HomeMy WebLinkAboutSubsoils Report for Foundation DesignHuddleston-Berry
Engineering & Testing, LLC
2789 Riverside Parkway
Grand Junction, Colorado 81501
Phone: 970-255-8005
Info@huddlestonberry.com
June 7,2024
Project#02850-0001
Joe Reider
1620 County Road 21
Brighton, Colorado 80603
Subject: Geotechnical Investigation
Parcel 24072300004
Parachute, Colorado
Dear Mr. Reider,
This letter presents the results of a geotechnical investigation conducted by Huddleston-Berry
Engineering & Testing,LLQ (HBET) at Parcel 24072300004 in Parachute, Colorado. The site
location is shown on Figure 1. The proposed construction is anticipated to consist of a new
single-family residOnce. The scope of our investigation included evaluating the subsurface
conditions at the site to aid in developing foundation recommendations for the proposed
construction.
Site Conditions
At the time of the investigation, the investigated area was open. The northwest portion of the site
was fairly flat, and vegetation primarily consisted of grasses and weeds. The center and southeast
portions of the site contained moderate to steep slopes down to the adjacent canyon, and
vegetation consisted of grasses, weeds, and trees. The site was bordered to the north by a vacant
lot and a rural residential property, to the west and south by rural residential properties, and to
the east by Federal Land.
:l)
Subsurface Investisation
The subsurface investigation included two borings and two test pits as shown on Figure 2 - Site
Plan. The borings were drilled to a depth of 20.0, and the test pits were excavated to a depth of
6.0 feet below the existing ground surface. Typed boring and test pit logs are included in
Appendix A.
As indicated on the logs, the subsurface conditions encountered at the site were fairly consistent.
The borings and test pits encountered 1.0 foot of topsoil above reddish-tan to brown, moist, soft
to very stiff lean clay with sand soils that extended to a depth of 12.0 feet in the borings and to
the bottoms of the test pit excavations. The clay soils in the borings were underlain by brown to
gray and tan, moist, dense silty sand with gravel soils that extended to the bottoms of the borings.
{e
\\
-\)
\
.\
\
\
Groundwater was not encountered in the subsurface at the time of the investi
Parcel 240702300004
#02850-000 I
06/07t24
Laboratorv Testing
Huddleston-Berry
Laboratory testing was conducted on samples of the native soils encountered in the borings. The
testing included grain size analysis, Atterberg limits determination, natural moisture content
determination, and maximum dry density and optimum moisture content (Proctor) determination.
The laboratory testing results are included in Appendix B.
The laboratory testing results indicated that the native clay and sand soils are moderately plastic.
In general, based upon the Atterberg limits and our experience with similar soils in the vicinity
of the subject site, the native clay soils are anticipated to be slightly expansive.
Foundation mendafions
Based upon the results of the subsurface investigation and nature of the proposed construction,
shallow foundations are recommended. Spread footings and monolithic (tumdown) structural
slabs are both appropriate foundation alternatives. However, as discussed previously, the native
soils are anticipated to be slightly expansive. Therefore, in order to provide a stable bearing
stratum and limit the potential for excessive differential movements, it is recommended that the
foundations be constructed above a minimum of 24-inches of structural fill.
Due to their plasticity, the native soils are not suitable for reuse as structural fill. Imported
structural fi1l should consist of a granular, non-expansive, non-free draining material with
greater than I0o/o passing the #200 sieve and Liquid Limit of less than 30. However, all
proposed imported structural fill materials should be approved by HBET.
For spread footing foundations, the footing areas may be trenched. However, for monolithic slab
foundations, the structural fill should extend across the entire building pad area to a depth of 24-
inches below the turndown edges. Structural fill should extend laterally beyond the edges of the
foundation a distance equal to the thickness of structural fill.
Prior to placement of structural fill, it is recommended that the bottoms of the foundation
excavations be scarified to a depth of 6 to S-inches, moisture conditioned, and re-compacted to a
minimum of 95o/o of the standard Proctor maximum dry density, within t2o/o of the optimum
moisture content as determined in accordance with ASTM D698. However, as discussed
previously, soft soils were encountered in portions of the subsurface and this may make
compaction of the subgrade difficult. It may be necessary to utilize geotextile andlor geogrid in
conjunction with up to 30-inches of additional granular fill to stabilize the subgrade. HBET
should be contacted to provide specific recommendations for subgrade stabilization depending
upon the actual conditions encountered during construction.
Structural fill should be moisture conditioned, placed in maximum S-inch loose lifts, and
compacted to a minimum of 95Yo of the standard Proctor maximum dry density for fine grained
soils or modified Proctor maximum dry density for coarse grained soils, within +2Yo of the
optimum moisfure content as determined in accordance with ASTM D698 or D1557C,
respectively. Structural fill should be extended to within 0.l-feet of the bottom of the
Encirc.rins& T.{ntg, I-LC
edge as a leveling course
22:\2008 ALL PROJECTS\02850 - Joe Reider\02850-0001 Parcel 240702300004\200 - Geo\02850-0001 LR060724.doc
Parcel 240702300004
#02850-000 I
06/07 /24
Huddleston-Berry
Ergft!c.rinE& T.rrin8, LLC
For structural fill consisting of approved imported granular materials and foundation building
pad preparation as recommended, a maximum allowable bearing capacity of 1,500 psf may be
used. In addition, a modulus of 200 pci may be used for approved imported structural fill
materials. Foundations subject to frost should be at least 36-inches below the finished grade.
Any stemwalls or retaining walls should be designed to resist lateral earth pressures. For backfill
consisting of the native soils or imported granular, non-free draining, non-expansive material, we
recommend that the walls be designed for an active equivalent fluid unit weight of 55 pcf in
areas where no surcharge loads are present. An at-rest equivalent fluid unit weight of 75 pcf is
recommended for braced walls. Lateral earth pressures should be increased as necessary to
reflect any surcharge loading behind the walls.
Water soluble sulfates are common to the soils in Western Colorado. Therefore, at a minimum,
cement adequate for Sulfate Exposure Class S1 is recommended for construction at this site.
Non-Structural Floor Slab and Exterior Flatwork Recommendations
In order to reduce the potential for excessive differential movements, it is recommended that
non-structural floating floor slabs be constructed above a minimum of 24-inches of strucfural fill
with subgrade preparation, structural filI materials, and filI placement be in accordance with the
Foundation Recommendations section of this report. It is recommended that exterior flatwork be
constructed above a minimum of l2-inches of structural fill.
Drainage Recommendations
Gradins and drainase are critical for the lons-term performance of the structure and grading
around the structure should be designed to carry precipitation and runoff away from the
structure. It is recommended that the finished ground surface drop at least twelve inches within
the first ten feet away from the structure. It is also recommended that landscaping within five
feet of the structure include primarily desert plants with low water requirements. In addition, it
is recommended that ircigation, including drip lines, within ten feet of foundations be minimized.
HBET recommends that downspout extensions be used which discharge a minimum of 15 feet
from the structure or beyond the backfill zone, whichever is greater. However, if subsurface
downspout drains are utilized, they should be carefully constructed of solid-wall PVC and should
daylight a minimum of 15 feet from the structure. In addition, an impermeable membrane is
recommended below subsurface downspout drain lines. Dry wells should not be used.
In order to limit the potential for surface moisture to adversely impact the structure, a perimeter
foundation drain is recommended. In general, the perimeter foundation drain should consist of
prefabricated drain materials or a perforated pipe and gravel system with the flowline of the
drain at the bottom of the foundation (at the highest point). The prefabricated drain materials or
gravel should extend along basement walls to within 36-inches of the finished grade. The
perimeter drain should slope at a minimum of l.\Yo to daylight or to a sump with pump. The
drain should also include an impermeable membrane at the base to limit the potential for
JZ:\2008 ALL PROJECTS\02850 - Joe Reider\02850-0001 Parcel 240102300004\200 - Geo\02850-0001 LR060724.doc
Parcel 240702300004
#02850-000 I
06107124
General Notes
Huddleston-Berry
The recommendations included above are based upon the results of the subsurface investigation
and on our local experience. These conclusions and recommendations are valid only for the
proposed construction.
As discussed previously, the subsurface conditions encountered at the site were fairly consistent.
However, the precise nature and extent of any subsurface variability may not become evident
until construction. As a result, it is recommended that HBET provide construction materials
testing and engineering oversight during the entire construction process. In addition, the builder
and any subcontractors working on the project should be provided a copy of this report and
informed of the issues associated with the presence of moisture sensitive subgrade materials at
this site.
It is imnortant to note that the herein are intended to the risk of
structural movement and/or damage, to varving degrees. associated with volume change of the
native soils.owever.HBET cannot lons-term chanses in su moisture
Ensinc.ring& T.iIftrg, t-LC
conditions and/or the nrecise masnitude or extent of volume se in the native soils.lV'here
or the result of actions of the propertv owner, severul inches of movement are nossible. In
addition. snv failure to complv with the recommendations in this report relesses Huddleston-
Beruv Ensineering & Testing, LLC of unv liabilitv with regard to the structure performance.
We are pleased to be of service to your project. Please contact us if you have any questions or
comments regarding the contents of this report.
Respectfully Submitted:
Huddleston-Berry Engineering and Testing, LLC
Michael A. Berry, P.E.
Vice President of Engineering
3 010
7/24
4Z:\2008 ALL PROJECTS\02850 - Joe Reider\02850-0001 Parcel 240702300004\200 - Geo\02850-0001 LR060724.doc
FIGURES
GD qPublic.Jt{8t""' Ga rfi eld Cou nty, CO
t,f
a
?l{.
13
.t
4;'*I
'!,
Date created: 5/ 1,6/2024
Last Data U ploaded: 5 / 76/2024 2:I7 :IO Alvt
FIGURE 1
Site Location Map
Developed b'()P=clgP;ggg
€)qPublic.net"' Garfreld Cou nty, Co
"}?ar *:
a
t
I
ft
FIGURE 2
Site PlanDate created: 5/16/2024
Last Data Uploaded: 5/16/20242:I7:IO Alvt
Devel
ryp ed Borin g #I'iilr?tfr $
N
N
@
Fo
di
!al
Fz
o
ooo
Notso
N)Uou
I
az
lJoo
I6
IouFoUo
Huddleston-Beny Engineering & Testing, LLC
2789 Riverside Parkway
Grand Junction, CO 81501
970-255-8005
BORING NUMBER B-1
PAGE 1 OF 1
PROJECT NAME Parcel 240702300004
PROJECT LOCATION Parachute, COPROJECT NUMBER 028s0-0001
CLIENT .loe Reider
GROUND WATER LEVELS:
AT TIME OF DRILLING
AT END OF DRILLING
AFTER DRILLING ---
Simco 2000 Truck Rio DTV
Drv
HOLE SIZE 4-lnch
CHECKED BY MAB
NOTES
COMPLETED 5I2OI24 GROUND ELEVATIONDATE STARTEO 5I2OI24
DRILLING CONTRACTOR S. McKracken
DRILLING METHOD
LOGGED BY TC
ATTERBERG
LIMITS
o
-LFL9>fl
o_
-
0tFr16=1'(L
Fzul
F.zOGo9l
@t!ztr
LJJ
rL>tF I.JJ
sg0-:|>z
a
s
t-
9Eg5
ult
au>Fl
^z)Y:(do>oz
z
LJJ
rL
u.t .9
oo0-
F
=L
z9l-=
to
LLI O\t:-
fD !!
Oz>o
C)
oF_
a=
J-
0
ILo-E
o
C)
+E
o
MATERIAL DESCRIPTION
('r 89 7-8-9
(17)
\/ .,
A2 100 6-1 1-15
(26)
27 3 40
[:'
100 15-16-22
(38)21 30
1
o. 1.\
Silty Sand with Organics (TOPSOIL)
Lean CLAY with Sand (cl), reddish-tan, moist, very stiff
Silty SAND (SM) with Gravel, tan, moist, dense
SS-3: Lab Classified
A
[';
13 30
20
Bottom of hole at 20.0 feet.
Foq
m)
al
Fz
o
I
oooo
NoN
N
JUot
o
I
m
Huddleston-Berry Engineering & Testing, LLC
2789 Riverside Parkway
Grand Junction, CO 81501
970-255-8005
PROJECT NAME Parcel 240702300004
PROJECTNUMBER O2B5O-OOO1 PROJECT LOCATION Parachute, CO
CLIENT Joe Reider
BORING NUMBER B.2
PAGE 1 OF 1
GROUND WATER LEVELS:
AT TIME OF DRILLING
AT END OF DRILLING
AFTER DRILLING -.
DrySimco 2000 Truck Riq
DTV
HOLE SIZE 4-lnch
CHECKED BY MAB
GROUND ELEVATION
NOTES
COMPLETED 5I2OI24DATE STARTED 5I2OI24
DRILL]NG CONTRACTOR S. McKracken
DRILLING METHOD
LOGGED BY TC
ATTERBERG
LIMITS
Fail
69<=J(L
Fz
UJFzOGoe)a
IJJztr
IFo-ulo
O
I rno-X<Yt-(,
MATERIAL DESCRIPTION
UJ
rL>tF I.IJ
3g0-f>z
@
s
t-
9Eov.(J-
LIJt
au>Fl
^ZrY={6o>OZ
z
LIJ
o_
i!.C
Oo(L
F
=Lz9f-=
to
:;
LLI O\t-
L1
tD Fr
Oz>oO
oF
a=)-
C)
FL(,s<=JJ
o_
\/"
Al 1
67 3-1-2
(3)
\/ ..
A2 39 8-30
{:'
50 30-20
].. ..
):
;r:0
,.: r l.:
;o.;..
r,O.
Silty Sand with Organics (TOPSOIL)
reddishtan to brown, moist, soft to very
Silty SAND with Gravel (sm), brown to gray and tan, moist, dense
stiff
Lean CLAY with Sand (
I
Vl tt
Al.
46 25-50
20
o. l l
.o: ...'
,..O
Bottom of hole at 20.0 feet.
Huddleston-Berry Engineering & Testing, LLC
2789 Riverside Parkway
Grand Junction, CO 81501
970-255-8005
TEST PIT NUMBER TP-1
PAGE 1 OF 1
PROJECT NUMBER 02850-OOO1
PROJECT NAME Parcel 240702300004
PROJECT LOCATION Parachute, CO
CLIENT .ioe Reicler
GROUND WATER LEVELS:
AT TIME OF EXCAVATION
AT END OF EXCAVATION
AFTER EXCAVATION ---
TEST PIT SIZE
CHECKED BY MAB
Drv
Drv
EXCAVATION METHOD Trackh/Backhoe
GROUND ELEVATION
EXCAVATION CONTRACTOR Wiseland
LOGGEDBY TC
NOTES
DATE STARTED 5I2OI24 COMPLETED 5I2OI24
ATTERBERG
LIMITSTU(L>tFUI
sgO-l>z
U)
s
t-
xp5-
LU
x.
aG>F-l
^z)Y:{do>OZ
zt!
0-
FCirg
Oo
o_
F
=L
705g
to
LU o-tr-
-r'aV
Oz>o
C)
oF
a=
=J
C)trF
3=(L
F0t
6e<=
-J
o_
FzulFzOG
a
UJztr
I
L
o
O
+Eil-o
MATERIAL DESCRIPTION
J/2,!
i11
tlq.j
'). {t;: . :.-.
v. .t
Silty Sand with Organics (TOPSOIL)
(MC
1
78 11
25
Lean CLAY with Sand (cl), reddishtan, moist, medium stiff to stiff
Bottom of test pit at 6.0 feet.
N
N
@
Foqo
J
al
Fz
c
oooo
NoF
N
JU
d
c
oz
fJoo-6
N
F
@
Fo
diIol
Fz(,
I
oooo
NoNo
N
J
Lll
(-)e
I
(i)z
Id
Huddleston-Berry Engineering & Testing, LLC
2789 Riverside Parkway
Grand Junction, CO 81501
970-255-8005
TEST PIT NUMBER TP-2
PAGE 1 OF 1
PROJECT NAME Parcel 240702300004
PROJECT NUMBER O2B5O-OOO1 PROJECT LOCATION Parachute, CO
CLIENT Joe Reider
COMPLETED 5I2OI24 TEST PIT SIZEDATE STARTED 5I2OI24
EXCAVATION CONTRACTOR Wiseland
CHECKED BY MAB
EXCAVATION METHOD Trackh/Backhoe
GROUND ELEVATION
LOGGED BY TC
NOTES AFTER EXCAVATION -.-
AT END OF EXCAVATION Drv
GROUND WATER LEVELS:
AT TIME OF EXCAVATION Dry
ATTERBERG
LIMITS
Fat
4zJ(L
Fz
LIJFzOG
a
I.JJztr
TJJ
o->tFtll
sg0-l>z
U)
s
t-s6gv
ult
aw
=FlAZJYr<do>oz
zul(L
irJ .9
oo(L
F
=
20
=eto
Lil o-t-lr-Lz,AP
-FOz>oo
o,
f=
)'
OtrF
3=
00
I
L€.
o
C)
+E
(,
MATERIAL DESCRIPTION
{'' !
tj!
rt?. !
Ii' \\ I)I .il-.:Vj
Silty Sand with Organics (TOPSOIL)
Lean CLAY with Sand (cl), reddish-tan, moist, medium stiff to stiff
Bottom of test pit at 6.0 feet.
APPENDIX B
Laboratory Testing Results
N
F
@
Foq
m
Jol
Fz
o
o_q
aooo
NoNo
N
ooooo
@No
UNaz
to
Huddleston-Berry Engineering & Testing, LLC
2789 Riverside Parkway
Grand Junction, CO 81501
970-255-8005
GRAIN SIZE DISTRIBUTION
PROJECT NAME Parcel 240702300004
PROJECT NUMBER O2B5O-OOO1 PROJECT LOCATION Par:e hr rtc co
CLIENT Joe Reider
U,S. SIEVE OPENING IN INCHES6 4 3 21.5 1314 112
U.S. SIEVE NUMBERS I
100 1 40 200
HYDROMETER
J 14
FIo
LIJ
=mt
TJJztr
Fz
Ul
Ot
uJL
100
95
90
B5
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
100 10 1
GRAIN SIZE IN MILLIMETERS
0.1 0.01 0.001
" tT I I I
(
\
q \
1'
\
\
COBBLES GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine
CuClassificationLLPLPICcSpecimen ldentification
stLTY SAND(SM)30 27 3oB-1, SS-3 5t20
LEAN CLAYwith SAND(CL)32 18 14xcoMPostrE 5120
Specimen ldentification D100 D60 D30 D10 %Gravel %Sand %silt
a B-1, SS-3 5120 9.5 0.301 6.0 s4.0 40.0
coMPoslTE st20 2.36 0.0 28.8 71.2tr
Huddleston-Berry Engineering & Testing, LLC
2789 Riverside Parkway
Grand Junction, CO 8 I 501
970-255-8005
ATTERBERG LIMITS' RESULTS
PROJECT NAME Parcel 240702300004
PROJECT NUMBER 02850-OOO1 PROJECT LOCATION Parachute. CO
CLIENT Joe Reider
P
L
A
S
T
I
c
I
T
I
N
D
E
X
50
40
30
20
10
CL-ML @
0
0 20 40
LIQUID LIMIT
Specimen ldentification LL PL PI #200 Classification
3 40 srLTY SAND(SM)O B-1, ss-3 5t20 30 27
32 18 14 71 LEAN CLAYwith SAND(CL)x COMPOSITE 5t20
N
ts
@
Foo
diIof
Fz
o
q
oooo
NoNo
N
JUot
d
aF
:
tUduUFF
Huddleston-Berry Engineering & Testing, LLC
2789 Riverside Parkway
Grand Junction, CO 81501
970-255-8005
MOISTU RE.DENSITY RELATIONSHI P
PROJECT NAME Parcel 240702300004
PROJECT LOCATION Parachute, COPROJECT NUMBER O2B5O-OOO1
CLIENT Joe Reider
lCU
145
140
135
130
125
oo.tF
U)z
uJo
to
120
115
110
105
100
Sample Date:
Sample No.:
Source of Material:
Description of Material:
5t20t2024
31
GOMPOSITE
LEAN CLAYwith SAND(CL)
Test Method (manual)ASTM D698A
TEST RESULTS
Maximum Dry Density 100'5 PCF
Optimum Water Content 20'0 o/o
GRADATION RESULTS (% PASSING)
#200 #4 314"
71 100 100
ATTERBERG LIMITS
LL PL PI
32 18 14
Curves of 100% Saturation
for Specific Gravity Equal to
2.80
2.70
2.60
2510
90
20 300515
WATER CONTENT, %
N
F
@
Fo
di
J
af
Fz
Iq
oao
NoNo
N
oe
o
No
zo
trO
I
oo