HomeMy WebLinkAboutResCheck Compliance Report{0.
Generated by RESche ck-Web Software
Compliance Certificate
Project Carbondale25L0 ii,iirl ri l-lii.::r
Energy Code:
Location:
Construction Type:
Project Type:
Project SubType:
Conditioned Floor Area
Glazing Area
Climate Zone:
Permit Date:
Permit Number:
All Electric
ls Renewable
Has Charger
Has Battery:
Has Heat Pump:
Construction Site
2510 hwy 133
Carbondale, CO
20x.8 tEcc
Carbondale, Colorado
Single-family
New Constructlon
None
1,500 ft2
LOo/o
s (7313 HDD)
false
false
false
false
false
'r,i.''.'
, ;II(.1.r,
Owner/Agent:
New Construction
Designer/Contractor:
Architectural Plans
$
{.
\
39
63
24
24
24
Compliance: 15.670 Better Than Code Maximum UA: 41O Your UA: 346
The % Better or Worse Than Code lndex reflects how close to compliance the house is based on code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home.
Slab-on-grade tradeoffs are no longer considered in the UA or performance compliance path in REScheck. Each slab-on-grade
assembly in the specified climate zone must meet the minimum energy code insulation R-value and depth requirements.
Envelope Assemblies
Ceiling area of home forming top of insulation
envelope: Raised or Energy Truss
Wall area of home forming sides of insulation
envelope: Steel Frame, L6" o.c.
Energy efficient door unit: Solid Door (under 50%
glazing)
Energy efficient door unit: Solid Door (under 50%
glazing)
Energy efficient door unit: Solid Door (under 50%
glazing)
1,500
2,O79
80
80
80
48.0
25.0
0.0
0.0
0.020
0.094
0.200
0.200
0.200
0.026
0.060
0.300
0.300
0.300
30
99
L6
16
16
Compliance: Passes using UA trade-off
Gross Area
or
Perimeter
Cavity
R-Value
Cont.
R-Value
Prop. Req.
U-Factor U-Factor
Req.
UAAssemblyProp.
UA
glazing)
Energy efficient door unit: Solid Door (under 50%
glazing)
0.200
0.200
0.300
0.300
28
24
42
36L20
Project Title: Carbondale25 L0
Data filename:
Report date: Lll06l24
Page 1 of10
Gross Area
or
Perimeter
Cavity
R-Value
Cont. Prop. Req, Prop
R-Value U-Factor U-Factor UA
Req'Assembly UA
Energy efficient door unit: Solid Door (under 50ozo
glazing)
Energy efficient door unit: Solid Door (under 50%
glazing)
Energy efficient door unit: Solid Door (under 50%
glazing)
Energy efficient door unit; Solid Door (under 50%
glazing)
Window area of home using energy efficient units:
Vinyl Frame
Slab perimeter of the home forming the bottom of
the structure's insulation envelope: Slab-On-Grade
(Unheated)
lnsulation depth: 4.0'
lnsulation position: No lnsulation
2T
2t
140
140
205
0.200
0.200
0.200
0.200
0.260
0.300
0.300
0.300
0.300
0.300
4
0
6
6
42
42
62
4
28
28
53
138 10,0 0.730 0.730 0
Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other
calculations submitted with the permit application. The proposed building has been designed to meetthe 2018 IECC requirements in
REScheck Version : REScheck-Web and to comply with the mandatory requirements listed in the REScheck lnspection Checklist.
Jobe Leonard Q,'1,.'&^^L 1116124
Name - Title Signature "Date
Project Title: Carbondale2 5 L0
Data filename:
Report date:'l"1106124
Page 2 of10
REScheck Software Version : REScheck-Web
lnspection Checklist
Energy Code: 2018 IECC
Requirements: 0.0% were addressed directly in the REScheck software
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Additional Comments/Assumptions:
Section
#
& Req.lD
Pre-lnspection/Plan Review Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
103.1,
1"03.2
lPRll1
:ttl
Construction drawings and
, documentation demonstrate:energy code compliance for the
: building envelope. Thermal
,envelope represented on
construction docu ments.
nComplies
EDoes Not
INot Observable
ENot Applicable
103.1,
103.2,
403.7
lPR3ll
Construction drawings and
documentation demonstrate
energy code compliance for
lighting and mechanical systems.
: Systems serving multiple
dwelling units must demonstrate
compliance with the IECC
Commercial Provisions.
DComplies
nDoes Not
ENot observable
nNot Applicable
302
403
1
7
Heating and cooling equipment is
sized per ACCA Manual S based
on loads calculated per ACCA
Manual J or other methods
approved by the code official.
Heating:
Btu/hr_
Cooling:
Btu/hr_
Heating:
Btu/hr_
Cooling:
Btu/hr_
nComplies
nDoes Not
INot Observable
lNot Applicable
lPR2l2
ttl
I High lmpact (Tier 1)2 Medium lmpact (Tier 2)3 Low lmpact (Tier 3)
Project Title: Carbondale2 5 10
Data filename:
Report date: LllOOl24
Page 3 ofL0
Field Verifled
Value Complies?
Section
#
& Req.lD
Foundatlon lnspectlon Plans Verlfled
Value €omments/Aesumptions
402.1.2 iSlab edge insulation R-value.
lFo111
*#
: R-_
I ! Unheated
i ! Heateo
R-_
! Unheated
f| Heated
nComplies
'EDoes Not
lflNot observable
,ENot Applicable
See the Envelope Assemblies
'.table for values.
402.L.2
lFo3ll
s
,EComplies
:Dooes ruot
,ENot Observable
:ENot Applicable
'See the Envelope Assemblies
'table for values.
:.
ft ftSlab edge insulation
depth/length.
A protective covering is installed
to protect exposed exterior
insulation and extends a
minimum of 6 in. below grade.g
nComplies
NotflDoes
ObservableENot
Etr,tot
303.2.1
112
Not
rSnow- and ice-melting system
controls installed.TFO1212
t ENot Observable
UNot Applicable
Additional Comments/Assumptions:
2 Medium lm ct (Tier 2)3 Low lm ct (Tier 3)1 lm (Tier 1)
Project Title: Carbondale25L0
Data filename:
Report date: 1,LlO6l24
Page 4 of10
Section
#
& Req.lD
Framing / Rough-ln lnspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1,.L,
402.3.4
lFRLli
g,'
DComplies
flDoes Not
INot Observable
lNot npplicable
Door U-factor U-U-.See the Envelope Assemblies
table for values.
402.L.L,
402.3.1,
402.3.3,
402.5
lFR211
:ttl)
EComplies
EDoes Not
'flNot Observable
DNot Applicable
U.U.See fhe Envelope Assemblies
table for values.
G lazin g U-factor (area-weighted
average).
303.1.3
IFR4]1
.Vr
U-factors of fenestration products
are determined in accordance
;with the NFRC test procedure or
taken from the default table.
lComplies
lDoes Not
ENot Observable
-Not Applicable
402.4.L,r
lFR23l1
.1t'/
Air barrier and thermal barrier
installed per manufacturer's
instructions.
lComplies
EDoes Not
INot Observable
flNot applicable
402.4.3
lFR20l1
4|
Fenestration that is not site built
is listed and labeled as meeting
AAMA /WDMA/CSA 101/I. S.2/A440
or has infiltration rates per NFRC
400 that do not exceed code
limits.
nComplies
EDoes Not
nNot Observable
ENot Applicable
lC-rated recessed lighting fixtures
sealed at housing/interior finish
and labeled to indicate <2.0 cfm
leakage at 75 Pa.
nComplies
EDoes Not
nNot Observable
lNot Applicable
402.4.5
lFR1612
.Supply and return ducts in attics
insulated >: R-8 where duct is'>= 3 inches in diameter and >=
R-6 where < 3 inches. Supply and
, return ducts in other portions of'the building insulated >= R-6 for
diameter >= 3 inches and R-4.2
for < 3 inches in diameter.
lComplies
lDoes Not
INot Observable
nNot Applicable
403.3.1
lFR12l1
403.3.2
lFR1311
3d
Ducts, air handlers and filter
boxes are sealed with
joints/seams compliant with
lnternational Mechanical Code or
lnternational Residential Code, as
applicable.
IComplies
nDoes Not
INot Observable
nNot Applicable
403.3.5
lFRls13
v-
nComplies
lDoes Not
INot Observable
flNot Applicable
Building cavities are not used as
ducts or plenums.
403.4
lFRl712
1{
HVAC piping conveying fluids
above 105 qF or chilled fluids
below 55 eF are insulated to >R-
3.
!Complies
nDoes Not
INot Observable
rlNot Applicable
R-R-
403.4.1
lFR24l1
r9i;
lComplies
nDoes Not
INot Observable
nNot npplicable
Protection of insulation on HVAC
piping.
R-R-
t,
403.5.3 Hot water pipes are insulated to DComplies
nNot Observable
lNot npplicable
1 lmpact (Tier 1)H 2 Medium lmpact (Tier 2)3 Low I (Tier 3)
Project Title: Carbondale2 510
Data filename:
Report date: Lll06l24
Page 5 of10
Sectlon
#
& Req.lD
Framlng / Rough-ln frrsnectionl Plans Verified
Value
Field Varifled
Value Complies?€ommentslAssumptions
403.6
lFR19]2
Automatic or
installed on a
gravity dampers are
ll outdoor air
nComplies
nDoes Not
INot Observable
ENot Applicable
intakes and exhausts.
Additional CommentslAssumptions:
I ct (Tier 1)H lm 2 Medium (Tier 2)3 Low I ct (Tier 3)
Project Title: Carbondale25l0
Data filename:
Report date: 1LlO6l24
Page 6 ofL0
Sectlon
#
& Reo.lD
lnsulation lnspection Plans Verified
Value
Field Verifled
Value Complies?Comments/Assumptions
303.1
ltN1312
rg
All installed insulation is labeled
or the installed R-values
provided.
lComplies
nDoes Not
ENot Observable
nNot Applicable
402.L.'J.,
402.2.5,
402.2.6
lrN3l1
"t*J
Wall insulation R-value. lf this is a, R-_
mass wall with at least % of the [l Wood
wall insulation on the wall . fr Uu*exterior, the exterior insulation = ^.---,requirement applies (FRIO). Ll steel
R-_
n Wood
fl Mass
, I Steel
nComplies
nDoes Not
flNot Observable
INot Applicable
See fhe Envelope Assemblies
table for values.
!Complies
EDoes Not
INot Observable
nNot Applicable
303.2
lrN4l1
Wall insulation is installed per
manufacturer's instructions.
Additional Comments/Assumptions:
1 High lmpact (Tier 1)2 Medium lmpact (Tier 2)3 Low lm (Tier 3)
Project Title: Carbondale25l0
Data filename:
Report date:1-1106124
Page 7 of10
Section
#
& Req.lD
Final lnspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.1, Ceiling insulation R-value.
402.2.r,
402.2.2,
402.2,6
lFt1l1
flComplies
EDoes Not
INot Observable
lNot npplicable
see the Envelope Assemblies
table for values.
R-_
! Wood
! Steel
R-_
! Wood
I Steel
303.1.1.1, 'Ceiling insulation installed per303.2 manufacturer's instructions.
tFl2ll iBlown insulation marked every
300 ftr.
DComplies
EDoes Not
ENot Observable
[JNot Applicable
Vented attics with air permeable
insulation include baffle adjacent
to soffit and eave vents that
extends over insulation.
lComplies
lDoes Not
INot Observable
ENot Applicable
442.2.3
lFt22',l2
Attic access hatch and door
insulation >R-value of the
adjacent assembly.
,flComplies
[Does Not
INot Observable
:nNot applicable
R-R-402.2.4
lFl3ll
:Blower door test @ 50 Pa. <=5
ach in Climate Zones 1-2, andr<=3 ach in Climate Zones 3-8.
ICompliesrIDoes Not
ENot Observable
:nNot Applicable
ACH 50 =ACH 50 =402.4.t.2
lFt17l1
Ducts are pressure tested to
determine air leakage with
either: Rough-in test: Total
leakage measured with a
pressure differential of 0.1 inch
w.g. across the system including
the manufacturer's air handler
enclosure if installed at time of
test. Postconstruction test: Total
leakage measured with a
pressure differential of 0.1 inch
w.g. across the entire system
including the manufacturer's air
handler enclosure.
cfm/100 cfm/100
ft2 ft2
Complies403.3.3
lFt2711 lDoes Not
nNot Observable
flNot Applicable
Duct tightness test result of <=4
cfm/L00 ft2 across the system or
<=3 cfm/100 ft2 without air
handler @ 25 Pa. For rough-in
tests, verification may need to
cfm/100 cfm/100E-ai-
occur during Fram lns ton.
n403.3.4
lFl4ll
DNot Observable
!Not Applicable
Complies
Does Not
403
lFl9
.1
12
1
code tions.
Complies
403.3.2.1
lFt24l1
Air handler leakage designated
by manufacturer at <=2o/o of
design air flow.INot Observable
nNot npplicable
Programmable thermostats
installed for control of primary
heating and cooling systems and
initially set by manufacturer to
Complies
Does Not
EDoes Not
lNot Observable
nNot Applicable
DComplies
nDoes Not
nNot observable l
nNot Applicable
lFl1012
1.2 Heat pump thermostat installed
on heat pumps.
403.5.1 Circulating service hot water DComplies
INot Observable
flNot Applicable
accessible manual controls.
1 hlm (Tier 1)H 2 Medium lm ct (Tier 2)3 Low lm (Tier 3)
Project Title: Carbondale2 5 10
Data filename:
Report date: Llll6l24
Page I of10
Final lnspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
All mechanical ventilation system
fans not part of tested and listed
HVAC equipment meet efficacy
and air flow limits per Table
R403.6.1-.
Hot water boilers supplying heat
through one- or two-pipe heating
systems have outdoor setback
control to lower boiler water
temperature based on outdoor
temperature.
403,6.1
lFt25l2
403.2
lFt2612
lDoes Not
nNot Observable
DNot Applicable
nComplies
EDoes Not
DNot Observable
lNot Applicable
Heated water circulation systems
have a circulation pump. The
system return pipe is a dedicated
return pipe or a cold water supply
pipe. Gravity and thermos-
syphon circulation systems are
not present. Controls for
circulating hot water system
pumps start the pump with signal
for hot water demand within the
occupancy. Controls
automatically turn offthe pump
when water is in circulation loop
is at set-point temperature and
no demand for hot water exists.
403.5.1.1
lFt28l2
nComplies
DDoes Not
ENot Observable
lNot Applicable
Electric heat trace systems
comply with IEEE 515.1 or UL
515. Controls automatically
adjust the energy input to the
heat tracing to maintain the
desired water temperature in the
piping.
[Complies
lDoes Not
ENot Observable
ENot Applicable
403.5.1..2
lFt29l2
Demand recirculation water
systems have controls that
manage operation of the pump
and limit the temperature of the
water entering the cold water
piping to <= L04aF.
nComplies
nDoes Not
INot Observable
nNot Applicable
403.5.2
lFt30l2
Drain water heat recovery units
tested in accordance with CSA
855.1. Potable water-side
pressure loss of drain water heat
recovery units < 3 psi for
individual units connected to one
or two showers. Potable water-
side pressure loss of drain water
heat recovery units < 2 psifor
individual units connected to
three or more showers.
403.5.4
112 n
ENot Observable
lNot Applicable
Complies
Does Not
lComplies
EDoes Not
ENot Observable
INot Applicable
404.1
lFt6ll
9oo/o or more of permanent
fixtures have high efficacy lamps
404.1.1
lFr23l3
!3/
lComplies
nDoes Not
INot Observable
INot Applicable
Fuel gas lighting systems have
no continuous pilot light.
401,.3
lFl712
EComplies
nDoes Not
Compliance certificate posted.
nNot Applicable
1 hlm ct (Tier L)2 Medium I (Tier 2)3 Low lm ct (Tier 3)
Project Title: Carbondale2 510
Data filename:
Report date: 1.1.106124
Page 9 ofL0
Sectlon
#
& Reo.lD
Final lnspection Provislons Plans Verlfled
Value
Fleld Verifled
Value Complies?Comments/Assumptions
303.3
lFr18l3
, Manufacturer manuals for
mechariical and water heating
:systems have been provided.
nComplies
EDoes Not
nNot Observable
ENot Applicable
Additional Comments/Assumptions:
I h lmpact (Tier 1)H 2 Medium lmpact (Tier 2)3 Low lm (Tier 3)
Project Title: Carbondale25 L0
Data filename:
Report date: Lll06l24
Page 10 of10
fr 201 S IECC Energy
Effi ciency Certificate
Above-Grade Wall
Below-Grade Wall
Floor
Ceiling / Roof
Ductwork (unconditioned spaces) :
Window
Door
Heating System:
Cooling System
Water
Name:
Comments
25.O0
o.oo
10.oo
48.OO
o.26
o.20
Date:
lnsulation Rating R-Value
Glass & Door Rating U-Factor SHGC
EfficiencyHeating & Cooling Equipment