Loading...
HomeMy WebLinkAboutConditions of PermitCONDITION o FPE RMIT BLMF-O9-24-8904 EDWARD & SALLY BAKER MANUFACTURED HOME ON ENGINEERED FOUNDATION CRAWL SPACE (WITH MANUFACTURER'S UNFINISHED / UNCONDITIONED ATTIC ABOVE) 7441 CR 301, Parachute - 240506400088 MANUFACTURED HOUSESARE REGUIATED & INSPECTED BYCOLORADO DEPT. OF HOUSING (C.D.O.H.)ANDAtt FACTORY-BUILT RESIDENTIAL STRUCTURES INSTALLED IN GARFIELD COUNTY MUST MEET C.D.O.H. GUIDELINES FOR MANUFACTURE AND INSTALIATION AT THE JOB sITE. (2O18 IECC 'BLOWER DOOR TESTING' ON PREMISES AFTER INSTALLATION SHALL NOT APPLY FOR MANUFACTURED HOME TYPE - AS CURRENT ENERGY COMPTIANCE FOR STATE OF COLORADO IS TO BE VERIFIED ATTHE FACTORY) 1) FOUNDATTON CRAWL SPACE & EXTERTOR DOOR LANDTNG / STAIRS SHALL COMPLYWITH 201s l.R.C., 201 8 I.E.C.C. AND MANUFACTURER'S INSTALLATION REOUIREMENTS. 2) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNry'S BUILDING REOUIREMENTS AND MANUFACTURER'S I NSTALLATION REOUI REM ENTS. 3) WILDFIRE MITIGATION RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE RECOMMENDATIONS COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COMMUNITY DEVELOPMENT WEBSITE FOR ADDITIONAL I N FORMATION. 4) ALL PLUMBING AND GAS PIPING CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED PLUMBER, AND ALL ELECTRICAL CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED ELECTRICIAN. 5) ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRIC BOARD, ELECTRICAL ROUGH-IN APPROVAL, IF ANY, WORK PROPOSED IN ATTIC LOFT. ELECTRICAL FINAL APPROVAL REOUIRED FOR FINAL INSPECTION & CERT. OF OCCUPANCY. 6) PROPANE FUEL: SEE PROPANE GUIDE ATTACHED. 7) pRtoR TO FTNAL BUtLDtNG INSPECTTON & CERTTFTCATE OF OCCUPANCY, PROVIDE BUILDING INSPECTOR WITH FINAL APPROVAL / SIGN-OFF FROM GARFIELD COUNry'S PUBLIC HEALTH DEPARTMENT FOR INSTALLATION OF THE ON-SITE WASTEWATER TREATMENT SYSTEM. 8) pROpERTy OWNER CORRESPONDENCE STAMPED OCTOBER 17,2024 CONFIRMS FACTORY BUILT UNFINISHED ATTIC WILL REMAIN UNFINISHED, UNCONDITIONED AT C.O. FINAL INSPECTION. OWNER IS ADVISED, SEPARATE BUILDING PERMIT APPLICATION TO FINISH HABITABLE ATTIC LIVING IS REOUIRED IN ACCORDANCE WITH BUILDING CODES & LAND USE REGULATIONS IN EFFECT AT TtME OF FUTURE WORK. (HABITABLE LtVtNG rN THE ATT|C AREA lS NOT INCLUDED UNDER THE CURRENT PERMITTED SCOPE.) 9) HISTORICDRIVEWAYPERMITGRB-21-D-1 FORTHEPRIORPOLEBARNGARAGE(CIRCA2O21) PROVIDED FOR FILE RECORDS. 1 0) GARFTELD COUNry BUILDING DEPT. INSPECTIONS TO INCLUDE THE FOLLOWING: A. FOOTINGS DESIGNED AT 2,OOO PSF, VERIFY 36 INCH MINIMUM FROST DEPTH & UFERGROUND INSTALLED. OPEN HOLE SOILS REPORT REOUIRED AT FIRST FOOTING INSPECTION B. FOUNDATION C. SEPTIC SYSTEM CONNECTION D. PLUMBING/GAS E. SITE FRAMING, STAIRS, HANDRAILS PER STRUCTURAL ENGINEERS PLANS AND FIELD COPY. .."aIt c\ $' N F FINAL INSPECTION & CERTIFICATE OF OCCUPANCY* *NOTE: GARFIELD COUNTY REOUIRES C.D.O.H. INSTALLATION INSIGNIA TO BE AFFIXED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY