Loading...
HomeMy WebLinkAboutDRC ApprovalBATTLEMENT MESA ir-.--i,Service Association November 7. 2024 J Martinez & Co. Attn: Don Reboul I I 61 Munro Ave. Rifle, CO. 81650 RE: 20 Roan Creek Dr. Dear Don, This letter is regarding your application to the Architectural Committee for new home construction. The Architectural Committee met on Wednesday, November 6,2024.Your application has been approved. Please contact Steve Rippy if you have any questions. 970-28-5-9050 Rcgards, Keatttin Ptetce Kearstin Pierce Admin Assistant Enclosure ' 1/r' (1'1"1r'/o I)rttrrr 401 A.royo Drive Sattlement Mera, Colorado 81615 ,,,,,,"': 970.185.9412 '.'; 970.285.9631 ,.^'.: SMSA@AattlementMesacolor.do.€om -r r: www.BattlementMeracolorado.com t tt. I&;Service Association ATTLEMENT MESA i----, 2 2 o2/Vi Name: Address: Cell Phone:I Name Address Street Address -r li^ . 9r; R.,-- ^ (' nt l, Dni ./t I [\,Datei Lot #3 Block # Owner:tA r City: !.ad. T"l"pt o.r"ezo- 36 - 0tS? Co ,rn 35State: Number: o yv! -'/727 E-mail: General Contractor:c +C,D"n e )// (, / /ilun.o /ve Citv /(ttlP State ('b zip 3/6So Telephone: Cell Phone: E mail q7o - do^@ tt^-co. oYqJ d,lA Address lil E 3r ax Number: Architect Or Drafuoan:Name City J/e Qzo - sGb- 8b? o Fax Number: ate (o zip kta;o Telephone: Cell Phone: E-mail '!0 Co t7\ Sectioo 1. As rhe Architecrural Standards are modified periodically aod these modifications may not be listed on this Applicarion, it is rhe responsibility of the owaer or his authorized agent(s) to ensure that the design and coostmction of a project conform to the requirements of the Architectural Standards- The intent of this Application is to provide a guide for an owre! or rhe archirect to ensure a complete submittal. However, this applicatioo shall be signed, dated and submitted with the plans package in order for the preliminary submirnl to be deemed complete by the Architectural Review Committee. Failure to do so may delay review ofthe proposal. The Architecrural Standar& are comprehensive in scope for designing homes within Battlement Mesa. Please review the Architectural Standards carefully prior to presenting a submittal to the Architectural Review Committee. ( ARCHITECTI,'RAI REVIEW COMMITTEE (ARC) NEW HOME CONSTRUCTION APPUCATION /t, 'l CONSTRUCTION DRAWING REVIEW OWNER: Brad & Cindy skinner CONTRACTOR: J. M3{ine, & Co VILLAGE: 2 Qa,c Battlement Creek Village S1 Address: 20 Roan Creek P rce Block: 1 2,204 5q. Ft 22 Asphalt Shingles 3 Height timitsl 6arage 5te Erterior wall Mate.ial Minimum Living A.ea 2000 5q ft 35 Feet Aspha l.omposll on shins es{ m!n bqlo vr !a!@!r!Y a4tr!e!1!EL shlnEler {ootstandard 3 tab)). Slale or manufactured tlle 5:12 4:12 1:12 6112 2) 24 23', Stucco. 8rick. combination of the two Combination with stone or natural wood accent. Sheel hardboa.d or sheel wood s din!. Lao VlnylSid na. Lap MetalSidine ExteriorWallAc.ent Side Yrrd S€tba.k Natural wood, brick,stone 25', 10 25 Exterior Wall Color: Behr Sitver Bullei Exterior Trim Color: Roof MaterialColo. Ony, Black Soffit Color:TBD fascia Colo.lamei Hardae Con.rete Board NOTES: 22 ATTLEMENT MESA. Yryrryry, The Preliminary Plan subminal package shall ccinsist of the following. Please complete any addirional information that is required in the spaces provided below- fr17 / A. Sir" plul ut ^n appropriate scale (nor Iess than 1/20"=1') showing the location of buildings, building envelope, building setback dimensions, the residence and all buildings or other stmctures, driveway, parking areas and a grading plan aad drainage plan, including existing and proposed topography and preliminary landscape plan. Preliminary landscape plan may be combined on Site pian. -/ fl 5, 0 " 5' l'B. Roof plan and fl oor plan ar no less than I/8'- l'. y' C. Exteior elevations (all) with both existing and 6nal grade lines at same scale as floor plans. At ARC's discretion, additional materials may be required. t/ La Note: A, B, C above shall courist of two (2) couptrete firll size ses, and four (4) reduced size 8l{" by 11" eets. Atr elecuoric file itr PDF foreat may also be seut to the Architectur.l Review Connittee of the site pla.n iadicating ttre location of all proposed imFovemelt5, laadscape plan aad all eferior eler.ations. D- Statement of building height: Maximum Height Limit 35 ' ectual Building Height ) i t S,ritairg treight shall be clearly indicated on rhe architectural plans and be tied to undisturbed site grade. Actual reference grade on site must be shown along with the height calculation. .&;Service Association Siding Stucco MARoof Stone Cladding Soffit A , ^,\ai a k { rkt.Zjfri_ Fascia ^45 Hru)(1,n.'.I t.,-J Other Nud Siuttt ,l ,/ Note color eaople uee& m be at least 5" x 6". Stucco color should be on stucco sample with texture. 'a F. A site plan that clearly indicates undisturbed site grade contours (2 foot iotervals) and proposed finished grade contoun. Undisturbed site grade contours and a reference benchmark tied to absolute elevations shall be established. The site plans shall clearly indicate proposed drainage paths and collection points for the completed site. y' H. Staliog, The applicart shall provide preliminary staking at the comers of the residence or other major improvement and at such other locations as requested by the ARC. y' l. tandscape ptans shall include the identical final grade contours as the site plan along with clevations and locations of all berms. l. An ARC Fee, in the amount of $300, is payable to the Battlement Mesa Seryice Association. This fee will cover the ARC Meeting time and on-site rnspectiolts. ltis fee. assumes up to three (3) hours of meeting time. Additional fees may be required for extended meeting times. K. Builder's Complerion Deposit is payable to the Battlehent Mesa Service Association. The minimum amount of this deposit is $3500. Structures with floor area as in Architectural Standards encompassiag more than 1200 square feet of total enclosed space of Site Built Homes will be assessed at a rate of$3500 plus $1 per square foot for each square foot over 1200. E. Indicatiorr of materials and co]ors. ?"' G- Any drawings, materials or samples requested by the ARC. @ ATTLEMENT MESA YryriY Service Association L. This deposit will be held by rhe Association to guarantee that work will be complered according to rhe rerms of the Battlement Mesa Architectural Standards and will help remedy any violations of said Srandards. This deposit, less any penalties, will be retumed to the Owner/Builder aiier the ARC receives a Certihcate ofOccupancy and after confirming that all improvements conform to the approved plans. All aeceesary oaterials for the Prelioiaary Review must be submitted to tie ARC six dayr prior m your scheduled meeting. To or1ledite the desigrl review process, be zure that your Prdioiury Submittal is complete according to the Architectural Sta.ndards. Incomplete submittals will carse delaye h receiving approval. Please subnit 2 copies of ttris application fora witl the Preliminary Review Pac&et. Sectiou tr. The following questions must be answered in order for the ARC !o deem rhis applicarion complete Construction Methods: 1 Do you intend to use gyl\|cared wall slsrems? '* CY, 2. Do you intend to use prefabricated components as stated in Section 4.06 & 4.07 of the Standards, other than roof trusses, cabiuetry, foundation paaels, metal fireplace iDserts, exterior or interior handrails, or prefabricate(stairs? Yes (No \ &ction III. I hereby ceni$ that the building plans, site plan and landscape plans, as well as the inJormation in this Preliminary Review Application, are all accurate and have been submitted to rhe Architectural Review Committee pursuant to the requiements ofrhe Architectur"al Stander&. As lhe owner or owner's agent, I agree that the ARC and the inspeclor shall not be held liable or responsible in any manner for any action or for arly failure to act in the exercise of their rcsponsibilities ulder the Battlemen! Mesa Service Association CovenaDt, Conditions and Restrictions for Battlement Mesa if the action or failure to act was in good faith and without malice. z; {r.-- A,WP"7fi; O 2 / /Owner Agent(s)te ATTLEMENT MESA. i----,Service Association [fAI Exterior Elevations - Include exterior materia] indication (Section I, E). @Roof Pitch - Primary and secondary. [fGucer/Downspouts [}Neighbor Impacts - Exterior residence and tandscape light, gange entry, refuse storage, pool decks air conditioning units, satellite dishes, irrigation pump aad intake structure, etc. [} Construction Staging Issues, parking, access, erc. [fScale & Relationship to Site - Include site contour. SITE PI,AN B Propeny Boundaries & Building Envelope pfEasements & Setbacks - All easements and setback must be defined on the Site PIan I f"ildirg, o.i""*ay, Parking Areas & Walk Locations - Specify all proposed surface materia]s EfExisting & Finished Grading shorving contours at ten foot (10') intervals El Excawtion Limils @ Utility Serlce Line Rouring, Tap Locations, Traasformers, Fire Hydrants, erc. @Topognphic Survey p Soil Investigation & Foundatioo Recommendition [] Storm Water/Runoff Control Merhods & Locations EIAU Orher Sile lmprovements - Retaining walls, decks, etc. plParking Space Locations I-A.NDSCAPE PLA.N ection for Existing Trees & vegetation Massing of Proposed Evergleen & Deciduous Tlees Areas of Proposed Ground Cover Iandscape PIan Submital to Include Irrigation, Grading and Drainage Plans &,; CALCULATE FEES DUE ARC Fee oL$ 300 $ 3s00 vyN Buildef e Coopletiou Depoeit Mioimum Plus $1.00 per square foot enclosed space over 1200 feet s Total Due $ Sectiotr IV. Review the fotlowing checklist to assist you in preparing your plans for rhe ARC s preliminary revieu/. BUILDING PLAN ! IJo o Ul. On a or , o2o121,q; s Aii z) ili T} t,l ll Toc (n o ooz ttll co o7 m(l) U m 1r)o! :]oZ tl v 1Zo- U rll irt a !,P6l{'|l-q ! o o U. o o iil ( TP+jt'l 'IITSi,d9d,.. 9XSr9 l 1 ir fi*F iSr'1 $$),lri q,'"6 !;tiis( if; 13B -r ?u [i'; *14iIl$'..8 1; d S slgfrSti'jlrB [4 i j[fiia f,4 a ). U) lrl Dm tIoZ ;"""' "' Eh*l!.i:( 6TrrilFdd2iIr;6X;;::ziti;i','i;; ,ei",!6 ; 06 orq !Z 0oU t,Z!. a UI nAsilfi6 i lt6i1n,. rrill dSi\HhP ir,fr*ii1! irSpEBl :rRRi frfri!* rx!dqj\i.(q96') i'"S! i, ( o iai, il ll ., ootloZ l n r.'I o,'!1. BRAD + CINDY SKINNER RESIDENCE it @20 ROAN CRTEKDRIVI GARFI€LD COUNTY, CO . :i. :, : i IJ rl 1il i a 't D oo,_oo=,r o1!n]inupfj:o roI oon-) .- -- <,i f m ii, i{ 5'l crn; FBI].6d motr o U] En oZ i--r+tl: .!q!i;; --*-a---1--t- t! - L -H BATTLEMENT CREE( TRAILoi I BRAD + CINDY SKINNER RESIDENCE!;20 ROAN CRTEK DR,IVE CARTIETO COUNTY, CO E@ ,lt I I j I Il 1 l 'i" I l:I /N ;{. I i :iisi{[iiiiiliiiirliriiiii'i;ir::ri;, iiiiiijil ii iilliiiii i; rul, ii tii,: i'l i; i;y iii ii' , i J doo T- Z t{o z (r) C I.IoZ $)Cff (: ; t. .I(hrozDTrD!p rt{oC ,? il i d V I J V (r,tI o :ij N)| -"= = E= ,*" ." a^or ro"",* *EsrDENcE lE=Sg 20 RoAN cRrth DRIVE I I- G,\RfIELD COUNT} CO -1, l (rrD :,] il i rT-l I l;- @ : : I z Uo a UooN U) I o i. l ti ll J V 5ioz7JroI!IE r!t1{m P616 Z T 9- =-t ;F ERAD + CINDY SKINNER RESIDENCE r-- l I I -r l i =- l l { I I F'=1 ll - @@ 20 ROAN CRITK DRIVE GARFIELO COUNTY. CO 5 l-l ]l 1ll 'l t l t li n 1.1- -1 { @ F ," | "'' I .J t, - i@ t,i iI $ n'1 t \ BRAD + CINDY SKINNER RESIDENCE!I - I I rIIIII III 20 ROAN CRIEKDRIVE CARFIETD COUNTY CO t-l B E F t1 E H-Tf- I l -, f +L .{ E 5 'l atl I I z4\k'>,\:Z :l E .? i 'RAD + ct\D) shtNNER RtstDt\ct:^': @l5 c\RFltlo aou\n co t.I f )!i ) I ,] ,l i I E !:, i. ::- E E E E E 6t E E E k E E E a E E t EE FE FE EE EF E e k H @ E E E Fe .; El"^t-;E " tl ! 'rE j I.t ii I F Ii;:E I '*O * CINDY 5KINNER RE5IDENCE . l!:;: I )0 ROAN CRITK ORIIE I I O ;=-E ' cARJ 'ELD couNn. co I I 'll I i I rrfllt l l1 I I lnl.l BRAD + CINDY SKINNER RESIDENCE 2O ROAN DRIVE ]TIIII - CARFITTD COUNry CO lEl@ -t I I" E .E3 t-:E Et ==-:/ = i :r . r =LIIt 1-, / ! \ rT l i =l + ERAD + CINDY SKINNER RE5IDENCE + Ftt a Iqlt ; I T EoE -tl I 20 ROAN CREEK DRIV€ GARTIELD COUNTY, CO E@ tl I I i.lll t ;= 5 ! _I Ej1E (o N \-Y: -- - : = /I= {b4 3t tL cF Lr-0{--L s Features and S ecificationsa Mobile Home --,mer Placement Flush or Recessed Face Raised or Floor Placemenl . lnternal or External Chase. Horizontal or Vertical Vent. Bedroom Approved Heating S'pecifications Approximate Heating Capacity (in square feet)' Maximum BTU lnput Per Hour " Heating capacity will vary with floor plan, ins ulation, and outside temperature.*' Efficiency rating is a product thermal efliciency rating determined under continuous operation independent of installed system. Dimensions Top Venl Confiqulalion 8'(203mm)O Venl Optional "Coolsmarl TV' or 'Power Heal Ducl' Conneclion 7-1t4' 184mm 38-1/4' 972mn 205 Lbs. (93 Kg) T-3t4" Natural Gas 45 Propane 450 to 1 ,400 31,000 2+71A" 658mm 39-114', 997mm Th€ bottom of the face 1/8' (4mm) above the baseplale. Sqar venl Confiquration 44-3t4', 1137mm 8" (203m'r)o Vent \au".pt'r" 22 42-3t4" 1086mm 559mm ' See "Clearances" and "Framrng Dimens{ons' for details. 31,000 3t' 5 5/6' 30.75" 781mm O Travis lndustries 4t12t2023 - 1483 864 31K CF lnstall .tt I 2a-5/8" 728mm' "f H B E E , __-<_.:--_--/"v ,1' '. : E--------- I, a s-- -,+ \. l \-l ---a j \ !'a tta-!} :El a a \ , --'t6l a I I -l o f - -:ALE -1-'t_+' BATTTEf,ENT CRE€K TRAII ,i lrl ltl d BRAD + CINDY SKINNER RESTDENCE 'qd9 1i( s<E $q$ 6rn KEg FP9-9$:8 8q i. O: $dkioraP Rx I l) B * I T T st 8 1 i fli3: ci 9 t t( ?{!q B!liri'tid ;1 ts" E :; ! 1l l! ,. EBt; E EE85rr !: ii!f -----i { E n )" a B -+--..+--!....---t-: g Uafl E I'l t;20 ROAN CRIII( DRT![tiifiiEl@ I I I - -l \ I I i I I I ----'" )':,- &;A.TTLEMENT MESA Service AssociationYiiryYr COMITIONS OF APPROVAI or DISAPPROVAL 1. No sitework or building construction may proceed on any Lot (iacluding no preliminary site clearing, grubbiog, grade alteration, storing of material, foundation excavation, extension of underground utilities, etc.) until the Project has received a Project approval fiom the Architectural Committee and has been issued a building permit (as required by Garfield county [or new home or Renovation projecrs). 2. AII general building, site improvements, landscaping and revegation to specifically include the front, side and rear yard areas for any Project shall be completed and shall have passed a Final Compliance Inspection no later than eighteen (18) months after Project approval by the Architecrural Committee. h is the responsibility ofthe owner or builder to furnish the Architectural Committee a copy of the Cenificate of Occupancy within one (1) week of issuance of the Cenificate of Occupancy. 3. If the selections of colors and/or landscaping plans are not included with this application they must be submitted for approval before any action is taken to install the missing items. 4 5 6 Application Appror-al cooclitioos: By Chairman:Darc: //- (.-24 Application Denied (lnitials of Architechrral Committee Members) Bv, Applicatioa Deaied for reason(s) stated above: By Chairman:Date: ltir portior, of ttre Application Fom ir m be coupleted by the Ar-hitectursl CoDuitree (uot the Ap,plicalt) By,cp;a4 M zl