Loading...
HomeMy WebLinkAboutConditions of PermitcoN DITIONS OF PERMIT BLRE-10-24-8950 KEVIN & RHONDA COLEMAN 494 SO FT Accessory Dwelling Unit (ADU) (on crawl space wilh 629 sq ft covered deck) 101 Monument Ridge Rd, Parachute Monument Ridge Sub., Lot 10 1) ALL WORK SHALL COMPLY WITH THE 2015 INTERNATIONAL RESIDENTIAL CODE (I.R.C.) AND 2O1B INTERNATIONAL ENERGY CONSERVATION CODE (I.E.C.C.) 2) PROPOSED TMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED lN THE ATTACHED "GARFIELD COU NTY BUI LDI NG REOUIREMENTS". NU MBER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) ELECTRTCAL PERMtTTtNG AND TNSPECTTONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. 4) ALL EXTERIOR LIGHTING TO BE DOWNCAST AND SHIELDED. S) WILDFIRE MITIGATION RECOMMENDATIONS: SHALL COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE RECOMMENDATIONS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COMMUNITY DEVELOPM ENT WEBSITE FOR ADDITIONAL I NFORMATION. o) opEN HOLE SOTLS REPORT tS REOUTRED AT FOOTTNG INSPECTION AND PRIOR TO ANY CONCRETE POUR. PROVIDE COPY OF GEOTECHNICAL ENGINEERS REPORT TO THE BUILDING INSPECTOR. 1,500 PSF AS SPECIFIED BY THE GEOTECH. 7) SEPTIC SYSTEM REVIEW / APPROVALS: PRIOR TO FINAL BUILDING INSPECTION & CERTI FICATE OF OCCU PANCY PROVI DE FI NAL APPROVAL /SIG N-OFF FROM GARFI ELD COUNry'S PUBLIC HEALTH DEPT. B) GENERAL CONTRACTOR / PROPERTY OWNER TO REFERENCE ALL PLAT NOTES AND CONDITIONS AS SHOWN IN THE ATTACHED PLAT AND GARFIELD COUNTY BOCC RESO LUTI O N #2024-32 PARCE L 2407 202260 1 0. 9) ON NOVEMBER 26, 2024 F|RE D|STRTCT GRANTED VERBAL APPROVAL FOR AN EXISTING SOURCE OF ON-SITE WATER STORAGE FOR FIRE SUPPRESSION PURPOSES - OKAY TO RELEASE BUILDING PERMIT. SIGNED LETTER FROM FIRE MARSHAL TO FOLLOW FOR FILE RECORD. 10) BLOWER DOOR TEST tS REOU|RED. MUST SUBMIT BLOWER DOOR TEST REPORT TO GARFIELD COUNry COMMUNIry DEVELOPMENT DEPT. OFFICE PRIOR TO SCHEDULING FINAL BUILDING INSPECTION / C.O. FINAL. PRESCRIPTIVE PATH WITH RESCHECK REPORT AND LOOP CAD 2023 MANUAL J REPORT IS CHOSEN FOR ENERGY COMPLIANCE OF THIS H E. ALL HOUSE MECHANICAL VENTILATION SYSTEM INSTALLED (2015 IRC TABLE m1507.3.3(1) AND (2) AS STAMPED ON SHEET A-101) 11