total of thirty {30) INFILTRATOR (or equivalent) units. The soil treatment area will encompass an effective atea of 514.29 sq. ft- DESIGN CALCLILATIONS DESIGNLOADiNG RATE OF 2 BEDROOMS @ 150 GAL./BEDROOM-DAY:300 gal.lday DESIGN PERCOLATION RATE: 18 MIN./INCH DESTGN LONG TERM ACCEPTANCE RATE (LTAR) :0.60 GAL./SQ.FT.IDAY A: a . wHERE.LTAR' A: SOIL TREATMENT AREA (SQ. FT.) LTAR: LONG TERM ACCEPTANCE RATE (GAL./SQ. FT./DAY) A: of, = 500 SQ'FT' SOIL TREATMENT AREA ADruSTMENT FACTOR FOR GRAVITY TRENCH DESIGN : 1.0 SOIL TREATMENT AREA ADruSTMENT FACTOR FOR USE OF CHAMBERS :0.7 ADruSTED SOIL TREATMENT AREA: 500 X 1.0 X 0.7 : 350 SQ. FT. LENGTH OF 3' WIDE TRENCH REQ',D : 350 SQ.FT. / 3 FT. : 116.67 FT- USE 2 TRENCI{ES WITH 15 QI'ICK4 STANDARD INFILTRATORS (OT CqUiVAICNI) EACH, CONFIGURED IN SERIAL DISTRIBUTION FOR A TOTAL OF 30 LINITS. SOIL TREATMENT AREA SIZED AT 2 TRENCHES X 3FT WIDE X 60 FT LONG: 360 SQ. FT -3- Installation - Setbacks. Notifications. and Inspections The owner and installer shall be aware of and comply with the following installation and system operation requirements. The installer must be approved and licensed by Mesa County for installation of onsite rvastewater treatment systems. All installation activities shall be conducted in accordance rvith current Mesa Countv OIZLS Regzrlnlions. If at an:y time during construction. subsurface site conditions are encountered which differ &om the design parameters oreviously described. construction activities will stop. and the desisn eneineer and Mesa Counfv will be contacted to address anv necessarv desiqn modifications. The final cover shall not be placed on sewer lines, septic tank, or the soil treatment area until the system has been inspected and approved by the design engineer and Mesa County. The installer shall provide 48-hour notice for all required inspections. Installationprocedures including grade, location, setbacks, septic tank size, and soil treatment size shall conform with the attached graphic details. Construction activities and system components will not encroach upon existing easements or utility corridors' The installer must maintain all setbacks to utility lines, easements, property lines, or other adverse conditions, whether they are known and shown on the attached graphics or have been disclosed during construction. Vehicle traffic and parking is to be prevented over the soil treatment and repair area. Minimum setbacks for system components are: Septic Tank, Dosine Tank Building Server, Effluent Lines STA spring/welVcistern 50 50 100 potable rvater supplv line l0 5 25 structure w/ crawlspace 5 0 20 stmcRrre r,r'/o crawlspace 5 0 10 property lines, piped or lined irrigation l0 l0 l0 subsurface drain, intermittent irrisation 10 l0 25 lake, water course, irrieation ditch, strearn 50 50 50 cut slope steeper than 3H:iV l0 l0 25 septic tank 5 All gravity flow sewer lines and effluent distribution piping shall be 4 inches in diameter and have glued joints. All lines discharging sewage from the residence to the septic tank shall maintain a minimum fall of 118 in. per foot and shall employ sween 90's or 2-45's at all turas. Sewer lines from the dwelling to the septic tank and at least 6 ft from the septic tank outlet must meet minimum standard ASTM-3034. Lines discharging from the septic tank to the soil treatment area shall maintain a minimum fall of i/8 in. per foot. Sewer lines under driveways shall meet the minimum Schedule 40 PVC standards. Additionally, ef,fluent piping in traffic areas with less than 24" of cover shall be encased in 6" CMP or flow fill and covered with minimum 2" high density blue board insulation. a a a a a -4- Sewer lines or domestic water lines shall be encased in minimum SCHD 40 with water-tight end caps or aminimum of 6" of flow fill at all points with less than 5' separation between sewer and domestic water lines. Four-inch, two-way clean outs shall be installed at maximum 100'intervals in all gravity flow effluent lines exceeding 100'in length. A minirnum of 12" of soil cover (18" recommended) shall be maintained over all gravity draining OWTS components to prevent freezing of septic effluent (excepting septic tank access ports which must be extended to the ground surface). The system contractor shall be aware of the potential for construction activities to reduce soil permeabilities at the site through compaction, smearing, and shearing. The following precautions and construction procedures should be employed during installation to minimize disturbance to native soils: i. Excavation should proceed only when fhe moisfure content of the soil is below the plastic limil. If a sample of soil fomrs a rope instead of crumbling when rolled between the hands it is too wet and should be allowed to dry before excavation continues. ii. Excavation and backfill equipment should work from the surface where at all practical to avoid compaction of the soils at depth. iii. The bottom and sidewalls of the excavation should be left with a rough, open surface. The appearance should be that of broken or ripped soil as opposed to a sheared, smeared, or trorveled surface. Any smoothed or smeared surfaces should be removed with a toothed rake or shallow ripper, taking care to remove loose residues from the bottom of the excavation by hand if necessary. iv. Care should be taken in placing fill materials in the excavation to avoid damaging the exposed soil surfaces. o . The owner shall install a structural barrier if necessary and take precautions to prevent vehicular traffrc, excessive surface watering, accidental flooding, or other activities in the vicinity of the soil treatment area rvhich may corupact, satwate, or otherw'ise alter the subsurface soil parameters used in designing the septic system. r The owner will plant and maintain grass or other shallow rooted cover crop to prevent erosion and promote evapotranspiration over the soil treatment arca. r The owner will inspect and maintain the required mounding and drainage away from the soil treafinent area to prevent safuration from precipitation and surface flows. r To mitigate the generation of preferential flow channels which may compromise the operation of the system, the owner will inspect and prevent intnrsion of burrowing animals and deep- rooted plants into the soil treatment area. o The septic effluent filter shall be inspected and cleaned as necessary every six (6) months. r The owner will conduct periodic maintenance of the septic system by removing accumulated sludge &om the septic tank every 3-4 years to preyent clogging of the soil treatment area. a a a a -5- Limitations This report is a site-specifrc desiga for installation of an onsite wastervater treatment system and is appticable only for the client for whom our work was performed. Use of this report under other circumstances is not an appropriate application of this document. This report is a product of K-Cronk Engineering, Inc. and is to be taken in its entirety. Excerpts from this report may be taken out of context *J*oy not convey the true intent of the report. It is the owner's and owner's agent's responsibility to read this report and become familiar with the recommendations and design guidelines contained herein. The recommendations and design guidelines outlined in this report are based on: 1) the proposed site development and plot plan as fumished to K-Cronk Engineering, Inc. by the client, and2) the site conditions disclosed at the specific time of the site investigation of reference. K-Cronk Engineering, Inc. assumes no liability for the accuracy or completeness of information furnished by the client. Site conditions are subject to external environmental effects and may change over time. Use of this plan under different site conditions is inappropriate. If it becomes apparent that current site conditions vary from those anticipated, the design engineer and Mesa County should be contacted to develop any required design modifications. K-Crork Engineering, Inc. is not responsible and accepts no liability for any variation in assumed design parameters. K-Cronk Engineering, Inc. represents this report has been prepared within the limits prescribed by the owner and in accordance with the current accepted practice of professional engineering in the area. No warranty or representation, either expressed or implied, is included or intended in this report or in any of our contracts. SEAL E &*,rA Kachayla Cronk, P.E. t) Date NOTE: This OWTS design is meant to include the following five pages: 1) plot plan 2) septic layout Plan 3) notes for your installer 4) soil treatment area Plan view 5) soil treatment area cross section. The plan is not to be implemented in the absence of these sheets. In addition, results from the a: 6n4o U L!\$ o ,t a il LA soils evaluation are included for reference as -6- A. I 15' utlllty & drolnoge easer4ent / 6,agg dcre6 proposed A,D,U, slope // ( \- tr t) roPProx, [ocation ,/ of exlstlng EVTSI-l ) \ I \ \ 20' utltity & drqlnqge eoser'lent (k3-\lr- 20' utltlty & dnalhoge eoseitent dr 15' utltlty & drolnoge easenent \z -- exlstlng resldence -u$'" :ELEMAN PRDJECT LOl MONUMENT RIDGE REA! 2407-20e-26-0t0)LET PLAN \4AY 7, a0a4 SCALET 1'=100' I il N[RTH NETE GRAVITY I}ISCHARGE OF SEVAGE EFFLUENT FREM THE RESIDENCE TU THE DISPESAL SYSTEM IS SASED NN THE FILLEWING NES]6N ASSUMPTIENSI LENGTH !F SEVA6E PIPING FREM EXIT AT FEUNDATIT]N LINE T[ ENTRY TE SDiL TREATMENT AREA - 50' ER LESS ELEVATIDN EF GRDUND SURFACE AT ENTRY TE SIIL TREATMENT AREA = Nn MDRE THAN 15' ABIVE THE INVERT ELEV, [F SEVAGE PiPE AT EXIT FREM FIUNDATION LINE D]SCLAIMER IF THESE IESIGN ASSUMPT]INS ARE NET UPHELD DURING CENSTRUCTION, GRAVITY NTSCHARGE CAN NOT BE ASSURED AND A L]FT STATION MAY 5,288 qcres drlve I 6', -l- 10'JI mln, ' nln, ' -t--l olul ' i9' oQ sj ![D,is ,'' +i<;oY'il ilI *. n 0,L d -! o- 0,I fltter ([SI Modet FTW0436-e8) tneotnent oneo (STA) conslstlng of 2 rows of 15 Qulck4 Stondord Inflttnotors(or equlvotent) for a totolthlrty unlts conflguned ln serlal distrlbutlon os sholn cleon out stope tit:l_-i I I +rc0 E 0ru d 0, 0, o)d .g l.? & g +5 btu -{t .-{t' z* .-n-' ..4-" oost' NDTE CENTRACTER TE VERIFY SLIPEI SOIL TREATMENT AREA BRIENTATIEN TO 3E ADJUSTED PER SITE VARIATIENS TtT FACILITATE CENSISTENT TRENCH I}EPTH, RUNNING PARALLEL TO CNNTOURS, I NETE THE FILLEVING SETSACKS MUST BE MAINTAINEDI SEPIICTANK STA LAKE/STREAM/IRRIG. DITCH-50' INTERMITTENT IRRIG, DITCH-10/ 100' 50' c3 10' 100' a5' e0' t0' 10' SELID PIPE/LINED DITCH DD|,IESTIC VATER CISTERN - s0/ DEI"IESTIC VATER LINE STRUCTURE V,/CRAVLSPACE - 5' STRUCTURE V/ECRAVLSPACE-5' 10' 10' CATED PIPE SPRINGS/VELLS PRIPERTY LINE NETE NETE IF SITE CENDITIENS LIMIT PRACTICAL INSTALLATIEN EF STA AS SHEVN, INSTALLER MAY CENTACT ENGINEER TE MEI'IFY TRENCH LAYOUT PRIER TE INSTALLATIEN, NETE AN I]ESERVATIEN HELE VITHIN 50' IIF THE PREPESED STA MUST BE PREVIDEI} BY THE CLIENT TE THE DESIGN ENGINEER FER INSPECTTEN PRIER TE INSTALLATIEN. SHEULI} SEILS DIFFER SIGNIFICANTLY FREM DESIGN ASSUMPTIENS, A REVISED DESIGN MAY 8E REOUIRED. i!LEMAN PRDJECT IO1 MENUMENT RIDGE ROAD ?407-?0?-?6-010 SEPTIC LAYIUT PLAN vtA\ 7, ?0?4 SCALET 1'=30'NORTH T(-CROAIT(P.0. .Box 4o ,14ac/r. C0 Sr t) Z CI. p i CI. o i 7 2 f ktr chay I a. n' an Ie O,t o rr tlont..ot n NOTES FOR YOUR INSTALLER o Please veriti slope at the time of system installation - the orientation of the STA shown in this design has been determined based on existing site conditions at the time of the original site investigation, but that may have changed during construction and pre-construction gfading of the site. o The depth of the ffenches is determined by percolation rates and soil conditions relative to the existing ground surface at the time of the soils investigation. If the site slope or grading of the ground surface at the time of installation differs significantly from what was initially observed, the trench depths may have to be adjusted to make sure the infiltrative surface remains in the desired soil layer, and portions of the trenches don't end up too deep or too shallo'67. The depth of the soil cap relative to finished grading is not part of the OWTS cr{teria. r Please provide K-Cronk Engineering with a copy of the septic tank manufacfurer's specification sheet verifying maximum backfill depth. Tanks must be backfilled according to manufacturer's specification. Pressurized Systern Notes o Please provide K-C.ronk Engineeri.ng a copy of the sand sieve analysis, if relevant,dated within 30 DAYS of installation before purchasinglinstalling the sand so we can check that it meets Mesa County OWTS standards. r Pump floats do not come pre-set from the factory. Please refer to the Pump Vault Detail for the distance needed between the on/off floats. Please reach out at any time during the installation process if you have any questions! Kachayla Cronk - (970) 250-0572 trvo (?) rows of flfteen (15) OUICK4 STANDARD INFILTRATIRS (or equlvotent) For o totot of thlrty (30) unlts conflgured ln serlot dlstrlbutlon os shown, typ, 65' w/ endcops, o€ chonbers, typ 'tYP' lc lnftuent aooc 0, Eeo U 0,! ;r provlde lnspectlon,/vent ponts ot eoch end cap, fosten odjacent Inflttrators w/ <3) 3/4' scnews ot approxlnatety 10 o'clock, 12 o'ctock, ond 2 o'ctock posltlon, tvp, SI]IL TREATMENT AREA - PLAN VIEV SCALET 1'=20' SCREV DETAIL NTS 4' SCHD 40 PVC VENT/INSPECTIEN PERT AT EACH ENI) CAP, TYP.SIIL CAP SERIAL DISTR]BUTIEN EUTLET - USE HIGH KNICK EUT, TYP, (END [R SIDE) SERIAL DISTRIBUTION CONNECTION DETAIL SCALE: 1/2"--1' SERIAL }ISTRISUTIDN EUTLET - USE HIGH KNOCK EUT, TYP, (END IlR SIDE) (10' r conf lgunotlon, cttenno serlat dlstributlon end-to-end, typ, SCREVS, TYP (SEE DETAIL) :ELEMAN PRIJECT IOl MDNUMENT RIDGE ROAI) a407-e0a-e6-010 SDIL TREATMENT AREA - PLAN VIEV vAY 7, e0e4 SCALET 1'=?0' serlat dlstnibutlon connectlon designed to assune saturotlonof upgradlent tnench before efftuent ls ottowed to overflowto odjacent downgrodlent trench CINNECTIENS MUST 3E I'IANE FRDMexlstlng gnound THE HI6H KNECK-DUTS BF EACHsurfoce wlth stope END CApS synthetlc fltter fabrlc, typ, lnspectlon./v"ntlng port ot eqch end cop soit cop, provlde r,rln, 52 drolncge nqx, 3Hr1V(332 stope) \o ru o+oc 0,0nNtlTEl IF CINSISTENT TRENCH NEPTH CANNIT BE MAINTA]NEN, INFILTRATIR CHAMBERS MAY 3E INSTALLED LEVEL AT A4' MIN. AND 48' MAX BGS 4' nln, (10' neconnended) typicot Infittrotor trench cnoEs sPctlon (one of tuo) dlsk or scot'lfy unden eqch Inflttroton trench QUICK4 STANDARn INFILTRATIR (or equlvqlent) Insto[ In occordonca wlth 'INFILIRATBR TECHNICAL HANUAL', ovdltalolefron Inflltrotor Systens Inc,, 1e3 Eth Street, Sulte 12, Etd Soybrook, Cannectlcut 06475 SEIL TREATMENT AREA (STA) - CRI]SS SECTiEN (TYP. TVE T]F TVt]) SCALET 1'=5' SIILS LIG BY ETHERS - SEE APPENDIX A CILEMAN PROJECT IOI MDNUMENT RiN6E READ a407-a02-e6-010 SEIL TREATMENT AREA - CRDSS SECTIEN MAY 7, 2824 SCALET 1'=5' ELEVATIDN I}ESIGN SPECIFICATIENS FRIM FIUNDATIIN LINE TE INLET !F SEPTIC TANK = 10, FREM EUTLET EF SEPTIC TANK T! STA = 10' ATIIN [F GRIUND SURFACE AT ENTRY T[ STA = 100,00' B0TTOM 0F INFILTRATIR AT ENTRY TE STA = 97,00' TIEN trF SEVAGE LINE AT ENTRY TE STA = 97,50, ATI0N UF SEVAGE LINE AT DUTLET [F SEPTIC TANK = 97,70'[F SEVAGE L]NE AT INLET EF SEPTIC TANK = 97,95' ATInN UF SEVAGE LINE AT F0UNDATIEN LINE = 98,15' ASSUMEI) DESIGN DESI6N ELEVATIIN INVERT ELE INVERT ELE INVERT INVERT Appendix A Soils and Percolation Report &u,* flolu*** .j ., ti:.i-j ..:,:i':i,'. ':t..\ November tr3, Tapestry Attn: Jerre P. O. Box Parachutq Subject: Sear Jerre: As requested" perc,olation;test was condu$ed in Tapestry based on the in this report. Fropesed looated snthe over crawlspace. loadi'S fsl,tbis prsposed type narfbwest ofthe lfbuilding described abovg this report. : Sit* Caladi€i*ns terrain "li the Fia'. 'ri ir,e .t !r;\\'-t.?;r '_l *:--:--.,:--.--.-- 81635 Job No. 109 3Bl Design and Percslation Tesl ?mposed 10, Monume,nt Ridge, Monument Ridge Road, Inc. performed a sirbsoil study and disposal designs at the subject site. ?he studyi wiil be a singie story wood frame structure Smund flsors will b€ sfnrciurally t<r rang€ betu/een about I to 5 &et. aszurned to be relatively light and qypical dispcsal system is proposed tc be located slightly furtlrer west than that ehown on are significantiy different fiam those re-evatuate the reeastrmendations presented i4 '1 i 1 .:1 ground $rrface aFpears $iostiy natural- The lr.,itl'l a strcng slope dor,r'n to the rvest. buiiding is abaui 4 ic 5 feei. trrogetation Tin'e ls a s":.:lic-",' :i::h aiong tire sauti: s!i.' lA S*rdy Cc oEf ?'7 accordance as shown Cut de,pths dated sf Figure The shot]ld The lat is e gcr*ss ;.f---"i-.* --' 01' &TCA ls ;'iL: { in -2- conditions at t}e site were evaluated by araa and one profile pit in tha septio shown cn Figure l- The logs ofthe pits are /r foot oftopsoil, consisted ofmdiumdensq clayey to silty gravel aud eobbles underlain at deptltswith from 5 feet by ta derrsq clayey sandy gavel and cobbles small maximunr depth explcred af 9r/t feet' testmg relaitively usdisfu*ed samples oftbe sand presented'on 3,ulrder exist*rg moistse disposal presentedlcn I : The subsoils sarnpies coiiapse 2. amlnor rn'hen of and liglit anil when loaded after wetifurg. and the othc sarxPle showed One oftle: arrunof gradation and sa:rd soiis the pits at,the test of 4. The E"oundatign clayey soils will these be rlsk of be taken poteatial rn one neglected &rsrdation sonditione inthe constructi6n.iower risk bear the er*irelY on F'ound*tloP soiis designed the propesed there could be expected ts be settlemant I Footings in Table I. No &ee water was obsprved ia ssils were slightlY moist- assumed excavation grades, the clayey to very exposed at subgrade- $pread footings bearing srlFport of the building with some risk ifthe bearing soils become wetted wetting ofthe bearing soits. The low 1% inch 18 inches fcr continirous soils encauntered at the j : walls and 2 fect fori foundation bearing,level low 8re and fer 15 the ta 1 inch bea all The aad soils. Gee calurnns. All within The for grade is used il3 atea. reinforced tap bottorn some lateral site soil topsoii anom*iies and be*ter withstand the affect* af assuming ac msupported lengtk of at least 12 -J- fouadation wa1!s shotld be weil strucftIres shouid also bc designed to resist 'l of at least 50 Pcf for the to the nng rior as rrails as based a$fluid unit weight racks" as beckfiiL o&- it develop grormd dwing grade such as protected and The con$ist the invert be placed level of grade ata material used the sieve, less drain gravel should of hezuy prrecipitation or seasonal ru$off also a perched condition. We recoslrrrend a:rd relarively deep atewlspace areas, be pressure buildup by an underdrain systetn placed in the battcmof the wall backfitrl fre+drsixling granular material' The drain at least I footbelow lowest adjacant finish a suitable granity oatlet' Fre+draining sirould contain less than2%passiag theNo' sier.e andhave a maxintum size of 2 inches' lt4&et deep. the foundation iri atl directiciis' We €Jnderdraisr bas been our grormdwatcr Sarfaee preverit sbserved cornpleted: rl1 area r) 2\ 5) of the ided ground to soile. nway r% atd tn Na. at illlltllr!l utnail.IJob No. 1 slope of 12 inches in the first l0 feet in bees and e 5 feet the feasibitity an rrere dug 12 inch by tZ and were holes are clayey to study 0n do The abautTtA I USDA ssll {LTAR} df based cn Sate .: Colorado !.,i*ritatigPs: - l: tgeotecnnrcar warrat*y inthis based locatiots the atea. , ofmold biolcgical ts findines may net evident once so -4- of 3 isches in the first 10 feet in pavement inay be neded uphill to dir€ct surfrce nuro tr slrauld discharge well beyond the limits o 4 regultr heavy inigation shouldbe located at w€f,e condtrcted oa November 3, 2009 to system at the site. One profile pit and three shovm on Figure 1- The te$ boles trand dug at the batiom of shallcw backhoe and the percolation test results, the *sted ut acccrdance with generally accepted practices 1n this &ea at this tima w makee The cooclusions and recommendations *omthe exploratory pits excavated type of construction and our 1n the presence, Prevention or {MOEC} developing inthe futura lfthe inthis special field ofPractice ba and extrapolation of the subsurface described in this report' we should be at the rnd lall 5). i : l FeraoEafion withwatsr to testing. The soils exposed in the to thasp Frofile Pit shorun on Figure 2 and consist of silty gravel and cobbles" test rEsults in Table 2 and indicate percolation rates p€r an av€rags of 11 minutes per inch' According is Sandy Lsarn The long tern acceptaace Loam is to be about 0.72 gailons per squale fcot per Sased on'ths area shoeld be for infiltraiion septic disposal systert A professional destgn systern at the pib and variations m the subsur&ce 15 performed.If canditions encorrntered JobNo. 109 af may bemade. I u.g. .150 .3 dFTEft OF st 9L 100 s0 80 m 6096(Adq- 50F 2 KJ{,,g. Ll 48& g0 20 l$ 0 FROhd: Profile Pii from 3 Feet tc 4 Feet 75.2 152ln co€a.B s.s 19.0 s7.5 1A.S CLAY 7 7o PLAS?ICITY INDEX % 4"?5 AHTiCi.ES IN }.}ILUMEIEFS i ^SS$ 1-18 srlt 17 %GHAVEL 2a, % ii :i!l :: UGUID UMf USDASOILTYP€: Sandy 7HRl5Mtlt .037 .074.0s1 .00s .006 cnY SAND V" Loam 24 o.45 10 4V 30 7A 80 g0 t3tuJ 40A F !J Fs0 Zt$() 0:td0- 60 rbcft A?FigureUSDA GRADATION TFST RE$ULTS1CIg 3814 --cs HEFLniAFIi-t'ItAlgl I 'l F{$prry0RYH*pA$rrAK SsST€eHNtffi6 3gg. TAR!"[ I $IJffifrfrANY SF TABONATORY Tg$T RHSUTT$ Job l{cu IOP SqA Vsry 9laysy silty saud with rvrnqrral Clnyey sihy sard Very claycy silty $ancl Sandy L,oam s0ltsn BEOftOCKTYPE lps,Fl uileoilflNrD coffipn$gnr6 SIBENgnr pm$K tilDex fid ATTEABERGU'{Iffs uoulbiliilr tv,l 24 pEncElff pt$stN0 ilato0 / grEffi 52 g/d $ANS M 06t GftAVFt 10s 85 $2 (edl lgjqt tJtU'&L T}RY brN5fff 5.8 7.2 71 t%t tltl|ttvfi'4L MSt$[t FE CONIENT 4 34 nspth {frl 4 112 A I 2 Prctil SAIJI plf SARN LOT 1CI 2 PIT T PROPSSES RSSIDENCE I I ; CH b.{ARK: GROU}IS AT CORNER;ELFd. : -l0o.o', AsgliM LfGfND: x pRoFlLE FIT A Pgncor-arsru HOLE ?t 11 APPROXIMATE PENCOLATION TEST HOLES109 3B1A GE#TECHI*ICAI., iNfr" TAB&-E 2 TEST RE$ULTS .tsB ,tsg 38tA 20s9. {ss9, Note: GN tne AVERAGE pERC6LA?loht .; RATE tnf$dJ!!sGll, sRoP ll* WATER LffiEL {r}rsHEs} WATER DEPYH&T $?ARTOF lgdTERltAr- {rNGFfss} UTTA;rER DEPTfi AT HFiIg OF i$TERVAL {8NC}rEs} E,,H :alt E E${ II{TE {R i$t oF IVAI- N9 F{OLE ffiS.i !{Sl : DEF {rF*c} I 8/ze8Y473s/a 9Yz$s/a7&% 2*/a &rfa 3Y1 lYz4s/' &Yag%43Yq ,rf,*/e { L7 ; I i 1 'i g?z '1.123Y" x ref t led 5 4qp-.E ?Yz18Ja4&Ta 7Y+?1&%: a*/"V1f4 lYz:t-taAY4 2r/*\tr/a ts *.t$? I a Vlz,3 1 refi t led i ce i . p-2 2T*'!3Fle 71'12 l?a96/oj'tYz. '!:&&Ye*/a tYz#a &Y+ lYi#fz6Ya *t'/2 4|lz tl4&e/"#/e .:\ 1 I .! n €7A3%8/a P-3 48 6nt nber nge hoies 2,380S. 316 hAr 'rsslatra&s 1 da*g in Sre hotforvr of backfuoe pi€a and tes* weile ssnducted sct F{ovEnnber based en t&e €asttryo readE$gs oF