Loading...
HomeMy WebLinkAboutP.E.R.C. OWTS- Revision 09.17.24 Notice Of Revision to OWTS September 17, 2024 P.E.R.C. Project 4685 CR 346 Silt, CO 81652 Parcel No. 2179-181-00-123 On September 12, 2024, K-Cronk Engineering, Inc. met with the owner of the property mentioned above to discuss the onsite wastewater treatment system (OWTS) design prepared by this office on July 22, 2024. During the site visit referenced above, it was determined that installing the Soil Treatment Area (STA) directly west of the existing STA would not be desirable due to the client’s desire to irrigate in that area. The client proposed installing the STA to the west of the existing residence in order to maximize the amount of field area that can be kept for irrigation. The design engineer approves this change, which has been shown in the attached graphic. The change described above will not affect the functionality of the OWTS, and all required setbacks will continue to be met. The final layout of the system will be fully documented by K- Cronk Engineering in the Asbuilt drawing and Certificate of Inspection. Seal Kachayla R. Cronk, P.E. P.O, Box 140 Mack, CO 81525 970-250-0572 Enc: Septic Layout Plan dated 09/17/24