Loading...
HomeMy WebLinkAboutEngineer's Framing LetterO ALBRIGHT&ASSOCIATFS STRUCTURAL ENGINEERS FIELD REPORT To : Roger Eshelman From: JackAlbright Date : November 13,2074 Re r Eshelman ADU Those Presentr Roger Eshelman Jack Albright, Albright & Associates 'l I was on site to observe the final framing conditions of the propefty referenced above. The framing and miscellaneous amendments were in place and appeared to be as directed. The following are items of note that varied from the original plans or were noted by the building inspector for our review. Item 1: Theuseof Grade8boltsinlieuof the A3l5boltsspecifiedbytheplansareacceptablein this application. Item 2: The Entry door had a steel frame installed in lieu of the original in.wall header specified on the plans' This issue was coordinated with us and performed under our direction and is acceptable as installed. Item 3: The raised platform at the Laundry was added from the original stair opening. This work was done under our direction and is acceptable as installed. Item 4: I reviewed the column pack-outs at the upper floor framing system and they appear to be installed as required. Item 5: There was a small notch in the upper flange of a floor joist approximately 6" from the end of the joist. Due to the specific location this notch is acceptable without remediation. Item 6; The Entry Deck geometry and framing was revised from our original plans. 'W'e have reviewed and documented the revised condition. See Clarification C1.1.2 for additional information. The deck is acceptable as installed. Item 7: i have reviewed the revised window layout and the impact to the shear wall lateral system. The remaining solid walls that have been blocked and nailed off p.r the plans is adequate for the structure. No remediation was required, and the existing condition is acceptabie as installed. TLre aboqte represents oln report of events noted and items discussed, and, wiIL be relied upon ds true and, correct by aLL parties unlrss notified within 5 working da.ys of receipt. 21040 FR1 l: 970.927. 4363 I f:970.$27.3039 17352 A Hig1ly]lay B2 I Carbondats, c0 s1623 I atbrig1lt-ass0ciates.c0ln + F&c r L_ T I L_ II I _t o o +4',-8u T\7 110'- 0 4 _l cnl+N ca t-- -F + \o 60 r----l Ar. slne il-12- PARTIAL FOUNDATION P ttr @ 1/4',= 1'-0 4" CONCRETE SLAB W/ 6x6Nl.4 x\71.4'W\7F OVER COMPACTED GRANULAR BASE (CONTROL JOTNTS @ 15'.0" O.C. MAX.) JOB #21040 SHEET: c1.1 OF: Z RIGHT &, ASSOCIATES 97 o.927.4j53 office . 97 o.g27.jo3g fax z Park Ave., Unit A r Basalt, CO 81621 ISSUED: 1r/12/24 DRAWN BY: ACS CLARIFICATION ESHELMAN ADU ?378 COUNTY ROAD 1OO CARBONDALE, CO 81623 Qo Nn (e) @XGI j-2x8 2x8 LEDGER w/ l/7"Ax8" TITEN HD @ 12" O.C. 2.91/7', J N C>' ,l<F& REF. 52.1 JOB #21040 v L/-f - I'v 7 SHEET: CT.7 OF: ISSUED: 1t/12/24 DRAWN BY ACS CLARIFICATION ESHELMAN ADU 7378 COUNTY ROAD 1OO CARBONDALE, CO 81623 ALBRIGHT &. ASSOCIATES 97o.927.4363 office t 97o.927.3039 fax 4o2 Park Ave., Unit A r Basalt, CO 81621 @ L__lL__l f I t-- I o 44'-8', RIGHT &, ASSOCIATES 927 4 3 5 3 office 7o 9 27 .3 o3 9 fax T\7 110'- 0 TF 99'.4 AF& 4" CONCRETE SLAB YJ/ 6x6NIl'4 x\71.4 .W\fF OVER COMPACTED GRANULAR BASE (CONTROL JOTNTS @ 15'-0" O.C. MAX.) \c) oo PARTIAL FOUNDATION PLAN --1 t-- --+- + A T. SLAB---tt-- z 1 #2t040 SHEET: cl,1 OF: Z CLARIFICATION ESHELMAN ADU ?3?8 COUNTY ROAD lOO CARBONDALE, CO 81623 ISSUED: rt/12/24 DRAWN BY: ACS 97 o Park Ave U nit A 9 Ba salt,co 8r 6 2 a 43 A< F q o \o GJ OOc)\c) O FA J GI o' rl cn 1'-0u N *ffiu @, PAMTAL MAIN FRAMING PLAN @ l/4" = 1'-0 s2.1 JOB #21040 SHEET CI,7 OF: Z r) cl eJ @xrJ2x8 LEDGER w/ L/Z"Ax8" TITEN HD @ 12" O.C. 7.9 W I 1 rJ<F&o ALBRIGHT &. ASSOCIAIES 97 o.927.4j63 office . 97 o.927.3o39 fax 4oz Park Ave., Unit A r Basalt, CO 81621 I55UED: 1t/12/24 DRAWN BY: ACS CLARIFICATION ESHELMAN ADU 73?8 COUNTY ROAD 1OO CARBONDALE, CO 81623