HomeMy WebLinkAboutState Deferal of Inspection Formreet COLORADO
Depadment of local Affairs
Division of Housing
v,J<;eil0t dlSarl
SG,at ev< 3t{
NEw Cw'le, CO 6lt'97
"AC" (Alternative Construction) Form
Please read below before signing form.
Please see the attached Document at bottom of form for specific plan and factory information.
To: The Local Authority Having Jurisdiction (LAHJ) or other DOH approved third party inspection agency.
By signing this form, you confirm that you have received and reviewed this form, and acknowledge that
the above identified components are required to complete the construction of this modular structure onsite
within you r jurisdiction.
Building Official Responsibility
Please check the box labeled "Accept" and initial to confirm that you will take responsibility for inspections
of the "AC" lnspection ltems on behalf of the DOH. You also acknowledge that it will be done to the DOH
approved plans.
lf you would like to defer inspection of the "AC" lnspection ltems back to the DOH, please check the box
labeled "Defer lnspection".
*ATTENTION*
An "AC" lnspection ltem is a component that was not provided at an off-site location to complete the
compliance of the factory-built structure. This component is shipped to the site location for the completion
of that structure. Components identifled as "AC" lnspection ltems relate to the durability, quality, and
safety of the structure, to include the Structural, Mechanical, Electrical, Plumbing, Eneregy, Fire
protection, and Life Safety components.
A Local lnspection ltem is any site construction that the LAHJ is capable of inspecting from start to finish
of the construction process. Local lnspection ltems are open construction and all components are easily
visible before they are concealed within cavities of the wall, floor, and ceiling construction.
lf the LAHJ defers the "AC" linspection ltems, it is still responsible for reviewing and inspecting the items
listed as Local lnspection ltems. Those items are not considered "AC" lnspection ltems and therefore do
not fall under the purview of the DOH state regulatory program covering the construction of all factory-built
structures (modular) in Colorado. However, they are important to be accounted for before a Certificate of
Occupancy (C/O) should be issued for the structure.
Fire Safety Official Responsibility (if applicable)
The DOH defers the requirement of any fire protection system for all modular IBC (Section 901.2) and IRC
I
-TOUAT HOUSING
O PPORlUNITY
1313 Sherman St., Rm 320, Denver, C0 80203 | (303) 864-7810 | cdola.cotorado.gov/housing
reet coroRADo
Department of local Aflairs
Division of Housing
An automatic fire sprinkler system shall be installed in buildings (lBC) OR one and two family dwellings
and townhouses (lRC) as required by the localjurisdiction where the structure or home will be set. Final
tests required by this Section shall be approved by a certified inspector. The inspector must be either an
employee of the fire department having jurisdiction or another qualified individual with prior approval of the
Colorado Division of Fire Prevention & Control.
Please confirm if the LAHJ requires a fire protection system for this modular structure. lf so, please
indicate if the inspection will be completed by a fire department (identify which one) or whether it will be
completed by the Colorado Division of Fire Prevention & Control.
Man ufactu rer Responsi bi lity
The registered factory is responsible for manufacturing a structure that is compliant with our Administrative
Rules (CCR 1302-14).lf items in the factory have not been completed, only to be completed in the field,
you are still responsible for ensuring they have been completed for compliance. Please sign below that you
have received this letter and acknowledge the items listed are to complete compliance of the structure, and
items are to be inspected and passed for compliance in order to meet Rule 1 . 1 3.1 and section 24-32-
331 1(4), Colorado Revised Statutes (C.R.S.).
*ATTENTION*
A DOH issued insignia (silver for residential or blue for nonresidential) certifying its construction cannot be
affixed to the structure untilall "AC" items are completed on site and pass inspection. The same applies to
modular structures manufactured by a certified factory,
Acknowledge Receipt and Understanding
Normal permits and fees for these site work inspections are to be per the localjurisdiction. ltems listed as
"Local lnspection ltems" are to meet the local building requirements.
State approved plans for Factory-Built Construction may be obtained from the Builder/Manufacturer.
A copy of this completed form is included with the DOH approved plans and must be included with the
installation instructions and shipped with the unit. lf the completed form has been damaged or lost during
shipping, the factory or its representative can obtain a copy from the DOH.
Before any inspection is scheduled at the onsite location or lnstallation Authorization (required for modular
homes and multi-family structures) is issued by the DOH, this form will be required to be signed and dated
by the Building Official, or Approved Third Party Agent, or Fire Safety Official (if applicable), and submitted
to the DOH.
The DOH approved AC form will be included with the approved spec file, with the DOH Plan Reviewer
signature below and their plan approvalstamp on the page(s) with the AC listed items to be completed at
the site location. That approved AC form should be submitted to the appropriate parties described in this
form and submitted back to the DOH before any inspection is scheduled at the onsite location or
lnstallation Authorization (required for modular homes and multi-family structures) is issued.
DOH Plan Reviewer Name G Ard
IOUAI HOUSING
OPPOTTU NITY
1313 Sherman St., Rm 320, Denver, CO 80203 | (303) 864-7810 | cdota.cotorado.gov/housing
rest coroRADo
Department of Local Affairs
DMsion of Housing
DOH Plan Reviewer Signature fr
Date December 15,
Building Department Representitive Printed
Building Department Representitive Signaiure
Title dt{t6f 6trrto ruC-- 6ffi<,1*t-
o"e-E:i-4
X Defer lnspection
emat qreq.ardrev@state.co.us
Lr$roe
Accept Contact email ffit#Grta.6r<lD-
4MFf(7. <o r4.
lf applicable
Fire Safety OfficialPrinted Name
Fire Safety Official Signature Date
Contact email:
ls a fire protection system required? (check one)Required Not Required
lf required, the inspection is to be performed by (check one):
Fire Department: (NAME)
OR
Colorado Division of Fire Prevention & Control
Factory Authorized Quality Assura nce Representative
Printed Name Jill Kottwitz
Factory Authorized Quality Assurance Representative
Kottwitz, Jill lf;:lxy"r,i*tv*0Dc che'nd Dc-ner
oate 1 2/8122
Contact email j i ll, kottwitz@ch ief i nd.com
lf the inspection has been deferred and the factory elects to utilize an Approved Third Party Agency to
inspect the "AC" items on behalf of DOH, please sign and date below.
Approved Third Party Age nt Printed Name
tauAr fiousrNo
OPPOTIUNIIY
1313 Sherman St., Rm 320, Denver, CO 80203 | (303) 864-7810 | cdola.colorado.gov/housing
reel cotoRADo
Depanment of tocal Affairs
Division of Housing
Approved Third Party Agent Sig nature
Contact email
Verify I nspection(s) Completed
Once you have completed all of your assigned inspections identified in this form and they have passed for
compliance, please sign and date below.
Building Department Rep resentitive Printed Name
Building Department Representitive
Date
Contact email
Or
Approved Third Party Agent Printed Name
Approved Third Party Agent Signatu Date
Contact email:_
Fire Protection Systems (if applicable)
Fire Safety OfficialPrinted Name
Fire Safety Official Sig nature ate
Contact email:
Please direct questions to manufactured.plans@state.co.us\
IOUAT HOUSING
O PPOTIUNITY
1313 Sherman St., Rm 320, Denver, CO 80203 | (303) 864-7810 | cdola.cotorado.gov/housing
reel coroRADo
Department of local Affairs
Division of Housing
The following is based on information provided to the Division of Housing (DOH) and may
be modified based on the actual findings of the field inspection.
DArE: 11/Zl202Z
MANUFA6TURER: BOnnaVilla rD No.: 3276
coNrAcr: Jill Kottwitz / iill.kottwitz@chiefind m PHoNE No.: 402-694-5250
M.DEL No.. PlD6428 2g-Mg4B34 DoH p/A No.: R-0005096AC
INSPECTION REQUIREMENTS:
Check on site:
"AC" lnspeclion
1, DORMERS
2. DORMER WINDOWS
3. LATERAL TRUSS BRACING
4. LOFT ELECTRICAL
5. THERMAL CLOSE OFF OF STAIRWELL TO LOFT
6. GABLE WALLS
7. COLLAR TIES
8. TRUSS TOP CHORD GUSSET
9. MATE LINE PORCH POST - TEMPORARY POST INSTALLED IN FACTORY
Local lnspection
1. RECESSED DRYER VENT
2. CRAWLSPACE INSULATION
3. GAS LINE . FURNACE / RANGE
4. SMOKE ALARMS IN LOFT
5. HANDRAIL
6. OUTSIDE SERVICE EMERGENCY DISCONNECT
7, SERVICE SURGE PROTECTION
IOUAT HOUSING
OPPONIUNIIY
1313 Sherman St., Rm 320, Denver, CO 80203 | (303) 864-7810 | cdola.colorado.gov/housing