Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT B LRE-09 -24-8913 JENNIFER ZWELLING / CHRIS LEHRMAN ADDITION to Residential Dwelling Unit 2 (built circa 1977) ADDITION INCLUDES: 700 sq ft Private Use Garage with 488 sq ft'unfinished, unconditioned future use'space & 1 54 sq ft covered porch / deck above 161 Van Dorn Rd Cheylyn Acres, Tract 7 - 218334300003 1) ALL WORK SHALL COMply W|TH THE 2015 TNTERNATTONAL RESIDENTIAL CODE (l.R.C.) AND 201B INTERNATIONAL ENERGY CONSERVATION CODE (I.E.C.C.) 2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACH ED "GARFI ELD COU NTY BUI LDING REOUI REM ENTS". NUM BER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) ELECTRTCAL pERMtTTtNG AND TNSPECTTONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REQUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. 4) ALL EXTERIOR LIGHTING TO BE DOWNCAST AND SHIELDED. 5) WILDFIRE MITIGATION RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE REOUIREMENTS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT. PLEASE SEE GARFIELD COUNry COMMUNITY DEVELOPMENT WEBSITE FOR FURTHER INFORMATION. 6) OPEN HOLE SOTLS REPORT rS REOUTRED AT FOOTTNG TNSPECTION 1,500 PSF SOIL BEARING CAPACITY. SHALL INCLUDE COMPACTION REPORT FOR ANY STRUCTURAL FILL. 7) MAtNTAIN EXISTING GARAGE / HOUSE FrRE SEPARATIONS PER 2015 IRC TABLE R302.6. B) THE BUILDING STRUCTURE HAS BEEN REVIEWED AS A PRIVATE USE GARAGE ADDITION ACCESSORY TO THE CONNECTED DWELLING #2 (BUILT IN 1977). FUTURE CHANGE IN BUILDING OCCUPANCY OR USE, WILL FIRST BE SUBJECT TO A NEW BUILDING PERMIT APPLICATION AND REVIEW FOR COMPLIANCE WITH ZONING REGULATIONS, LAND USE & BUILDING CODES IN EFFECT AT TIME OF FUTURE WORK. 9) NOTE TO OWNER: CURRENT BUILDING PERMIT WAS NOT REVIEWED FOR USE AS A COMMERCIAL BUSINESS OPERATION -- NOR FOR USE -- AS AN ADDITIONAL RESIDENTIAL DWELLING UNIT. 1O) NOTE TO OWNER: GARFIELD COUNTY COMMUNITY DEVELOPMENT DEPARTMENT ADVISE, ENCOURAGE AND RECOMMEND PROPERTY OWNER'S CALL TO REOUEST A PRE- APPLICATION CONFERENCE MEETING WITH BUILDING PLANS EXAMINER, CHIEF BUILDING OFFICIAL AND PLANNING STAFF PRIOR TO ENDEAVORING ANY TIME / COST EXPENSE PREPARING FUTURE BUILDING PERMIT / LAND USE CHANGE PERMITS TO FINISH 4BB SO FT "UNFINISHED FUTURE SPACE" OVER SAID GARAGE ADDITION. OWNER'S FUTURE USE OF SPACE WILL DETERMINE WHAT PERMITS AND LAND USE PROCESSES SHALL APPLY TO THE EXISTING PROPERry. APPROVAL OF THE CURRENT BUILDING PERMIT IS NOT A GUARANTEE OR IMPLIED APPROVAL FOR FUTURE CHANGES IN STRUCTURE USE OR OCCUPANCY. \ .$ -{'tt _5 -\ \ss