HomeMy WebLinkAboutConditions of Permitco NDITIONS OF PERMIT
BLRE-09-24-8892
BEN & THERESA WAGENMAN
1,723 SO FT Secondary Dwelling Unit (SDU) over an
2,904 SO FT Conditioned Garage
TBD CR 214, New Castle
Maves Sub Exemption, Lot2 - 218106200283
1) ALL WORK SHALL COMPLY WITH THE 2015 INTERNATIONAL RESIDENTIAL CODE (I.R.C.)AND 2018
I NTERNATIONAL ENERGY CONSERVATION CODE (I.E.C.C.)
2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE
ATTACHED "GARFIELD COUNTY BUILDING REOUIREMENTS". NUMBER REFERENCES NOTED ON
PLANS REFER TO SPECIFIC ITEMS ON THIS LIST.
3) ELECTRTCAL pERMtTTtNG AND tNSpECT|ONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL
ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS
REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.
4) ALL EXTERIOR LIGHTING TO BE DOWNCAST AND SHIELDED.
5) WILDFIRE MITIGATION RECOMMENDATIONS: SHALL COMPLY WITH WILDFIRE MITIGATION AND
DEFENSIBLE SPACE RECOMMENDATIONS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE
DISTRICT. PLEASE REFER TO THE GARFIELD COUNry COMMUNIry DEVELOPMENT WEBSITE FOR
ADDITIONAL I N FORMATION.
6) OPEN HOLE SOTLS REPORT tS REOUTRED AT FOOTING INSPECTION AND PRIOR TO ANY CONCRETE
POUR. PROVIDE COPY OF GEOTECHNICAL ENGINEERS REPORT TO THE BUILDING INSPECTOR.
2,000 PSF soil bearing.
7) SEPTIC SYSTEM REVIEW / APPROVALS: PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF
OCCUPANCY PROVIDE FINAL APPROV /SIGN-OFF FROM GARFIELD COUNry'S PUBLIC HEALTH DEPT.
8) AN ELEVATION SURVEY, SEALED BY A COLORADO PROFESSIONAL LICENSED SURVEYOR, IS
REOUIRED AT FRAME INSPECTION TO VERIFY THAT AS-BUILT ROOFS COMPLY WITH GARFIELD
COUNTY'S 25-FT BUILDING HEIGHT LIMIT AS DEFINED IN THE LAND USE DEVELOPMENT CODE.
9) SECONDARY DWELLTNG UNtT (SDU) rS GRANTED LAND USE APPROVAL THROUGH GAPA-1 -24-8994.
OWNER BUILDER MUST ADHERE TO ALL CONDITIONS OF PERMIT STAPLED TO THIS FIELD COPY,
INCLUDING DIRECTOR'S DECISION LETTER DATED JUNE 24, 2024,XCEL ENERGY WILL SERVE LETTER
DATED JULY 1 0,2024; AND KUMAR & ASSOCIATES ROCKFALL HAZARD REVIEW LETTER DATED
AUGUST 27 ,2024,
1O) SUBJECT PROPERry OFF OF SLAUGHTER GULCH RD SHALL RECEIVE FINAL APPROVAL OF THE
DRIVEWAY ACCESS BY THE FIRE MARSHAL PRIOR TO SCHEDULED GARFIELD COUNry BUILDING
FINAL i C.O. FINAL INSPECTIONS. SEE ORRIN MOON LETTER DATED OCTOBER 1 ,2024.
1 1 ) BLOWER DOOR TEST tS REOU|RED. MUST SUBMTT BLOWER DOOR TEST REPORT TO GARFIELD
COUNTY COMMUNITY DEVELOPMENT DEPT. OFFICE PRIOR TO SCHEDULING FINAL BUILDING
INSPECTION / C.O. FINAL.
12) PRESCR|pTtVE PATH W|TH 2018 tECC TABLE R402.1.2 lS CHOSEN FOR ENERGY COMPLIANCE OF THE
HOME. ALL NEW HOMES TO HAVE WHOLE.HOUSE MECHANICALVENTILATION SYSTEM INSTALLED
(2015 IRC TABLE m1507.3.3(1)AND (2)AS STAMPED ON SHEET A-101)