Loading...
HomeMy WebLinkAboutResCheck Compliance Report{0. Generated by RESche ck-Web Software Compliance Certificate Project Carbondale25L0 ii,iirl ri l-lii.::r Energy Code: Location: Construction Type: Project Type: Project SubType: Conditioned Floor Area Glazing Area Climate Zone: Permit Date: Permit Number: All Electric ls Renewable Has Charger Has Battery: Has Heat Pump: Construction Site 2510 hwy 133 Carbondale, CO 20x.8 tEcc Carbondale, Colorado Single-family New Constructlon None 1,500 ft2 LOo/o s (7313 HDD) false false false false false 'r,i.''.' , ;II(.1.r, Owner/Agent: New Construction Designer/Contractor: Architectural Plans $ {. \ 39 63 24 24 24 Compliance: 15.670 Better Than Code Maximum UA: 41O Your UA: 346 The % Better or Worse Than Code lndex reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Slab-on-grade tradeoffs are no longer considered in the UA or performance compliance path in REScheck. Each slab-on-grade assembly in the specified climate zone must meet the minimum energy code insulation R-value and depth requirements. Envelope Assemblies Ceiling area of home forming top of insulation envelope: Raised or Energy Truss Wall area of home forming sides of insulation envelope: Steel Frame, L6" o.c. Energy efficient door unit: Solid Door (under 50% glazing) Energy efficient door unit: Solid Door (under 50% glazing) Energy efficient door unit: Solid Door (under 50% glazing) 1,500 2,O79 80 80 80 48.0 25.0 0.0 0.0 0.020 0.094 0.200 0.200 0.200 0.026 0.060 0.300 0.300 0.300 30 99 L6 16 16 Compliance: Passes using UA trade-off Gross Area or Perimeter Cavity R-Value Cont. R-Value Prop. Req. U-Factor U-Factor Req. UAAssemblyProp. UA glazing) Energy efficient door unit: Solid Door (under 50% glazing) 0.200 0.200 0.300 0.300 28 24 42 36L20 Project Title: Carbondale25 L0 Data filename: Report date: Lll06l24 Page 1 of10 Gross Area or Perimeter Cavity R-Value Cont. Prop. Req, Prop R-Value U-Factor U-Factor UA Req'Assembly UA Energy efficient door unit: Solid Door (under 50ozo glazing) Energy efficient door unit: Solid Door (under 50% glazing) Energy efficient door unit: Solid Door (under 50% glazing) Energy efficient door unit; Solid Door (under 50% glazing) Window area of home using energy efficient units: Vinyl Frame Slab perimeter of the home forming the bottom of the structure's insulation envelope: Slab-On-Grade (Unheated) lnsulation depth: 4.0' lnsulation position: No lnsulation 2T 2t 140 140 205 0.200 0.200 0.200 0.200 0.260 0.300 0.300 0.300 0.300 0.300 4 0 6 6 42 42 62 4 28 28 53 138 10,0 0.730 0.730 0 Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application. The proposed building has been designed to meetthe 2018 IECC requirements in REScheck Version : REScheck-Web and to comply with the mandatory requirements listed in the REScheck lnspection Checklist. Jobe Leonard Q,'1,.'&^^L 1116124 Name - Title Signature "Date Project Title: Carbondale2 5 L0 Data filename: Report date:'l"1106124 Page 2 of10 REScheck Software Version : REScheck-Web lnspection Checklist Energy Code: 2018 IECC Requirements: 0.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Additional Comments/Assumptions: Section # & Req.lD Pre-lnspection/Plan Review Plans Verified Value Field Verified Value Complies?Comments/Assumptions 103.1, 1"03.2 lPRll1 :ttl Construction drawings and , documentation demonstrate:energy code compliance for the : building envelope. Thermal ,envelope represented on construction docu ments. nComplies EDoes Not INot Observable ENot Applicable 103.1, 103.2, 403.7 lPR3ll Construction drawings and documentation demonstrate energy code compliance for lighting and mechanical systems. : Systems serving multiple dwelling units must demonstrate compliance with the IECC Commercial Provisions. DComplies nDoes Not ENot observable nNot Applicable 302 403 1 7 Heating and cooling equipment is sized per ACCA Manual S based on loads calculated per ACCA Manual J or other methods approved by the code official. Heating: Btu/hr_ Cooling: Btu/hr_ Heating: Btu/hr_ Cooling: Btu/hr_ nComplies nDoes Not INot Observable lNot Applicable lPR2l2 ttl I High lmpact (Tier 1)2 Medium lmpact (Tier 2)3 Low lmpact (Tier 3) Project Title: Carbondale2 5 10 Data filename: Report date: LllOOl24 Page 3 ofL0 Field Verifled Value Complies? Section # & Req.lD Foundatlon lnspectlon Plans Verlfled Value €omments/Aesumptions 402.1.2 iSlab edge insulation R-value. lFo111 *# : R-_ I ! Unheated i ! Heateo R-_ ! Unheated f| Heated nComplies 'EDoes Not lflNot observable ,ENot Applicable See the Envelope Assemblies '.table for values. 402.L.2 lFo3ll s ,EComplies :Dooes ruot ,ENot Observable :ENot Applicable 'See the Envelope Assemblies 'table for values. :. ft ftSlab edge insulation depth/length. A protective covering is installed to protect exposed exterior insulation and extends a minimum of 6 in. below grade.g nComplies NotflDoes ObservableENot Etr,tot 303.2.1 112 Not rSnow- and ice-melting system controls installed.TFO1212 t ENot Observable UNot Applicable Additional Comments/Assumptions: 2 Medium lm ct (Tier 2)3 Low lm ct (Tier 3)1 lm (Tier 1) Project Title: Carbondale25L0 Data filename: Report date: 1,LlO6l24 Page 4 of10 Section # & Req.lD Framing / Rough-ln lnspection Plans Verified Value Field Verified Value Complies?Comments/Assumptions 402.1,.L, 402.3.4 lFRLli g,' DComplies flDoes Not INot Observable lNot npplicable Door U-factor U-U-.See the Envelope Assemblies table for values. 402.L.L, 402.3.1, 402.3.3, 402.5 lFR211 :ttl) EComplies EDoes Not 'flNot Observable DNot Applicable U.U.See fhe Envelope Assemblies table for values. G lazin g U-factor (area-weighted average). 303.1.3 IFR4]1 .Vr U-factors of fenestration products are determined in accordance ;with the NFRC test procedure or taken from the default table. lComplies lDoes Not ENot Observable -Not Applicable 402.4.L,r lFR23l1 .1t'/ Air barrier and thermal barrier installed per manufacturer's instructions. lComplies EDoes Not INot Observable flNot applicable 402.4.3 lFR20l1 4| Fenestration that is not site built is listed and labeled as meeting AAMA /WDMA/CSA 101/I. S.2/A440 or has infiltration rates per NFRC 400 that do not exceed code limits. nComplies EDoes Not nNot Observable ENot Applicable lC-rated recessed lighting fixtures sealed at housing/interior finish and labeled to indicate <2.0 cfm leakage at 75 Pa. nComplies EDoes Not nNot Observable lNot Applicable 402.4.5 lFR1612 .Supply and return ducts in attics insulated >: R-8 where duct is'>= 3 inches in diameter and >= R-6 where < 3 inches. Supply and , return ducts in other portions of'the building insulated >= R-6 for diameter >= 3 inches and R-4.2 for < 3 inches in diameter. lComplies lDoes Not INot Observable nNot Applicable 403.3.1 lFR12l1 403.3.2 lFR1311 3d Ducts, air handlers and filter boxes are sealed with joints/seams compliant with lnternational Mechanical Code or lnternational Residential Code, as applicable. IComplies nDoes Not INot Observable nNot Applicable 403.3.5 lFRls13 v- nComplies lDoes Not INot Observable flNot Applicable Building cavities are not used as ducts or plenums. 403.4 lFRl712 1{ HVAC piping conveying fluids above 105 qF or chilled fluids below 55 eF are insulated to >R- 3. !Complies nDoes Not INot Observable rlNot Applicable R-R- 403.4.1 lFR24l1 r9i; lComplies nDoes Not INot Observable nNot npplicable Protection of insulation on HVAC piping. R-R- t, 403.5.3 Hot water pipes are insulated to DComplies nNot Observable lNot npplicable 1 lmpact (Tier 1)H 2 Medium lmpact (Tier 2)3 Low I (Tier 3) Project Title: Carbondale2 510 Data filename: Report date: Lll06l24 Page 5 of10 Sectlon # & Req.lD Framlng / Rough-ln frrsnectionl Plans Verified Value Field Varifled Value Complies?€ommentslAssumptions 403.6 lFR19]2 Automatic or installed on a gravity dampers are ll outdoor air nComplies nDoes Not INot Observable ENot Applicable intakes and exhausts. Additional CommentslAssumptions: I ct (Tier 1)H lm 2 Medium (Tier 2)3 Low I ct (Tier 3) Project Title: Carbondale25l0 Data filename: Report date: 1LlO6l24 Page 6 ofL0 Sectlon # & Reo.lD lnsulation lnspection Plans Verified Value Field Verifled Value Complies?Comments/Assumptions 303.1 ltN1312 rg All installed insulation is labeled or the installed R-values provided. lComplies nDoes Not ENot Observable nNot Applicable 402.L.'J., 402.2.5, 402.2.6 lrN3l1 "t*J Wall insulation R-value. lf this is a, R-_ mass wall with at least % of the [l Wood wall insulation on the wall . fr Uu*exterior, the exterior insulation = ^.---,requirement applies (FRIO). Ll steel R-_ n Wood fl Mass , I Steel nComplies nDoes Not flNot Observable INot Applicable See fhe Envelope Assemblies table for values. !Complies EDoes Not INot Observable nNot Applicable 303.2 lrN4l1 Wall insulation is installed per manufacturer's instructions. Additional Comments/Assumptions: 1 High lmpact (Tier 1)2 Medium lmpact (Tier 2)3 Low lm (Tier 3) Project Title: Carbondale25l0 Data filename: Report date:1-1106124 Page 7 of10 Section # & Req.lD Final lnspection Provisions Plans Verified Value Field Verified Value Complies?Comments/Assumptions 402.1.1, Ceiling insulation R-value. 402.2.r, 402.2.2, 402.2,6 lFt1l1 flComplies EDoes Not INot Observable lNot npplicable see the Envelope Assemblies table for values. R-_ ! Wood ! Steel R-_ ! Wood I Steel 303.1.1.1, 'Ceiling insulation installed per303.2 manufacturer's instructions. tFl2ll iBlown insulation marked every 300 ftr. DComplies EDoes Not ENot Observable [JNot Applicable Vented attics with air permeable insulation include baffle adjacent to soffit and eave vents that extends over insulation. lComplies lDoes Not INot Observable ENot Applicable 442.2.3 lFt22',l2 Attic access hatch and door insulation >R-value of the adjacent assembly. ,flComplies [Does Not INot Observable :nNot applicable R-R-402.2.4 lFl3ll :Blower door test @ 50 Pa. <=5 ach in Climate Zones 1-2, andr<=3 ach in Climate Zones 3-8. ICompliesrIDoes Not ENot Observable :nNot Applicable ACH 50 =ACH 50 =402.4.t.2 lFt17l1 Ducts are pressure tested to determine air leakage with either: Rough-in test: Total leakage measured with a pressure differential of 0.1 inch w.g. across the system including the manufacturer's air handler enclosure if installed at time of test. Postconstruction test: Total leakage measured with a pressure differential of 0.1 inch w.g. across the entire system including the manufacturer's air handler enclosure. cfm/100 cfm/100 ft2 ft2 Complies403.3.3 lFt2711 lDoes Not nNot Observable flNot Applicable Duct tightness test result of <=4 cfm/L00 ft2 across the system or <=3 cfm/100 ft2 without air handler @ 25 Pa. For rough-in tests, verification may need to cfm/100 cfm/100E-ai- occur during Fram lns ton. n403.3.4 lFl4ll DNot Observable !Not Applicable Complies Does Not 403 lFl9 .1 12 1 code tions. Complies 403.3.2.1 lFt24l1 Air handler leakage designated by manufacturer at <=2o/o of design air flow.INot Observable nNot npplicable Programmable thermostats installed for control of primary heating and cooling systems and initially set by manufacturer to Complies Does Not EDoes Not lNot Observable nNot Applicable DComplies nDoes Not nNot observable l nNot Applicable lFl1012 1.2 Heat pump thermostat installed on heat pumps. 403.5.1 Circulating service hot water DComplies INot Observable flNot Applicable accessible manual controls. 1 hlm (Tier 1)H 2 Medium lm ct (Tier 2)3 Low lm (Tier 3) Project Title: Carbondale2 5 10 Data filename: Report date: Llll6l24 Page I of10 Final lnspection Provisions Plans Verified Value Field Verified Value Complies?Comments/Assumptions All mechanical ventilation system fans not part of tested and listed HVAC equipment meet efficacy and air flow limits per Table R403.6.1-. Hot water boilers supplying heat through one- or two-pipe heating systems have outdoor setback control to lower boiler water temperature based on outdoor temperature. 403,6.1 lFt25l2 403.2 lFt2612 lDoes Not nNot Observable DNot Applicable nComplies EDoes Not DNot Observable lNot Applicable Heated water circulation systems have a circulation pump. The system return pipe is a dedicated return pipe or a cold water supply pipe. Gravity and thermos- syphon circulation systems are not present. Controls for circulating hot water system pumps start the pump with signal for hot water demand within the occupancy. Controls automatically turn offthe pump when water is in circulation loop is at set-point temperature and no demand for hot water exists. 403.5.1.1 lFt28l2 nComplies DDoes Not ENot Observable lNot Applicable Electric heat trace systems comply with IEEE 515.1 or UL 515. Controls automatically adjust the energy input to the heat tracing to maintain the desired water temperature in the piping. [Complies lDoes Not ENot Observable ENot Applicable 403.5.1..2 lFt29l2 Demand recirculation water systems have controls that manage operation of the pump and limit the temperature of the water entering the cold water piping to <= L04aF. nComplies nDoes Not INot Observable nNot Applicable 403.5.2 lFt30l2 Drain water heat recovery units tested in accordance with CSA 855.1. Potable water-side pressure loss of drain water heat recovery units < 3 psi for individual units connected to one or two showers. Potable water- side pressure loss of drain water heat recovery units < 2 psifor individual units connected to three or more showers. 403.5.4 112 n ENot Observable lNot Applicable Complies Does Not lComplies EDoes Not ENot Observable INot Applicable 404.1 lFt6ll 9oo/o or more of permanent fixtures have high efficacy lamps 404.1.1 lFr23l3 !3/ lComplies nDoes Not INot Observable INot Applicable Fuel gas lighting systems have no continuous pilot light. 401,.3 lFl712 EComplies nDoes Not Compliance certificate posted. nNot Applicable 1 hlm ct (Tier L)2 Medium I (Tier 2)3 Low lm ct (Tier 3) Project Title: Carbondale2 510 Data filename: Report date: 1.1.106124 Page 9 ofL0 Sectlon # & Reo.lD Final lnspection Provislons Plans Verlfled Value Fleld Verifled Value Complies?Comments/Assumptions 303.3 lFr18l3 , Manufacturer manuals for mechariical and water heating :systems have been provided. nComplies EDoes Not nNot Observable ENot Applicable Additional Comments/Assumptions: I h lmpact (Tier 1)H 2 Medium lmpact (Tier 2)3 Low lm (Tier 3) Project Title: Carbondale25 L0 Data filename: Report date: Lll06l24 Page 10 of10 fr 201 S IECC Energy Effi ciency Certificate Above-Grade Wall Below-Grade Wall Floor Ceiling / Roof Ductwork (unconditioned spaces) : Window Door Heating System: Cooling System Water Name: Comments 25.O0 o.oo 10.oo 48.OO o.26 o.20 Date: lnsulation Rating R-Value Glass & Door Rating U-Factor SHGC EfficiencyHeating & Cooling Equipment