HomeMy WebLinkAboutConditons of PermitCONDITION o F PER MIT
BLMF-O9-24-8899
EVAN & TAYLOR WAGSTROM
MANUFACTURED HOME ON ENGINEERING FOUNDATION WITH FULLY UNFINISHED BASEMENT
TBD Ram Ln, Silt - Piffer Sub Exemption, Lot2 -212532200197
MANUFACTURED HOUSES ARE REGULATED & INSPECTED BY COTORADO DEPT. OF HOUSING (C.D.O.H.)
AND AIL FACTORY.BUILT RESIDENTIAL STRUCTURES INSTALTED IN GARFIELD COUNTY MUST MEET
C.D.O.H. GUIDELINES FOR MANUFACTURE AND INSTALLATION ATTHE JOB SITE.
(2018 |ECC'BLOWER DOOR TESTtNG', ON PREMISES AFTER INSTALLATION SHALL NOT APPLY FOR
MANUFACTURED HOME TYPE .
AS CURRENT ENERGY COMPLIANCE FOR STATE OF COLORADO IS TO BE VERIFIED AT THE FACTORY)
1 ) FOUNDATTON CRAWL SPACE & EXTERTOR DOOR LANDTNG / STAIRS SHALL COMPLY WITH 201 5 l.R.C.,
201 8 I.E.C.C. AND MANUFACTURER'S INSTALLATION REOUIREMENTS.
2) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNry'S BUILDING REOUIREMENTS AND
MANUFACTURER'S I NSTALLATION REOUI REM ENTS.
3) WILDFIRE MITIGATION RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE MITIGATION AND
DEFENSIBLE SPACE RECOMMENDATIONS COLORADO STATE FOREST SERVICE AND LOCAL FIRE
DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COMMUNITY DEVELOPMENT WEBSITE FOR
ADDITIONAL I NFORMATION.
4) ALL PLUMBING AND GAS PIPING CONNECTIONS MUST BE PERFORMED BYA COLORADO LICENSED
PLUMBER, AND ALL ELECTRICAL CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED
ELECTRICIAN.
5) ELECTRTCAL PERMtTTtNG AND TNSPECTTONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL
ROUGH-IN APPROVAL, IF ANY, WORK PROPOSED IN ATTIC LOFT. ELECTRICAL FINAL APPROVAL
REOUIRED FOR FINAL INSPECTION & CERT. OF OCCUPANCY.
6) pROpERry OWNER EMATL (10/16/2024) tNDTCATES UNFTNTSHED BASEMENT AT TIME OF BUILDING
FINAL / C.O. FINAL INSPECTION. FINISH BASEMENT(S) SHALL REOUIRE SEPARATE NEW BUILDING
PERMIT APPLICATION & PLAN REVIEW TO COMPLY WITH BUILDING CODES & LAND USE
REGULATIONS IN EFFECT AT TIME OF FUTURE WORK.
7) PROPANE FUEL: SEE PROPANE GUIDE ATTACHED.
8) CDOH DEFERRED INSPECTION PROCESS APPLIES: CDOH THIRD PARry FORMS ATTACHED FOR JOB
SUPERINTENDENT OR CONTRACTOR TO FULLY ADMINISTER.
9) pRtoR TO FTNAL BUTLDtNG TNSpECTTON & CERTTFTCATE OF OCCUPANCY, PROVIDE BUILDING
INSPECTOR WITH FINAL APPROVAL / SIGN.OFF FROM GARFIELD COUNTY'S PUBLIC HEALTH
DEPARTMENT FOR INSTALLATION OF THE ON.SITE WASTEWATER TREATMENT SYSTEM.
1O) GARFIELD COUNry BUILDING DEPT. INSPECTIONS TO INCLUDE THE FOLLOWING:
A. FOOTINGS DESIGNED AT 2,OOO PSF, VERIFY 36 INCH MINIMUM FROST DEPTH & UFERGROUND INSTALLED.
OPEN HOLE SOILS REPORT REOUIRED AT FIRST FOOTING INSPECTION. REMINDER TO OWNER: HAVE
DEFERRED STRUCTURAL ENGINEER STAMPED DETAIL (PREPARED BY DB STRUCTURAL) READY FOR WALK-
OUT BASEMENT'FROST DEPTH' AT FOOTING INSPECTION.
B. FOUNDATION
C. SEPTIC SYSTEM CONNECTION
D. PLUMBING/GAS
E. SITE FRAMING, STAIRS, HANDRAILS PER STRUCTURAL ENGINEERS PLANS AND FIELD COPY.
_ __,._ F_. __ F r N A L r N S P E_eJ_l qN 3!.EBI] ElcdE_o r Q Q c V IAN _cy1_
"NOTE: GARFIELD COUNTY REOUIRES C.D.O.H. INSTALLATION INSIGNIA TO BE AFFIXED PRIOR TO FINAL
BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY