Loading...
HomeMy WebLinkAboutEngineer Framing Letter Permit 11.17.24 James Jackson Romeo, PE Framing Inspection Structural Design Consultant, LLC 246 Pinon Drive Glenwood Springs, CO 81601 Phone: 970-945-4742 Email: jim@jjrstructural.com November 17, 2024 Luis Bailon 4063 County Road 37 Brighton, CO 80603 RE: Bailon Residence, 186 Maroon Drive, GWS on Lot 43 Four Mile Ranch Subdivision, Garfield County Luis: At the request of the Garfield County Building Department Inspectors, you asked me to document and approve the deck corner framing at Grid E/18. At this corner, the Permit Set shows that the joist at the deck edge on Grid E was meant to cantilever over the deck beam to the corner, but instead was framed discontinuous due to the top of column detail used to support the deck beam on Grid E/17. This means that the second deck joist to the deck edge is the joist closest to the deck corner that cantilevers over the beam and connected to the 2x10 fascia that cantilevers past the second joist to support the deck corner. I recommend adding an LUS28 hanger to the end of the second deck joist to the 2x10 fascia. Since the handrail post at the deck corner on Grid E/18 is additionally braced by the handrail extending from the corner to the exterior wall on Grid 15, no additional handrail framing is required. If there aren’t any questions, please send a pic of the LUS28 hanger after it is installed and before you have the County inspect. Thanks James J. Romeo PE