Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF P ERMIT BLRE-0 8-24-8863 PETER MULLETT 1,200 sq ft Accessory Dwelling Unit ADU with 300 sq ft attached private garage & 4,200 sq ft barn 2510 H*y 1 33, Carbondale Sec 03, Twns 08, Range BB - 246303400040 1) ALL WORK SHALL COMPLY WITH THE 2015 INTERNATIONAL RESIDENTIAL CODE (I.R.C.) AND 2018 INTERNATIONAL ENERGY CONSERVATION CODE (I.E.C.C.) 2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED "GARFI ELD COU NTY BU I LDING REOU I REM ENTS". NUMBER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) ELECTRTCAL pERMtTTtNG AND TNSpECT|ONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. 4) ALL EXTERIOR LIGHTING TO BE DOWNCASTAND SHIELDED. S) WILDFIRE MITIGATION RECOMMENDATIONS: SHALL COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE RECOMMENDATIONS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COMMUNIry DEVELOPM ENT WEBSITE FOR ADDITIONAL I N FORMATION. 6) OPEN HOLE SOTLS REPORT rS REOUTRED AT FOOTTNG INSPECTTON AND PRIOR TO ANY CONCRETE POUR. PROVIDE COPY OF GEOTECHNICAL ENGINEERS REPORT TO THE BUILDING INSPECTOR. 1,OOO PSF SOIL BEARING. 7) SEPTIC SYSTEM REVIEW / APPROVALS: PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY PROVIDE FINAL APPROVAL /SIGN-OFF FROM GARFIELD COUNry'S PUBLIC HEALTH DEPT. B) AN ELEVATION SURVEY, SEALED BY A COLORADO PROFESSIONAL ICENSED SURVEYOR, IS REOUIRED AT FRAME INSPECTION TO VERIFY THAT AS-BUILT ROOFS COMPLY WITH GARFIELD COUNTY'S 25-FT BUILDING HEIGHT LIMIT AS DEFINED IN THE LAND USE DEVELOPMENT CODE. 9) ALL HtcH STRENGTH BOLTTNG AND FrELD WELDTNG REOUIRES SPECTAL TNSPECTOR. PROVIDE APPROVAL REPORT AT FRAMING INSPECTION. 10) BLOWER DOOR TEST tS REOUTRED FOR 1,200 SO FT ADU. MUST SUBMIT BLOWER DOOR TEST REPORT TO GARFIELD COUNTY COMMUNITY DEVELOPMENT DEPT. OFFICE PRIOR TO SCHEDULING FINAL BUILDING INSPECTION / C.O. FINAL. 11) PRESCR|pTtVE pATH W|TH RESCHECK tS CHOSEN FOR ENERGY COMPLTANCE OF THIS HOME. SEE ATTACHED MECHANICAL SPECIFICATIONS AND REPORTS. ALL NEW HOMES TO HAVE WHOLE-HOUSE MECHANICAL VENTILATION SYSTEM INSTALLED (2015 IRC TABLE m1507.3.3(1)AND (2)AS STAMPED ON COVER SHEET) 12) THtS STRUCTURE REVTEWED AS AN ACCESSORY DWELLING UNrT WITH ATTACHED PRIVATE N a N U I 0 OCCUPANCY OR USE WILL FIRST BE SUBJECT TO A NEW LAND USE AND BUILDING CODE REVIEW TO ENSURE COMPLIANCE WITH CODES IN EFFECT AT TIME OF FUTURE WORK.+a 4*t nee|l