HomeMy WebLinkAboutObservation of ExcavationGeneral Information
Activity Number:1 Activity Date:09/05/2023
Site Observations
Contractors Equipment:Walkbehind vibratory sheepsfoot roller
Construction Observation and Communication:
We visited the site today to perform compaction testing on the footing structural fill. The material we tested was compacted using a walkbehind vibratory sheepsfoot roller. Our
test results are provided in our compaction report dated 9/5/23.
Technician:Sam Emerson Reviewed By:Steven L. Pawlak P.E.
Construction
Observation
Glenwood Springs
5020 County Road 154
Glenwood Springs, CO 81601
Phone: 9709457988
Client:
Uriel Mellin
144 Cliffrose Way
Glenwood Springs, CO 81611
Project:
237414.A
Lot 43, Pinyon Mesa
84 Cliff Rose Way
Glenwood Springs, CO 81601
The testing report shall not be reproduced, except in full, without the written approval of Kumar and Associates, Inc.Page 1 of 2Page 1 of 1
General Information
Activity Number:2 Activity Date:09/06/2023
Site Observations
Contractors Equipment:Walkbehind vibratory sheepsfoot roller
Construction Observation and Communication:
We visited the site today to perform compaction testing on the footing structural fill. The material we tested was compacted using a walkbehind vibratory sheepsfoot roller. Our
test results are provided in our compaction report dates 9/6/23.
Technician:Sam Emerson Reviewed By:Steven L. Pawlak P.E.
Construction
Observation
Glenwood Springs
5020 County Road 154
Glenwood Springs, CO 81601
Phone: 9709457988
Client:
Uriel Mellin
144 Cliffrose Way
Glenwood Springs, CO 81611
Project:
237414.A
Lot 43, Pinyon Mesa
84 Cliff Rose Way
Glenwood Springs, CO 81601
The testing report shall not be reproduced, except in full, without the written approval of Kumar and Associates, Inc.Page 1 of 2Page 1 of 1
General Information
Activity Number:3 Activity Date:09/07/2023
Site Observations
Contractors Equipment:Walkbehind vibratory sheepsfoot roller
Construction Observation and Communication:
We visited the site today to perform compaction testing on the footing structural fill. The material we tested was compacted using a walkbehind vibratory sheepsfoot roller. Our
test results are provided in our compaction report dated 9/7/23.
Technician:Sam Emerson Reviewed By:Steven L. Pawlak P.E.
Construction
Observation
Glenwood Springs
5020 County Road 154
Glenwood Springs, CO 81601
Phone: 9709457988
Client:
Uriel Mellin
144 Cliffrose Way
Glenwood Springs, CO 81611
Project:
237414.A
Lot 43, Pinyon Mesa
84 Cliff Rose Way
Glenwood Springs, CO 81601
The testing report shall not be reproduced, except in full, without the written approval of Kumar and Associates, Inc.Page 1 of 2Page 1 of 1
General Information
Activity Number:4 Activity Date:09/11/2023
Site Observations
Contractors Equipment:Walkbehind vibratory sheepsfoot roller
Construction Observation and Communication:
We visited the site today to perform compaction testing on the footing structural fill. The material we tested was compacted using a walkbehind vibratory sheepsfoot roller. Our
test results are provided in our compaction report dated 9/11/23.
Technician:Sam Emerson Reviewed By:Steven L. Pawlak P.E.
Construction
Observation
Glenwood Springs
5020 County Road 154
Glenwood Springs, CO 81601
Phone: 9709457988
Client:
Uriel Mellin
144 Cliffrose Way
Glenwood Springs, CO 81611
Project:
237414.A
Lot 43, Pinyon Mesa
84 Cliff Rose Way
Glenwood Springs, CO 81601
The testing report shall not be reproduced, except in full, without the written approval of Kumar and Associates, Inc.Page 1 of 2Page 1 of 1
General Information
Activity Number:5 Activity Date:09/12/2023
Site Observations
Contractors Equipment:Walkbehind vibratory sheepsfoot roller
Construction Observation and Communication:
We visited the site today to perform compaction testing on the footing and interior column pad structural fill. The material we tested was compacted using a walkbehind
vibratory sheepsfoot roller. Our test results are provided in our compaction report dated 9/12/23.
Technician:Sam Emerson Reviewed By:Steven L. Pawlak P.E.
Construction
Observation
Glenwood Springs
5020 County Road 154
Glenwood Springs, CO 81601
Phone: 9709457988
Client:
Uriel Mellin
144 Cliffrose Way
Glenwood Springs, CO 81611
Project:
237414.A
Lot 43, Pinyon Mesa
84 Cliff Rose Way
Glenwood Springs, CO 81601
The testing report shall not be reproduced, except in full, without the written approval of Kumar and Associates, Inc.Page 1 of 2Page 1 of 1
Test Results
Test #
Retest
Of Test Date Proctor ID Method
Soil
Classification
Optimum
Moisture
(%)
Maximum
Dry Density
(pcf)
In Place
Moisture
(%)
In Place
Dry
Density
(pcf)
In Place
Wet
Density
(pcf)
Probe
Depth
(in)
Percent
Compaction
Min Comp.
(%)
Optimum
Moisture
Tolerance
(%)Remark
7 09/01/23 262-23 C (D698)SP-SM 7.7 134.2 4.6 124.0 129.7 6 92 98 -2 / 2 DF/MF
8 09/01/23 262-23 C (D698)SP-SM 7.7 134.2 6.9 134.0 143.2 6 100 98 -2 / 2 DP/MP
9 09/01/23 262-23 C (D698)SP-SM 7.7 134.2 7.5 130.0 139.8 6 97 98 -2 / 2 DF/MP
10 09/01/23 262-23 C (D698)SP-SM 7.7 134.2 4.5 125.0 130.6 6 93 98 -2 / 2 DF/MF
11 09/01/23 262-23 C (D698)SP-SM 7.7 134.2 3.6 127.3 131.9 6 95 98 -2 / 2 DF/MF
12 7 09/01/23 262-23 C (D698)SP-SM 7.7 134.2 9.0 132.7 144.6 6 99 98 -2 / 2 DP/MP
Test Information
Test #Test Location Elevation Reference
Gauge
Make / Model / SN / Calibrated Field Technician
7 Structural Fill: Footing Backfill: Footing on west side of site 2 feet below subgrade Troxler / 3440 / 23818 / 04/03/2023 Sam Emerson
8 Structural Fill: Footing Backfill: Footing on south side of site 2 feet below subgrade Troxler / 3440 / 23818 / 04/03/2023 Sam Emerson
9 Structural Fill: Footing Backfill: Footing in southeast corner of site 2 feet below subgrade Troxler / 3440 / 23818 / 04/03/2023 Sam Emerson
10 Structural Fill: Footing Backfill: Center of footing on east side of site 2 feet below subgrade Troxler / 3440 / 23818 / 04/03/2023 Sam Emerson
11 Structural Fill: Footing Backfill: Center of site 2 feet below subgrade Troxler / 3440 / 23818 / 04/03/2023 Sam Emerson
12 Structural Fill: Footing Backfill: Footing on west side of site 2 feet below subgrade Troxler / 3440 / 23818 / 04/03/2023 Sam Emerson
Remarks
DF/MF: Density Fail / Moisture Fail
DP/MP: Density Pass / Moisture Pass
DF/MP: Density Fail / Moisture Pass
Comments
Tests are "Direct Transmission" (Method A) unless probe depth is noted as
"Backscatter". Gauge calibration data on file with the testing agency.
This report presents opinions formed as a result of our observations of soil compaction. We have relied on the contractor to continue applying the recommended
compactive effort and moisture to the fill during times when our observer is not observing operations. Tests are made of the soils only as believed necessary to
calibrate our observer¶s judgement. Test data are not sole basis for opinions on whether the soils meets specifications. These test results only apply to the
samples which were tested. The testing report shall not only be reproduced, except in full, without the written approval of Kumar and Associates, Inc. Nuclear
gauge density testing performed in accordance with ASTM D6938.
Page 1 of 1
Soil Compaction Report
Test Method: ASTM D 6938
Client:
Uriel Mellin
Glenwood Springs, CO 81611
144 Cliffrose Way
Project:
Lot 43, Pinyon Mesa
23-7-414.A
Glenwood Springs, CO 81601
84 Cliff Rose Way
5020 County Road 154
Glenwood Springs, CO 81601
Phone: 970-945-7988
Glenwood Springs
Test Results
Test #
Retest
Of Test Date Proctor ID Method
Soil
Classification
Optimum
Moisture
(%)
Maximum
Dry Density
(pcf)
In Place
Moisture
(%)
In Place
Dry
Density
(pcf)
In Place
Wet
Density
(pcf)
Probe
Depth
(in)
Percent
Compaction
Min Comp.
(%)
Optimum
Moisture
Tolerance
(%)Remark
13 09/05/23 262-23 C (D698)SP-SM 7.7 134.2 6.3 129.2 137.3 6 96 98 -2 / 2 DF/MP
14 09/05/23 262-23 C (D698)SP-SM 7.7 134.2 4.7 135.6 142.0 6 101 98 -2 / 2 DP/MF
15 09/05/23 262-23 C (D698)SP-SM 7.7 134.2 5.7 131.1 138.6 6 98 98 -2 / 2 DP/MP
16 09/05/23 262-23 C (D698)SP-SM 7.7 134.2 6.2 127.1 135.0 6 95 98 -2 / 2 DF/MP
17 16 09/05/23 262-23 C (D698)SP-SM 7.7 134.2 5.0 134.9 141.6 6 101 98 -2 / 2 DP/MF
18 09/05/23 262-23 C (D698)SP-SM 7.7 134.2 4.3 126.6 132.0 6 94 98 -2 / 2 DF/MF
19 09/05/23 262-23 C (D698)SP-SM 7.7 134.2 6.8 126.5 135.1 6 94 98 -2 / 2 DF/MP
20 09/05/23 262-23 C (D698)SP-SM 7.7 134.2 9.4 127.4 139.4 6 95 98 -2 / 2 DF/MP
Test Information
Test #Test Location Elevation Reference
Gauge
Make / Model / SN / Calibrated Field Technician
13 Structural Fill: Footing Backfill: Footing in center of site Subgrade Troxler / 3440 / 23818 / 04/03/2023 Sam Emerson
14 Structural Fill: Footing Backfill: Footing on east side of site Subgrade Troxler / 3440 / 23818 / 04/03/2023 Sam Emerson
15 Structural Fill: Footing Backfill: Footing on west side of site Subgrade Troxler / 3440 / 23818 / 04/03/2023 Sam Emerson
16 Structural Fill: Footing Backfill: Footing on south side of site Subgrade Troxler / 3440 / 23818 / 04/03/2023 Sam Emerson
17 Structural Fill: Footing Backfill: Footing on south side of site Subgrade Troxler / 3440 / 23818 / 04/03/2023 Sam Emerson
18 Structural Fill: Footing Backfill: Footing on south corner of site Subgrade Troxler / 3440 / 23818 / 04/03/2023 Sam Emerson
19 Structural Fill: Footing Backfill: Footing on southeast corner of site Subgrade Troxler / 3440 / 23818 / 04/03/2023 Sam Emerson
20 Structural Fill: Footing Backfill: Footing on east side of site ¶below subgrade Troxler / 3440 / 23818 / 04/03/2023 Sam Emerson
Remarks
DF/MP: Density Fail / Moisture Pass
DP/MF: Density Pass / Moisture Fail
DP/MP: Density Pass / Moisture Pass
DF/MF: Density Fail / Moisture Fail
Comments
Tests are "Direct Transmission" (Method A) unless probe depth is noted as
"Backscatter". Gauge calibration data on file with the testing agency.
This report presents opinions formed as a result of our observations of soil compaction. We have relied on the contractor to continue applying the recommended
compactive effort and moisture to the fill during times when our observer is not observing operations. Tests are made of the soils only as believed necessary to
calibrate our observer¶s judgement. Test data are not sole basis for opinions on whether the soils meets specifications. These test results only apply to the
samples which were tested. The testing report shall not only be reproduced, except in full, without the written approval of Kumar and Associates, Inc. Nuclear
gauge density testing performed in accordance with ASTM D6938.
Page 1 of 2
Soil Compaction Report
Test Method: ASTM D 6938
Client:
Uriel Mellin
Glenwood Springs, CO 81611
144 Cliffrose Way
Project:
Lot 43, Pinyon Mesa
23-7-414.A
Glenwood Springs, CO 81601
84 Cliff Rose Way
5020 County Road 154
Glenwood Springs, CO 81601
Phone: 970-945-7988
Glenwood Springs
Test Results
Test #
Retest
Of Test Date Proctor ID Method
Soil
Classification
Optimum
Moisture
(%)
Maximum
Dry Density
(pcf)
In Place
Moisture
(%)
In Place
Dry
Density
(pcf)
In Place
Wet
Density
(pcf)
Probe
Depth
(in)
Percent
Compaction
Min Comp.
(%)
Optimum
Moisture
Tolerance
(%)Remark
21 13 09/05/23 262-23 C (D698)SP-SM 7.7 134.2 7.0 132.1 141.3 6 98 98 -2 / 2 DP/MP
Test Information
Test #Test Location Elevation Reference
Gauge
Make / Model / SN / Calibrated Field Technician
21 Structural Fill: Footing Backfill: Footing in center of site Subgrade Troxler / 3440 / 23818 / 04/03/2023 Sam Emerson
Remarks
DP/MP: Density Pass / Moisture Pass
Comments
Tests are "Direct Transmission" (Method A) unless probe depth is noted as
"Backscatter". Gauge calibration data on file with the testing agency.
This report presents opinions formed as a result of our observations of soil compaction. We have relied on the contractor to continue applying the recommended
compactive effort and moisture to the fill during times when our observer is not observing operations. Tests are made of the soils only as believed necessary to
calibrate our observer¶s judgement. Test data are not sole basis for opinions on whether the soils meets specifications. These test results only apply to the
samples which were tested. The testing report shall not only be reproduced, except in full, without the written approval of Kumar and Associates, Inc. Nuclear
gauge density testing performed in accordance with ASTM D6938.
Page 2 of 2
Soil Compaction Report
Test Method: ASTM D 6938
Client:
Uriel Mellin
Glenwood Springs, CO 81611
144 Cliffrose Way
Project:
Lot 43, Pinyon Mesa
23-7-414.A
Glenwood Springs, CO 81601
84 Cliff Rose Way
5020 County Road 154
Glenwood Springs, CO 81601
Phone: 970-945-7988
Glenwood Springs
Test Results
Test #
Retest
Of Test Date Proctor ID Method
Soil
Classification
Optimum
Moisture
(%)
Maximum
Dry Density
(pcf)
In Place
Moisture
(%)
In Place
Dry
Density
(pcf)
In Place
Wet
Density
(pcf)
Probe
Depth
(in)
Percent
Compaction
Min Comp.
(%)
Optimum
Moisture
Tolerance
(%)Remark
22 09/06/23 262-23 C (D698)SP-SM 7.7 134.2 5.9 124.0 131.3 6 92 98 -2 / 2 DF/MP
23 09/06/23 262-23 C (D698)SP-SM 7.7 134.2 7.7 123.8 133.3 6 92 98 -2 / 2 DF/MP
24 09/06/23 262-23 C (D698)SP-SM 7.7 134.2 10.6 122.6 135.6 6 91 98 -2 / 2 DF/MF
25 09/06/23 262-23 C (D698)SP-SM 7.7 134.2 7.7 124.6 134.2 6 93 98 -2 / 2 DF/MP
26 25 09/06/23 262-23 C (D698)SP-SM 7.7 134.2 5.9 133.0 140.8 6 99 98 -2 / 2 DP/MP
27 09/06/23 262-23 C (D698)SP-SM 7.7 134.2 4.9 129.0 135.3 6 96 98 -2 / 2 DF/MF
28 09/06/23 262-23 C (D698)SP-SM 7.7 134.2 8.3 128.5 139.2 6 96 98 -2 / 2 DF/MP
29 09/06/23 262-23 C (D698)SP-SM 7.7 134.2 5.9 130.9 138.6 6 98 98 -2 / 2 DP/MP
Test Information
Test #Test Location Elevation Reference
Gauge
Make / Model / SN / Calibrated Field Technician
22 Structural Fill: Footing Backfill: Southeast corner Subgrade Troxler / 3440 / 23818 / 04/03/2023 Sam Emerson
23 Structural Fill: Footing Backfill: Footing on east side Subgrade Troxler / 3440 / 23818 / 04/03/2023 Sam Emerson
24 Structural Fill: Footing Backfill: Footing in center of site ¶below subgrade Troxler / 3440 / 23818 / 04/03/2023 Sam Emerson
25 Structural Fill: Footing Backfill: Footing on east side of site Subgrade Troxler / 3440 / 23818 / 04/03/2023 Sam Emerson
26 Structural Fill: Footing Backfill: Footing on east side of site Subgrade Troxler / 3440 / 23818 / 04/03/2023 Sam Emerson
27 Structural Fill: Footing Backfill: Southeast corner of site Subgrade Troxler / 3440 / 23818 / 04/03/2023 Sam Emerson
28 Structural Fill: Footing Backfill: Footing in center of site ¶below subgrade Troxler / 3440 / 23818 / 04/03/2023 Sam Emerson
29 Structural Fill: Footing Backfill: Footing on west side of site Subgrade Troxler / 3440 / 23818 / 04/03/2023 Sam Emerson
Remarks
DF/MP: Density Fail / Moisture Pass
DF/MF: Density Fail / Moisture Fail
DP/MP: Density Pass / Moisture Pass
Comments
Tests are "Direct Transmission" (Method A) unless probe depth is noted as
"Backscatter". Gauge calibration data on file with the testing agency.
This report presents opinions formed as a result of our observations of soil compaction. We have relied on the contractor to continue applying the recommended
compactive effort and moisture to the fill during times when our observer is not observing operations. Tests are made of the soils only as believed necessary to
calibrate our observer¶s judgement. Test data are not sole basis for opinions on whether the soils meets specifications. These test results only apply to the
samples which were tested. The testing report shall not only be reproduced, except in full, without the written approval of Kumar and Associates, Inc. Nuclear
gauge density testing performed in accordance with ASTM D6938.
Page 1 of 1
Soil Compaction Report
Test Method: ASTM D 6938
Client:
Uriel Mellin
Glenwood Springs, CO 81611
144 Cliffrose Way
Project:
Lot 43, Pinyon Mesa
23-7-414.A
Glenwood Springs, CO 81601
84 Cliff Rose Way
5020 County Road 154
Glenwood Springs, CO 81601
Phone: 970-945-7988
Glenwood Springs
Test Results
Test #
Retest
Of Test Date Proctor ID Method
Soil
Classification
Optimum
Moisture
(%)
Maximum
Dry Density
(pcf)
In Place
Moisture
(%)
In Place
Dry
Density
(pcf)
In Place
Wet
Density
(pcf)
Probe
Depth
(in)
Percent
Compaction
Min Comp.
(%)
Optimum
Moisture
Tolerance
(%)Remark
30 09/07/23 262-23 C (D698)SP-SM 7.7 134.2 8.1 128.7 139.1 6 96 98 -2 / 2 DF/MP
31 09/07/23 262-23 C (D698)SP-SM 7.7 134.2 7.5 132.3 142.2 6 99 98 -2 / 2 DP/MP
32 09/07/23 262-23 C (D698)SP-SM 7.7 134.2 9.2 130.7 142.7 6 97 98 -2 / 2 DF/MP
33 09/07/23 262-23 C (D698)SP-SM 7.7 134.2 7.9 129.8 140.1 6 97 98 -2 / 2 DF/MP
Test Information
Test #Test Location Elevation Reference
Gauge
Make / Model / SN / Calibrated Field Technician
30 Structural Fill: North pad for crawl space Subgrade Troxler / 3440 / 23818 / 04/03/2023 Sam Emerson
31 Structural Fill: Center pad for crawl space Subgrade Troxler / 3440 / 23818 / 04/03/2023 Sam Emerson
32 Structural Fill: South pad for crawl space Subgrade Troxler / 3440 / 23818 / 04/03/2023 Sam Emerson
33 Structural Fill: Far south pad for crawl space Subgrade Troxler / 3440 / 23818 / 04/03/2023 Sam Emerson
Remarks
DF/MP: Density Fail / Moisture Pass
DP/MP: Density Pass / Moisture Pass
Comments
Tests are "Direct Transmission" (Method A) unless probe depth is noted as
"Backscatter". Gauge calibration data on file with the testing agency.
This report presents opinions formed as a result of our observations of soil compaction. We have relied on the contractor to continue applying the recommended
compactive effort and moisture to the fill during times when our observer is not observing operations. Tests are made of the soils only as believed necessary to
calibrate our observer¶s judgement. Test data are not sole basis for opinions on whether the soils meets specifications. These test results only apply to the
samples which were tested. The testing report shall not only be reproduced, except in full, without the written approval of Kumar and Associates, Inc. Nuclear
gauge density testing performed in accordance with ASTM D6938.
Page 1 of 1
Soil Compaction Report
Test Method: ASTM D 6938
Client:
Uriel Mellin
Glenwood Springs, CO 81611
144 Cliffrose Way
Project:
Lot 43, Pinyon Mesa
23-7-414.A
Glenwood Springs, CO 81601
84 Cliff Rose Way
5020 County Road 154
Glenwood Springs, CO 81601
Phone: 970-945-7988
Glenwood Springs
Test Results
Test #
Retest
Of Test Date Proctor ID Method
Soil
Classification
Optimum
Moisture
(%)
Maximum
Dry Density
(pcf)
In Place
Moisture
(%)
In Place
Dry
Density
(pcf)
In Place
Wet
Density
(pcf)
Probe
Depth
(in)
Percent
Compaction
Min Comp.
(%)
Optimum
Moisture
Tolerance
(%)Remark
34 09/11/23 262-23 C (D698)SP-SM 7.7 134.2 5.7 133.7 141.3 6 100 98 -2 / 2 DP/MP
35 09/11/23 262-23 C (D698)SP-SM 7.7 134.2 7.2 133.8 143.4 6 100 98 -2 / 2 DP/MP
36 09/11/23 262-23 C (D698)SP-SM 7.7 134.2 4.6 137.7 144.0 6 103 98 -2 / 2 DP/MF
37 09/11/23 262-23 C (D698)SP-SM 7.7 134.2 5.3 133.6 140.7 6 100 98 -2 / 2 DP/MF
38 09/11/23 262-23 C (D698)SP-SM 7.7 134.2 8.0 133.0 143.6 6 99 98 -2 / 2 DP/MP
39 09/11/23 262-23 C (D698)SP-SM 7.7 134.2 7.1 132.1 141.5 6 98 98 -2 / 2 DP/MP
40 09/11/23 262-23 C (D698)SP-SM 7.7 134.2 7.7 133.1 143.4 6 99 98 -2 / 2 DP/MP
41 09/11/23 262-23 C (D698)SP-SM 7.7 134.2 7.9 132.9 143.4 6 99 98 -2 / 2 DP/MP
Test Information
Test #Test Location Elevation Reference
Gauge
Make / Model / SN / Calibrated Field Technician
34 Structural Fill: Center footing ¶below subgrade Troxler / 3440 / 23818 / 04/03/2023 Sam Emerson
35 Structural Fill: North pad for crawl space Subgrade Troxler / 3440 / 23818 / 04/03/2023 Sam Emerson
36 Structural Fill: Center pad for crawl space ¶below subgrade Troxler / 3440 / 23818 / 04/03/2023 Sam Emerson
37 Structural Fill: South pad for crawl space ¶below subgrade Troxler / 3440 / 23818 / 04/03/2023 Sam Emerson
38 Structural Fill: Footing Backfill: Center footing ¶below subgrade Troxler / 3440 / 23818 / 04/03/2023 Sam Emerson
39 Structural Fill: Footing Backfill: North pad for crawl space Subgrade Troxler / 3440 / 23818 / 04/03/2023 Sam Emerson
40 Structural Fill: Footing Backfill: Center pad for crawl space ¶below subgrade Troxler / 3440 / 23818 / 04/03/2023 Sam Emerson
41 Structural Fill: Footing Backfill: South pad for crawl space ¶below subgrade Troxler / 3440 / 23818 / 04/03/2023 Sam Emerson
Remarks
DP/MP: Density Pass / Moisture Pass
DP/MF: Density Pass / Moisture Fail
Comments
Tests are "Direct Transmission" (Method A) unless probe depth is noted as
"Backscatter". Gauge calibration data on file with the testing agency.
This report presents opinions formed as a result of our observations of soil compaction. We have relied on the contractor to continue applying the recommended
compactive effort and moisture to the fill during times when our observer is not observing operations. Tests are made of the soils only as believed necessary to
calibrate our observer¶s judgement. Test data are not sole basis for opinions on whether the soils meets specifications. These test results only apply to the
samples which were tested. The testing report shall not only be reproduced, except in full, without the written approval of Kumar and Associates, Inc. Nuclear
gauge density testing performed in accordance with ASTM D6938.
Page 1 of 1
Soil Compaction Report
Test Method: ASTM D 6938
Client:
Uriel Mellin
Glenwood Springs, CO 81611
144 Cliffrose Way
Project:
Lot 43, Pinyon Mesa
23-7-414.A
Glenwood Springs, CO 81601
84 Cliff Rose Way
5020 County Road 154
Glenwood Springs, CO 81601
Phone: 970-945-7988
Glenwood Springs
Test Results
Test #
Retest
Of Test Date Proctor ID Method
Soil
Classification
Optimum
Moisture
(%)
Maximum
Dry Density
(pcf)
In Place
Moisture
(%)
In Place
Dry
Density
(pcf)
In Place
Wet
Density
(pcf)
Probe
Depth
(in)
Percent
Compaction
Min Comp.
(%)
Optimum
Moisture
Tolerance
(%)Remark
42 09/12/23 262-23 C (D698)SP-SM 7.7 134.2 6.5 131.4 139.9 6 98 98 -2 / 2 DP/MP
43 09/12/23 262-23 C (D698)SP-SM 7.7 134.2 6.5 131.4 139.9 6 98 98 -2 / 2 DP/MP
44 09/12/23 262-23 C (D698)SP-SM 7.7 134.2 5.9 136.7 144.8 6 102 98 -2 / 2 DP/MP
45 09/12/23 262-23 C (D698)SP-SM 7.7 134.2 6.2 132.7 140.9 6 99 98 -2 / 2 DP/MP
46 09/12/23 262-23 C (D698)SP-SM 7.7 134.2 7.1 134.5 144.0 6 100 98 -2 / 2 DP/MP
47 09/12/23 262-23 C (D698)SP-SM 7.7 134.2 6.2 134.3 142.6 6 100 98 -2 / 2 DP/MP
Test Information
Test #Test Location Elevation Reference
Gauge
Make / Model / SN / Calibrated Field Technician
42 Structural Fill: Footing Backfill: Center footing Subgrade Troxler / 3440 / 23818 / 04/03/2023 Sam Emerson
43 Structural Fill: Footing Backfill: East side of site a¶north of the ¶step down Subgrade Troxler / 3440 / 23818 / 04/03/2023 Sam Emerson
44 Structural Fill: Footing Backfill: Footing on west side of site Subgrade Troxler / 3440 / 23818 / 04/03/2023 Sam Emerson
45 Structural Fill: Footing Backfill: South column pad Subgrade Troxler / 3440 / 23818 / 04/03/2023 Sam Emerson
46 Structural Fill: Footing Backfill: a¶from the southwest corner of the site Subgrade Troxler / 3440 / 23818 / 04/03/2023 Sam Emerson
47 Structural Fill: Footing Backfill: Center column pad Subgrade Troxler / 3440 / 23818 / 04/03/2023 Sam Emerson
Remarks
DP/MP: Density Pass / Moisture Pass
Comments
Tests are "Direct Transmission" (Method A) unless probe depth is noted as
"Backscatter". Gauge calibration data on file with the testing agency.
This report presents opinions formed as a result of our observations of soil compaction. We have relied on the contractor to continue applying the recommended
compactive effort and moisture to the fill during times when our observer is not observing operations. Tests are made of the soils only as believed necessary to
calibrate our observer¶s judgement. Test data are not sole basis for opinions on whether the soils meets specifications. These test results only apply to the
samples which were tested. The testing report shall not only be reproduced, except in full, without the written approval of Kumar and Associates, Inc. Nuclear
gauge density testing performed in accordance with ASTM D6938.
Page 1 of 1
Soil Compaction Report
Test Method: ASTM D 6938
Client:
Uriel Mellin
Glenwood Springs, CO 81611
144 Cliffrose Way
Project:
Lot 43, Pinyon Mesa
23-7-414.A
Glenwood Springs, CO 81601
84 Cliff Rose Way
5020 County Road 154
Glenwood Springs, CO 81601
Phone: 970-945-7988
Glenwood Springs