Loading...
HomeMy WebLinkAboutBolt Inspection ReportIndustrial lnspection Services P.O. Box l9l6 Carbondale, CO 81623 BillTo John Rippl PO Bor 1236 Glcnuood Springs, C0 81602 970-379-1161 <{ lnvoice Date lnvoice # 10n3D024 73956 Quanti$ P.O. No.Terms Project Net 30 Descriplion Rale Amount l0-8.2024 horide special inspcction for tensioning ofhigh-strength A-325 bolts.'Iodalrs inspeclion activities focused on beam to column connfftions and mid-span roof supporting beam splice conneclions utilizing the "lum ofnutn method pcr the buikling manufacturer's instructions. Observe rvort to bring faying surfaces into full contact. \toniror effons to achiele rhe code dcfincd "snug-tight" condition. l'his was complcted prior to match marking and roratin-s 4.325 harduare 120 dcgrees to achiel'c a lully tcnsioned connection. lnspect all A.325 bolts to ensurc lhis uas achieved. Ar rhe close oftoday's inspcction, the sork ofbolt tensioning as dictated in approvcd plans of the appro.rimarelX 600 squarc foot detached garagc slructute fully appean to compll'with approved plans and applicablc codes. g?^f W 90.00 495.00 2lll CR I17, Glcnwood Springs Meul Building Total $495.00