HomeMy WebLinkAboutP.E.R.C. OWTS- Revision 09.17.24
Notice Of Revision to OWTS
September 17, 2024
P.E.R.C. Project
4685 CR 346
Silt, CO 81652
Parcel No. 2179-181-00-123
On September 12, 2024, K-Cronk Engineering, Inc. met with the owner of the property mentioned
above to discuss the onsite wastewater treatment system (OWTS) design prepared by this office
on July 22, 2024.
During the site visit referenced above, it was determined that installing the Soil Treatment Area
(STA) directly west of the existing STA would not be desirable due to the client’s desire to irrigate
in that area. The client proposed installing the STA to the west of the existing residence in order
to maximize the amount of field area that can be kept for irrigation. The design engineer approves
this change, which has been shown in the attached graphic.
The change described above will not affect the functionality of the OWTS, and all required
setbacks will continue to be met. The final layout of the system will be fully documented by K-
Cronk Engineering in the Asbuilt drawing and Certificate of Inspection.
Seal
Kachayla R. Cronk, P.E.
P.O, Box 140
Mack, CO 81525
970-250-0572
Enc:
Septic Layout Plan dated 09/17/24