Loading...
HomeMy WebLinkAboutEngineer Detail Crystal River Civil LLC 970.510.5312 Page 1 of 1 4362 County Road 100 ADU Retaining Wall Analysis October 4th, 2024 The existing conditions onsite at 4362 County Road 100 have been reviewed and analyzed by Crystal River Civil (CRC). The boulder wall being reviewed was built to provide adequate grade change between the existing structure and the constructed autocourt. It is approximately 8 feet from the existing structure, varies in height from 2 - 6 feet, and extends roughly 70 feet. The layback of the wall varies between 0.75:1 - 1.5:1 and the rocks utilized for the wall are adequately sized and properly set into the embankment. Given the adequate layback, boulder size, and setback from the structure, CRC is not concerned about the construction, integrity, grading, or drainage regarding this retaining wall, and that there are no negative implications to the existing structure. If you have any questions or concerns, please don’t hesitate to reach out. Sincerely, Jay Engstrom Principal, P.E. Crystal River Civil LLC Jay@CrystalRiverCivil.com (970) 404 - 1144