Loading...
HomeMy WebLinkAboutManual J Report* wrighe*fr Load Short Form Fam/MasterlGuest Monarch HVAC Job: Date By: 1014 Bald Eagle Way 1014124 Toby Monger Project lnformation For:Jeff Clafin, Peak3 Construction 310 Market St, Basalt, Co 81621 Phone: 720-353-8622 E mai I : jeff@peak3aspen.com (*nra* roc?ived u/otfznz 4 Design lnformation Glg 93 75 18 H 50 -44 Htg -2 70 72 50 64 lnfiltration Ortside db CF) lns ide db (" F) Design TD ("F) Daily range lnside humidity (70) Moisture difference (grilb) Method Shielding / stories Pressure / AVF Blower door 3 @artiat) l2 50 Pa I '1203 cfm Make Trade Model AHRI ref Efficiency Heating input Heating output Temperature rise Actual air flow Air flow factor Static pressure Space thermostat ROOM NAME 96.1 AFUE 60000 Btuh 58000 Btuh 89 "F 740 cfm 0.030 cfm/Btuh 0.80 in H2O 60 51 231 78 239 117 286 118 30 129 355 41 HEATING EQUIPMENT Amana AMANA ACVC960603BN 7368877 COOLING EQUIPMENT Make AmanaTrade AMANA Cond ASXS6S2410A Coil CHPE3636B4A+ACVC960603BNB AHRIref 210793919 Efficiency 10.1 EER2, 17 SEER2 Sensible cooling 15540 Btuh Latent cooling 6660 Btuh Totalcooling 22200 Btuh Actual air flow 740 cfm Air flow factor 0.049 cfm/Btuh Static pressure 0.80 in H2O Load sensible heat ratio 1.00 Clg AVF (cfm) N Sinks Tub Bed 3 Bath Family H2 G Bed wrc WC 1 070 141 2707 302 2847 0 5290 1763 0 1602 7513 11 14 367 61 2096 129 2480 0 2812 407 0 1632 5003 250 33 4 82 o 87 0 161 54 0 49 228 34 18 3 102 6 120 0 137 20 0 79 243 12 M Bath M Bed GCI Boldlttalic values have been manually ovcftldden Calculations approved by ACCA to meet all requirements of Manual J 8th Ed Area (tr) Htg load (Btuh) Clg load (Btuh) Htg AVF (cfm) *f" g.lrs**g*.Right-Suite@ U niversal 2024 24.0.02 RSU65503 2024-Nov-06 13:05:26&...Wrightsoft\l0l4BaldEagleWay(Carbondale).rup Calc=MJB FrontDoorfaces: W Page 1 {tTw*shtsff Load Short Form UpperlMain Liv Monarch HVAC Job: Date By: 1014 Bald Eagle Way 10//4124 Toby Monger Project lnformation For:Jeff Clafin, Peak3 Construction 310 Market St, Basalt, Co 81621 Phone: 720-353-8622 Email : jeff@peak3aspen.com Desi n lnformation clg 93 75 18 H 50 -44 Htg -2 70 72 50 64 lnfiltration Ortside db f F) lns ide db ('F) Design TD f F) Daily range lnside humidity (%) Moisture difference (gr/lb) Method Shielding / stories Pressure / AVF Blower door 3 (partiat) I 2 50 Pa / 1203 cfm Make Trade Model AHRI ref Efficiency Heating input Heating output Temperature rise Actual air flow Air flow factor Static pressure Space thermostat ROOM NAME 96.1 AFUE 80000 Btuh 77000 Btuh 66 'F 1317 clm 0.034 cfm/Btuh 0.80 in H2O 85 57 413 52 71 83 88 124 54 18 12 136 19 285 HEATING EQUIPMENT Amana AMANA ACVC960804CN 7368878 COOLING EQUIPMENT Make AmanaTTade AMANA Cond ASXS6S4210A Coil CHPE3743C4A+ACVC960804CNB AHR|ref 210794026Efficiency 8.5 EER2,16.6 SEER2 Sensible cooling 27650 Btuh Latent cooling 1 1850 Btuh Totalcooling 39500 Btuh Actual air flow 1317 cfm Air flow factor 0.047 cfm/Btuh Static pressure 0.80 in H2O Load sensible heat ratio 1.00 Clg AVF (cfm) Stair Bath 4 Bed 4 h4 Stairs Laun Mud H Pdr c cl1 Office cl2 Liv 2087 1299 8012 1400 0 0 0 2847 2324 0 0 2530 0 361 8 290 374 6250 687 0 0 0 1224 1 133 0 0 2600 0 3918 14 17 291 32 0 0 0 57 53 0 0 121 0 183 70 44 270 47 0 0 0 96 78 0 0 85 0 122 Boldlltalic values have been manually ovarridden Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. Clg load (Btuh) Htg AVF (cfm) Area (tr) Htg load (Btuh) 4" x*lt*ttffi Risht-suite@ universat 2024 24.0.02RSU65503 2024-Nov-06 13:05:26 Page 3,&tcffi ...Wrightsoft\1014 Bald Eagle Way (Carbondale).rup Calc = MJB Front Door faces: W * onshe*fr Com ponent Constructions FamlMasterlGuest Monarch HVAC Job: 1014 Bald Eagle Way Date: 1014124By: Toby Monger lnformationPro For:Jeff Clafin, Peak3 Construction 310 Market St, Basalt, Co 81621 Phone: 720-353-8622 Email : jeff@peak3aspen.com Design Conditions Location: Garfield Co Rgnl, CO, US Elevation: 6045 ftLatitude: 40'N Outdoor: Drybulb ("F) Dailyrange ('F) Wet bulb ("F) Wind speed (mph) lndoor: lnd oor temperature ("F) Design TD fF) Relative humidity (%) Moisture difference (gr/lb) Infiltration: Method Shielding / stories Pressure / AVF 70 72 50 63.7 Blower door 3 (partial) / 2 50 Pa I 1203 cfm Heati ng Gooling 75 18 50 -43.9Heating -2 15.0 93 35 (H ) 59 7.5 lingCoo Construction descri ptions Walls 12F-0sw: Frm wall, wd ext, 3/8" wood shth, r-21 cav ins, l12" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitions (none) Windows 2 glazing, clr low-e outr, air gas, vnl frm mat, clr innr, 114" gap,1/B" thk: 2 glazing, clr low-e outr, air gas, vnl frm mat, clr innr, 114" gap,1/8" thk; 6.67 ft head ht Doors (none) Ceilings 16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 ceil ins, 1/2" gypsum board int fnsh Floors 'l9D-0cstp: Flr floor, frm flr, 12" thkns, tight cnrvl ovr, r-19 wall insul 454 299 389 607 1748 0.065 0.065 0,065 0.065 0.065 21.0 21.0 21 .0 21 .0 21 .0 4,68 4.68 4.68 4.68 4.68 0.70 0.70 0.70 0.70 0.70 Or Area 126 51 147 1B 342 U-value Btuh/ft?rF lnsul R tr-"F/Btuh Htg HTM Loss Glg HTM Gain Btuh/ft'z Btuh Btuh/ff Btuh n e s all n e s all 0.300 0.300 0.300 0.300 0.300 0 0 0 0 0 21 21 21 21 21 6 6 6 6 6 2124 1400 1819 2839 81 81 2716 1098 3175 389 7378 11.1 33.6 '17.5 33.6 18.4 316 208 270 422 '1216 1399 1710 2567 606 6282 1734 0.020 1734 0.368 50.0 1.44 2497 0.91 1574 19.0 1.25 2171 0.31 534 *l* H:g.t*r. "*,: Ris ht-su ite@ u n iv €rsat 20 24 24 . o.o2 Rsu6 5503 2024'Nov-06'13:05:26 Page 1& ,CCCill ...Wrightsofl\1014 Bald Eagle Way (Carbondale).rup Calc = MJ8 Front Doorfaces: W *wr{glhecfr Project Summary FamlMasterlGuest Monarch HVAC 1014 Bald Eagle Way 1014124 Toby Monger Job: Date By: For: Notes Jeff Clafin, Peak3 Construction 310 Market St, Basalt, Co 81621 Phone: 720-353-8622 Email : jeff@peak3aspen.com n lnformationD Weather: Winter Design Gonditions Garfield Co Rgnl, CO, US Summer Design Conditions VentilationMethod ASHRAE62.2-2419 Heating Summary Outside db lnside db Design TD Structure Ducts (R-8.0) centril veni (sER=50% 178 ctm) ffiffiS#tD Renewaire EV Pioino EquiPiment load lnfiltration Method Shieldino / stories Pressurd / AVF Sensible Gooling Equipment Load Sizing -2 "F 70 'F72 'F 23555 Btuh 795 Btuh 5639 Btuh Premium L located in0 Btuh0 Btuh 29989 Btuh Blower door 3 /oarlial\ l2 5o Pa) 12o3tfm Outside db lnside db Desion TD Daily range Relative humidity Moisture difference Structure Ducts (R-8.0) Central vent crfitEgy recovery, Blower 93 "F75 'F 18 'F H 50 Yo -44 grllb n 0.98 16239 Btuh 14563 Btuh 672 Btuh f386 Btuh178 Use manufacturer's data Aea (fi2) Volume (ff) Air changes/hour Equiv. AVF (cfm) Heating Equipment Summary Amana AMANA ACVC960603BN 7368877 Rate/swino multiolier Equipmenl sensible load Latent Gooling Equipment Load Sizing Structure 376 BtuhDucts -96 Btuh Central vent (LER=50% 178 cfm) -2124 Bluh Enerav recoierv. Renewaire EV Premium L located in crawler Equip-fient latenf ioad 0 Btuh Equipment Total Load (Sen+Lat) 16239 Btuh Req. total capacity at 0.70 SHR 1.9 ton Cooling Equipment Summary Make AmanaTrade AMANACond ASXS6S2410ACoil CHPE3636B4A+ACVC960603BNBAHRIref 210793919Efficiency 10.1 EER2, 17 SEER2 Sensible coolino 15540 Btuh Latent cooling " 6660 BtuhTotalcoolino 22200 Bluh Actual air fld 740 cfm Air flow factor 0.049 cfm/Btuh Static pressure 0.80 in H2O Load sensible heat ratio 1.00 Heatino1rc{ 19581 0,16 53 Coolino 173{ 19581 0.08 26 Make Trade Model AHRIref Efficiency Heating input Heating output Temoerature rise Actubl air flow Air flow factor Static pressure Space thermostat 96.1 60000 58000 89 740 0.030 0.80 AFUE Btuh Btuh OF cfm cfm/Btuh in H2O Boldltlaltc values have beon manuaUy overildden Calculations aporoved bv ACCA to meet all requirements of Manual J 8th Ed. 2024-Nov-06 13:05:26 Page 1,+,lD*...Wrightsoft\1014 Bald Eagle Way (Carbondalo).rup Calc = MJ8 Front Door faces: W