Loading...
HomeMy WebLinkAboutConditons of PermitCONDITION o F PER MIT BLMF-O9-24-8899 EVAN & TAYLOR WAGSTROM MANUFACTURED HOME ON ENGINEERING FOUNDATION WITH FULLY UNFINISHED BASEMENT TBD Ram Ln, Silt - Piffer Sub Exemption, Lot2 -212532200197 MANUFACTURED HOUSES ARE REGULATED & INSPECTED BY COTORADO DEPT. OF HOUSING (C.D.O.H.) AND AIL FACTORY.BUILT RESIDENTIAL STRUCTURES INSTALTED IN GARFIELD COUNTY MUST MEET C.D.O.H. GUIDELINES FOR MANUFACTURE AND INSTALLATION ATTHE JOB SITE. (2018 |ECC'BLOWER DOOR TESTtNG', ON PREMISES AFTER INSTALLATION SHALL NOT APPLY FOR MANUFACTURED HOME TYPE . AS CURRENT ENERGY COMPLIANCE FOR STATE OF COLORADO IS TO BE VERIFIED AT THE FACTORY) 1 ) FOUNDATTON CRAWL SPACE & EXTERTOR DOOR LANDTNG / STAIRS SHALL COMPLY WITH 201 5 l.R.C., 201 8 I.E.C.C. AND MANUFACTURER'S INSTALLATION REOUIREMENTS. 2) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNry'S BUILDING REOUIREMENTS AND MANUFACTURER'S I NSTALLATION REOUI REM ENTS. 3) WILDFIRE MITIGATION RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE RECOMMENDATIONS COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COMMUNITY DEVELOPMENT WEBSITE FOR ADDITIONAL I NFORMATION. 4) ALL PLUMBING AND GAS PIPING CONNECTIONS MUST BE PERFORMED BYA COLORADO LICENSED PLUMBER, AND ALL ELECTRICAL CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED ELECTRICIAN. 5) ELECTRTCAL PERMtTTtNG AND TNSPECTTONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH-IN APPROVAL, IF ANY, WORK PROPOSED IN ATTIC LOFT. ELECTRICAL FINAL APPROVAL REOUIRED FOR FINAL INSPECTION & CERT. OF OCCUPANCY. 6) pROpERry OWNER EMATL (10/16/2024) tNDTCATES UNFTNTSHED BASEMENT AT TIME OF BUILDING FINAL / C.O. FINAL INSPECTION. FINISH BASEMENT(S) SHALL REOUIRE SEPARATE NEW BUILDING PERMIT APPLICATION & PLAN REVIEW TO COMPLY WITH BUILDING CODES & LAND USE REGULATIONS IN EFFECT AT TIME OF FUTURE WORK. 7) PROPANE FUEL: SEE PROPANE GUIDE ATTACHED. 8) CDOH DEFERRED INSPECTION PROCESS APPLIES: CDOH THIRD PARry FORMS ATTACHED FOR JOB SUPERINTENDENT OR CONTRACTOR TO FULLY ADMINISTER. 9) pRtoR TO FTNAL BUTLDtNG TNSpECTTON & CERTTFTCATE OF OCCUPANCY, PROVIDE BUILDING INSPECTOR WITH FINAL APPROVAL / SIGN.OFF FROM GARFIELD COUNTY'S PUBLIC HEALTH DEPARTMENT FOR INSTALLATION OF THE ON.SITE WASTEWATER TREATMENT SYSTEM. 1O) GARFIELD COUNry BUILDING DEPT. INSPECTIONS TO INCLUDE THE FOLLOWING: A. FOOTINGS DESIGNED AT 2,OOO PSF, VERIFY 36 INCH MINIMUM FROST DEPTH & UFERGROUND INSTALLED. OPEN HOLE SOILS REPORT REOUIRED AT FIRST FOOTING INSPECTION. REMINDER TO OWNER: HAVE DEFERRED STRUCTURAL ENGINEER STAMPED DETAIL (PREPARED BY DB STRUCTURAL) READY FOR WALK- OUT BASEMENT'FROST DEPTH' AT FOOTING INSPECTION. B. FOUNDATION C. SEPTIC SYSTEM CONNECTION D. PLUMBING/GAS E. SITE FRAMING, STAIRS, HANDRAILS PER STRUCTURAL ENGINEERS PLANS AND FIELD COPY. _ __,._ F_. __ F r N A L r N S P E_eJ_l qN 3!.EBI] ElcdE_o r Q Q c V IAN _cy1_ "NOTE: GARFIELD COUNTY REOUIRES C.D.O.H. INSTALLATION INSIGNIA TO BE AFFIXED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY .tl tL F a- -( a-o-t