Loading...
HomeMy WebLinkAboutManual J Report/Zazua/T Jutio ffi#ar*n* - 44 Rwaw Craek Flaee, Farashwt* HYS C d-oad #aJry#afica:s for Julio Moreno 44CI6 COUNTY ROAD 331 sft, co 81652 ffi il RHVA*REeTnEHTTA,L HVJTC Lonna Prepared By: Fritz Diether Frostbusters & Coolth Co. PO Box 94 Basalt CO 81621 (970) 274-1141 Friday, November 1 ,2024 il i I Rhvac is an ACCA approved Manual J, D and S computer program' Calculations are performed perACCA ManualJ 8th Edition, Version 2, and ACCA Manual D l{VAeLandfi JulbRhttrto Designed By: Project Date: Project Comment: Client Name: Client Address: Client City: Client Phone: Client E-MailAddress: Client Comment: Company Name: Company Representative: Company Address: Company City: Company Phone: Company E-Mail Address: Company Website: Company Comment: oreno - 44 Roan Creek ManualJ By Fritz Diether October 30,2A24 Julio Moreno 4406 COUNTY ROAD 331 sitt, co B'1652 970-379-1482 J u I io@steeplechaseconstruction. com 44 Roan Creek Place, Parachute, CO 81635 Frostbusters & Coolth Co. Fritz Diether PO Box 94 Basalt CO 81621 (970) 274-1141 fritzd@frostbusters.com frostbusters.com rence City: Building Orientation: Daily Temperature Range: Latitude: Elevation: Altitude Factor: Elevation Heating Adj. Factor: Front door faces South High 39 Degrees 5300 ft. 0.823 0.840 Winter: Summer: Outdoor Dry Bulb -z 86 Outdoor Wgt 9.ulh -2.73 62 Outdoor Rel.Hum n/a 28o/o lndoor Rel.Hum iila 40% lndoor D*ry.Es!q 72 Grairrs Difference nla 075 Total Building Supply Square ft. of Room Area Volume (ft3): Per Square fi 4.244 z,+JtSquare ft. Per Ton: TotalHeatingRequiredlncludingVentilationAir:53F00B6- Total Sensible Gain: 12,805 Btuh g4 o/o Total Latent Gain: 790 Btuh 6 % Total Cooling Required lncluding Ventilation Air: 13,596 Btuh 1 13 Tons (Based On Sensibte + Latent) is an ACCA I J, D and S computer program Calculatlons are performed per ACCA ManualJ 8th Edition, Version 2, and ACCA Manual D Allcomputed results are estimates as building rrse and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. 2,762 40,117 \10.2.152.10\public ...\Julio Moreno ... -30-2024.rh9 Friday, Novernber 1,2024,1:31 PM Miscellaneous -2 86 62 79o/o 28o/o 40o/o 72 75 -0.11Summer: Calculate: Use Schedule: Roughness Factor: Pressure Drop: Minimum Velocity: Maximum Velocity: Minimum Height: Maximum Height: Yes Yes 0.00500 0.1000 in.wg./100 ft. 650 ft./min 900 ft./min 0 in. 0 in. Yes Yes 0.00030 0.1000 in.wg./100 ft. 450 ft./min 750 ft./min 0in 0in I nfiltration Specified lnfiltration Actual Building Volume: Total Building lnfiltration: Total Building Ventilation 0.332 222 0.332x 40.117 13,317x 0.0167 222 60 AC/hr CFM AC/hr Cu.ft. Cu.ft./hr 0.150x 40,117 6,023x 0.0167 100 60 AC/hr Cu.ft. Cu.ft./hr CFM CFM Summer 0.150 AC/hr 100 cFM CFM CFM --System 1-- lnfiltration & Ventilation Sensible Gain Multiplier: 9.96 = (.1.10 X 0.823 X 1 1.00 Summer Temp. Difference) lnfiltration & Ventilation Latent Gain Multiplier: -0.06 = (0.68 X 0.823 X -0.1 1 Grains Difference) lnfiltration & Ventitation Sensible Loss Multiplier: 66.97 = (1.10 X 0.823 x74'00 Winter Temp. Difference) Winter lnfiltration Specified: 0.332 AC/hr (222 CFM) Summer lnfiltration Specified: 0.150 AC/hr (100 CFM) Blower Door Data: Wind Shielding Class: 2 - Few Obstructions Building Stories: 2 Multi/Single Option: Single-Point Assumed n: 0.65 Pressure Diff.: 50 Test Flow: 2,006 Test AC/hr (Selected): 3 \\1 0. 2. 1 52. 1 0\public .'.\Ju lio Moreno "' -30-2024lh9 Friday, November 1,2024,1:31 PM $ry Nel 'lbn ft", /bn AM Sen @ih td GA[ri N"tl senOarnl k*es sys HS CFM qFct cFt qE td cFld xr,d&i Bnildkrg W$r lffin tu1 1-MaehrBedroom &Mast{ Bdllt ltaundry +Klbhql $'Closet &PoivderRoom 7-Dining Room &Llving Room $Bedrmm#2 10.8€h#1 11-Bedrodn#1 12-Mechanical 2,762 450 t70 94 296 100 31 301 w 2fi 06 250 38 12,805 12,805 597 12,208 2,572 1,114 611 865 151 56 1,050 2,257 1,279 331 1,656 266 790 790 4 794 199 0 0 1S 0 0 199 199 -1 0 -1 0 13,596 13,596 597 13,002 2,771 1,114 611 1,064 151 56 124s 2i56 1279 331 1,656 zffi 45,276 4527e 4018 41zfi 7,20'l 2W2 2,312 3,337 850 453 3,874 8,085 5,074 674 974 674 142 62 36 58 13 7 61 128 80 18 92 22 651,I 651 tilDE tG 15 651 674 '114 36 v 48 I 3 58 125 71 Sum of room airfows may be greater tran s),sbm airfow because use6 tlle 1.13 1.13 2,437 2,437 2162 2162 953 15 5,447 86 1,410ro [oad Preview \\t A.2.1 52.1 O\public ...\Ju lio Moreno ... -30-2024. rh9 Friday, November 1,2A24,1:31 pM tiVl0 toaol Eltb Julio Moreno -44 Roan Creek Fkos, Farachute f_gsqE Duct Size Preview Reg SzeHbclgAct Flo,l, DuctRough Factor MaximumRoom or DuctName Source System't SupplyRunoub Zonel 1-Master Bedroom 2-MasbrBatr 3-Laundry 4-Kihhen 5-Closet 6-PowderRoom 7-Dining Room B-Living Room g-Bedroom #2 10-Bah#1 11-Bedroom#1 12-Mechanical 13-Garage Other Ducts in System 1 Builtln Built-ln Built-ln Built-ln Builtln Built-ln Builfln Builtln Built-ln Builtln Built-ln Built-ln Built-ln 142 2-5 62 1-5 36 14 53 14 13 14 714 61 14 128 2-5 80 1-5 18 14 92 1-5 22 14 0 0-0 674 10x13 750 750 750 750 750 750 750 750 750 750 750 750 750 450 450 450 450 450 450 450 450 450 450 450 450 450 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 521 451.3 418.2 6036 153.7 81.9 700.7 468 587 4 209.5 o/ l.t 255 0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 114 36 15 86 0 0TMDD 15 1 6510 0.0003 0.08 0 u 48 8 a 58 125 71 SupplyMainTrunk 651 674 Surnmary Flow: Sl6tem 1 Heating Flow: \1 0.2.152.10\public ...\Julio Moreno'.. -30-2024'rh9 Friday, November 1, 2024, 1:32 PM 1-Furnacef{C-A Ex Icsf Test For Adequate Exposure Diversity 15, 10, 30,5% Diff. from Avg. (32 Btuh Excursion) 24, -c:J (n g'o (3 0)I 5 U B am 9 am 10 anr 11 anr 12 pnr lpnr 2pm 3pm 4pm 5pm 6pm 7pm / hverage Glass / l.SxAverage Sensible Gain Glass Gain Over 12 Hours / Hourly Glass Gai* / Hor-rrly Total Net Gain SYSTEM DOES NOT HAVE ADEQUATE EXPOSIJRE I]IVFRSITY -,- System is on N, E, S, W rosette. Peak load exceeds 12-hour average load by 30.S%. AED Excursion (amount by which peak exeeeds 1.3 x average): B2 Btuh Definition: A system has adequate exposure diversity if the peak-hour glass load for the entire conditioned space does not exceed the average glass load fcr the entire conditioned space by more than 30 percent. l \1 0. 2. 1 52. 1 O\public . .. \Julio Moreno ... -30-2A24.rh9 Friday, November 1,2A24, 1:32 PM Total B Summa Loads Pella Vinyl 30/28 nylSH, DH, Csmt,298.1 48 21 2406.3 6,621 1,066 368 8,726 318 263 355 5,393 318 263 355 0 0 0 0 Windows, U .30 / SHGC .28, U-value 0.3, SHGC 0.28 Pella Ent Door 30/17: Glazing-PellaEntry Door U .30 / SHGC .17, U-value 0.3, SHGC 0.17 Gar/Hs Fire Door: Door-Garage/House Fire Door R-2, U- value 0.5 R-5 ExUR-21 Batt:Wall-Frame, Custom, R-5 Exterior Foam with R-21 Fiberglass Batt in 2x6 Wall, U-value 0.049 R-5 ExVR-21 Batt: Part-Frame, Custom, R-5 Exterior Foam with R-21 Fiberglass Batt in 2xG Wall, U-value 0.049 R-49 Spy Foam & FG: Roof/Ceiling-Roof Joists Between Roof Deck and Ceiling or Foam Encapsulated Roof Joists, Custom, R-28 Spray Foam plus R-21 Fiberglass Batt in Closed Rafter Cavity, Conditioned Attic, U-value 0.031 R-10 Slab Edge 2'Dn: Floor-Slab on grade, Custom, R- 10 Thickened Edge Slab On Grade, R-0 Under, U- value 0.1 496.4 851 2974.3 6,822 262 1,938 608 608 0 3,319 3,319 0 0 00 Subtotals for structure: People: Equipment: Lighting: Ductwork: lnfiltration: Winter CFM:222, Summer CFM: 100 Ventilation: Winter CFM: 60, Summer CFM: 60 Exhaust: Winter CFM: 60, Summer CFM: 60 AED Excursion: 4 0 26,392 0 14,866 4,018 0 0 800 0 10,256 920 0 0 0 1,000 597 10,256 1,720 0 0 0 994 594 0 -6 -4 0 32 32 Total Building Load Totals:45,276 790 12,805 13,596 Supply Square ft. of Room Area: Volume (ft3): CFM Per uare Square ft. Per Ton 2,4372,762 40,117 Total Heating Requ Total Sensible Gain Total Latent Gain: ncluding Venti Total Cooling Required lncluding Ventilation Air: 53,90 12,805 Btuh 790 Btuh 13,596 Btuh 53.900 MBH (Base 94 o/o 6% Derating) 1.13 Tons (Based On Sensible + Latent) Rhvac ts an approved Man ,DandS r program Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. \\1 0. 2. 1 52. 1 O\public ...\J u lio Moreno ". -30-2024.rh9 Friday, November 1 ,2024, 1:32 PM i Rhyaa . Reridential E Light Gommcrclal Froctburt lt&CoolthGo. Besalt, CO S1621 Loedr Jufto F Sr6 D,ilAiJLJ"{.,J Pia fharf Floor 4 entilation 9% Roof 1 5% Building Loss 45,276 Btuh nfiltration 33% Wall21% Roof 24% Building Gain 13,596 Btuh Wall To/o Door 1% Excursion 0% entilation 4% lnfiltration 7% eopie i 3% Door 2o/o Glass 17% \1 0.2,152.10\public ...\Julio Moreno ... -30-2A24.rhg Glass 42o/o Friday, November 1.2A24,1:32 PM ' Flnie - Fceiillrttirt a [iCtrt Oommerctct HVAc Loaoo Fltlat&nx*ers & @oolth Co. BtsElt- CO 8{621 Julio Moreno 1-Hou Room Net Gain System 1 Hourly Room Net Gain 4,OOO 3,OOO 1,OOO 3pm 4pm 5Pm 6Pm 7Pm .c frc2. E 2 ooo 8am 9am lOam '1 1am 12Pm o 1 pm 2pm Time of Day + -t- -l--|-:**-lt** -1- -€- Master Bedroom (57o/d Master Bath (767d Laundry (OYd Kitchen (1s9ld Closet (Oold Powder Room (oyd Dining Room (277d Living Room (287d Bedroom#2 (61old Bath #1 (567d Bedroom #1 (687o) Mechanical (O7o) Garage (O9lo) Note: Glass gain as a percent of net gain is shown in parenthesis. Although floor, roo_f, wall and door gains also vary throughout thie Oay, for this graph and in Manual J glass gains are the only ones that fluctuate. \1 0.2.1 52.1O\public ...\Julio Moreno .. -30-2024:h9 Friday, November 1, 2024, 1:32 PM Oefailed Room Loads - Room 1 - Master Bedroom VE Load Procedure Room Length: Room Width: Area: Ceiling Height: Volume: Number of Registers: RunoutAir: Runo*t Duct Size: Runout Air Velocity: Runout Air Velocity: Aetual Lass: ExVR-21 Batt 13.2 E -Wall-R-S Ext/R-21 Batt 4.2 X 10 W-Watl-R-S ExUR-21 Batt 18 X 10 N -Gls-Pelta Vinyl 30/28 shgc-O.28 100%s N -Gls-Pelta Wnyl 30/28 shgc-0.28 100%oS W -Gls-Pella Vi*yl 30/28 shgc-0.28 o%s W-Gfs-Pella Vinyl 30/28 shgc-0.28 0%s UP-Roof-R49 Spy Foam & FG 484.3 X I Floor-R-10 Slab Edge 2'Dn 45 ft..Per. 2 71 CFM 5 in. 521 ft./min. 521 ft./min. 0.095 in.wg.i100 ft. System Number: Zone Number: Supply Air: Supply Air Changes: Req. Vent. Clg: Actual Winter Vent.: Percent of Supply.: Actual Summer Vent. 1 1 142 CFM 1.4 AC/hr O CFM 1O CFM 7 o/o 13 CFM I o/o 35 CFM 16 CFM nla nla 449.6 sq.ft. 13.2 ft. 5,920 cu.ft. Percent of Su ActualWinter pplv lnfil. Actual Summer lnfil. 0.049 0.049 0.049 0.300 0.300 0.300 0.300 0.031 0.1 00 42.5 139.2 20.4 3.6 3.6 22.2 154 505 453 20.4 20.4 20.4 484.3 45 22.2 22.2 22.2 2.3 7.4 453 453 453 1,111 333 0.1 0.1 0.1 8.8 8.8 29.8 29.8 1.1 0.0 38 6 2A 179 179 607 607 540 0 0 0 0 0 0 0 0 0 Subtotals for Structure: lnfil.: Win.:35"2, Sum.: 15.9 AED Excursion: lseple.?qgl4!Ee!.?9qrql&er. Room Totale: 519 4.547 4,842 2,359 0.306 0 -1 200 2j7A 159 7 l.*)\, 7,201 199 2,572 \\10.2.1s2.1O\pubtic ...\Jutio Moreno ... _30_2024.rh9 Friday, November 1, 2024,1:32 pM HVAC Loadr t JultoMorsno- De tailed Room L oa ds Room 2 Ma sfer B ath Load Pracedure Calculation Room Length: Room Width: Area: Ceiling Height: Volume: Number of Registers: Runout Air: Runout Duct Size: Runout Air Velocity: Runout Air Velocity: Actual Loss: 5 in. 451 ft./min. 451 ft./min. 0.074 in.wg./100 ft ccurrences System Number: Zone Number: Supply Air: Supply Air Changes: Req. Vent. Clg: Actual Winter Vent.: Percent of Supply.: Actual Summer Vent. Percent of Supply: ActualWinter lnfil.: Actual Summer lnfil.: 11.5 14.8 169.6 13.2 2,233 1 62 ft. ft. sq.ft. ft. cu.ft. 1 1 62 CFM 1.7 AClhr O CFM 3 CFM 5 o/o 5 CFM I o/o 1O CFM 5 CFM CFM W -Wall-R-S ExVR-21 10 119 20 8.3 182.7 15 0.049 0.300 0.300 0.031 0.1 00 3.6 22.2 22.2 2.3 7.4 432 444 185 419 111 0.1 29.8 29.8 1.1 0.0 0.305 0 0 0 0 0 18 596 248 204 0 W -Gls-Pella Vinyl 30/28 shgc-O.28 0%s W -Gls-Pella Vinyl 30/28 shgc-O.28 0%s UP-Roof-R-49 Spy Foam & FG 182.7 X 1 Floor-R-10 Slab Edge 2'Dn 15 ft..Per. Subtotals for Structure: lnfil.: Win.: 10.0, Sum.: 4.5 AED Excursion: 148 Room Totals: 1,591 671 1,066 45 3 4.549 0 0 2,262 0 1,114 \1 0.2.152.1O\public ...\Julio Moreno ... -30-2024'rh9 Friday, November 1, 2024, 1:32 PM &tailed Room Loads - Room 3 -Laad Procedure Room Length: Room Width: Area: Ceiling Height: Volume: Number of Registers: RunoutAir: Runout Duct Size: Runout Air Velocity: Runout Air Velocity: Actual Loss: S -Part-25"1 Batt 11 X 13.2 W-Wall-R-S ExVR-21 Batt8.5X 10 S -Door€ar/Hs Fire Door 3 X 7 UP'Roof-R-49 Spy Foam & FG 100.7 x 1 Floor-R-'!0 Slab Edge Z'Dn 2O ft.Per. 11.0 ft. 8.5 ft. 93.5 sq.ft. 13.2 ft. 1,231 cu.ft. 1 36 CFM4 in. 418 ft./min. 418 ft./min. 0.076 in.wg./100 ft. System Number: Zone Number: Supply Air: Supply Air Changes: Req. Vent. Clg: Actual Winter Vent.: Percent of Supply.: Actual Summer Vent. Percent of Supply: ActualWnter lnfil.: Actual Summer lnfil.: 1 1 36 CFM 1.8 AC/hr O CFM 3 CFM 9 o/o 3 CFM 8Yo 16 CFM7 CFM 85 21 100.7 3.6 17.5 2.3 7.4 308 368 231 0.1 12.5 1.'l 152 12 263 112 0 0.049 0.049 0.500 0.031 20 0.100 148 0.0 0 0 0 0 S ubtotals for Structu re: lnfil.: Win.: 15.6, Sum.: 7.1 AED Excursion: 230 4.546 1,267 1,045 0.305 539 70 2 0 0 Room Totals:2,312 0 611 \\1 0.2. 1 52. 1 O\public ... Uutio Moreno ... -30-2024.rh9 Friday, November 1,2024,1:32 PM Lgtdf I lill!!Q, Jullo Moreno - 44 Detailed Roam Loads Roorn 4 Kitchen Load Procedure n Mode Room Length: Room Width: Area: Ceiling Height: Volume: Number of Registers: Runout Air: Runout Duct Size: Runout Air Velocity: Runout Air Velocity: Actual Loss: N -Wall-R-S & clg. 16.0 ft. 18.5 ft. 296 16 CFM in. 604 ft./min. 604 ft./min. 0.145 in.wg./100 ft. Occurrences: System Number: Zone Number: Supply Air: Supply Air Changes: Req. Vent. Clg: Actual Winter Vent.: Percent of Supply.: Actual Summer Vent. Percent of Supply: ActualWinter lnfil.: Actual Summer lnfil.: 0 3 0 1 3 4 sq.ft. ft. cu.ft. 1 1 53 CFM 0.7 AClhr CFM CFM o/o CFM Vo CFM CFM 4,81 5 0 5 I 4 8 18 8 Batt 16 X 16.4 244.4 18.4 318.8 16 0.300 0.031 0.100 3.6 22.2 2.3 7.4 408 731 118 1.1 0.0 0.1 8.8 0 0 0 0 N -Gls-Pella Vinyl 30/28 shgc-O.28 100%s UP-Roof-R-49 Spy Foam & FG 318.8 X 1 Floor-R-10 Slab Edge 2'Dn 16 ft.. Per. 161 356 0 4.545 2,143 1,194 0.305 0 553 80 2 230 Subtotals for Structure: lnfil.:Win.: 17.8, Sum.: 8.1 AED Excursion: P eopl q 2 Q lla U,p er,23P -sqqlpe r, Room Totals: 263 1 3,337 200 199 865 \1 0.2.1 52.10\public ...\Julio Moreno ... -30-2024'rh9 Friday, November 1,2024,1:32 PM Detailed Room Loads - Room 5 - Closef Calcu Room Length: Room Width: Area: Ceiling Height: Volume: Number of Registers: Runout Air: Runout Duct Size: Runout Air Velocity: Runout Air Veloeity: Actual Loss: ExVR-21 6.8 X 10 1 1 t3 0.6 0 II 1 B 5 ? 6.8 ft. 14.8 ft. 99.6 sq,ft. 13.2 1,31 1 1 4a 4 154 154 0.013 ft. cu,ft- Load System Number: Zone Number: Supply Air: Supply Air Changes: Req- Vent. Clg: Actual Winter Vent.: Percent of Supply.: AetualSummerVenl.: Percent of Supply: ActualWinter lnfit.: ActualSummer lnftl.: 245 CFM AC/hr CFM CFM o/o CFM o/o CFM CFM 0 0 0 CFM in. ft./min. ft./min. in.wg.l100 ft. UP-Roof-R-49 Spy Foam & FG 107.2X 1 Floor-R-10 Slab Edge 2'Dn7 ft.. Per. 7 0.100 2.3 7.4 107.2 0.049 0.031 246 52 1.1 0.0 120 0 Subtotals for Structure: lnfil.: Win.: 4.6, Sum.: 2.1 AED Excursion: 68 4.548 543 307 0.311 0 o 130 21 0 Room Totals 850 0 151 \1 0.2. 1 52. 1 0\public ...\Julio Moreno ... 3A-2024.rh9 Friday, November 1,2A24,1:32 pM .l Julio Moreno Ellb Cafixlnrn CIpxehp. Slpft elnn r .44 Foan 0EB!'.ryTiR€ffi# i Detailed Roorn Loa ds Room o Po wde r Room Load Procedure Room Length: Room Width: Area: Ceiling Height: Volume: Number of Registers Runout Air: Runout Duct Size: Runout Air Velocity: Runout Air Velocity: Actual Loss: W -Wall-R-S ExUR-21 Batt 4. UP-Roof-R-49 Spy Foam & FG 33.2X 1 Floor-R-10 Slab Edge 2'Dn 4 ft..Per. 7.3 4.3 30.8 13.2 406 1 7 4 82 82 0.005 ft. ft. sq.ft. ft. cu.ft. CFM in. ft./min. ft./min. in.wg./100 ft. System Number: Zone Number: Supply Air: Supply Air Changes: Req. Vent. Clg: Actual Winter Vent.: Percent of Supply.: Actual Summer Vent. Percent of Supply: ActualWinter lnfil.: Actual Summer lnfil.: 1 1 1 7 1 0 1 I 0 4 3 1 CFM AC/hr CFM CFM o/o CFM To CFM CFM 42.5 33.2 0.049 0.031 0.1 1.1 0 0 0 6 37 04 0.100 7.4 76 30 0.0 Subtotals for Structure: lnfil.: Win.: 2.9, Sum.: 1.3 AED Excursion: Room Totals: 264 193 43 13 0 43 4.541 0.306 0 0 453 0 56 \1 0.2.152.1 O\public ...\Julio Moreno ..' -30-2024lh9 Friday, November 1, 2A24,1:32 PM Detailed Room Loads - Roam 7 -Roam foad Proeedu,re Room Length: Room Width: Area: Ceiling Height: Volume: Number of Registers: Runout Air: Runout Duct Size: Runout Air Velocity: Runout Air Velocity: Actual Loss: Htg. & elg. 16.3 ft. 18,5 fr. 300.6 sq.ft. 16.3 ft. 4,885 cu.ft. System Number: Zone Number: Supply Air: Supply Air Changes: Req- Venl Clg: ActualWinter Vent.: Percent of Supply.: Actual SumrnerVent. Percent of Supply: ActualWinter lnfil,: ActualSummer lnfil.: 1 61 4 701 701 0.190 CFM in. ft./min. ft./min. in.wg.lt00 ft. I 1 1 6t 0.8 0 6 I I 18 I CFM AC/hr CFM CFM % CFh* % CFM CFM Ext/R-21 Batt 16.2 X 16.4 N -Gls-Pella Vinyl 30/28 shgc-0.28 100%s N -Gls-Pella Vinyl 30/28 shgc-O.28 100%s N -Gls-Pella Ent Door 30/17 shgc- 0.17 100%s UP-Roof-R- 9 Spy Foam & FG 323.8 X 1 Floor-R-10 Slab Edge 2'Dn 16 ft..Per. 222 10.4 10.4 24 323.8 16 0.049 0.300 0.300 0.300 t\ ^e4 0.100 22.2 22.2 22.2 2.3 7.4 ?te 1 231 3JJ 743 118 8.1 8.8 8.8 6.6 1.1 0.0 vf g1 {59 JOI 0 0 v 0 0 U o Subtotals for Structure: lnfil.:Win.: 18.1, Sum.: 8.2 AED Excursion: ?,e!p!e : 2 00 laVp,er?9Q sedee r; Room Totals: 267 4.*6 2,661 1,213 0.307 ?.AA 735 82 4 230 0 1 3,874 199 1,050 ! \1 0.2.1 52.1 0\public ...\Julio Moreno ... -30-2024.rh9 Friday, November 1,2024,1:32 PM Julio efte gof hmn OeveloPrqPnfr ,[tg. Moreno - 44 Roan Creek Flsoa, FffiSXY Detailed Room Loads - Roone I -Room e Load Procedure Calculation Mode: Room Length: Room Width: Area: Ceiling Height: Volume: Number of Registers: Runout Air: Runout Duct Size: Runout Air Velocity: Runout Air Velocity: Actual Loss: nla nla 644.1 16.3 10,467 2 64 5 468 468 0.070 sq.ft. ft. cu.ft. CFM in. ft./min. ft./min. in.wg./100 ft. rrences System Number: Zone Number: Supply Air: Supply Air Changes: Req. Vent. Clg: ActualWinter Vent.: Percent of Supply.: Actual Summer Vent. Percent of Supply: ActualWinter lnfil.: Actual Summer lnfil.: 1 I 128 CFM 0.7 AC/hr 0 2 9 1 9 CFM CFM To CFM Yo CFM CFM 45 20 -Wall-R-5 26.2X 242.6 20.4 20.4 24 693.7 41 0.049 0.049 0.300 0.300 0.300 0.031 0.1 00 0.1 1.2 13.1 1 3.'1 6.6 1.1 0.0 0 0 0 0 0 0 0 53 297 267 267 159 16.2 S -Part-25'/35'-R-5 ExVR-21 Batt 15X16.2 S -Gls-Pella Vinyl 30/28 shgc-0.28 23%S S -Gls-Pella Vinyl 30/28 shgc-0.28 23YoS S -Gls-Pella Ent Door 30/17 shgc- 0.17 100%s UP-Roof-R-49 Spy Foam & FG 693.7 X 1 Floor-R-10 Slab Edge 2'Dn 41 ft..Per. 1.7 22.2 22.2 22.2 2.3 7.4 416 453 453 533 1,591 303 774 0 Subtotals for Structure: lnfil.: Win.: 45.3, Sum.: 20.5 AED Excursion: 667 4.546 5,053 3,032 0.306 1,817 204 b 230 0 People: 200 laVper , 230 sen/per:200 8,085 199 2,2s7Room Totals: \1 O. 2. 1 52.'l 0\public ...\Ju lio Moreno'.' -30-2024 lh9 Friday, November 1,2A24, 1:32 PM Detailed Room Loade - Room I -Bedroom t*2 Laad Room Length: Room Wdth: Area: Ceiling Height: Volume: Number of Registers: Runout Air: Runout Duct Size: Runout Air Velocity: Runout Air Velocig: Actual Loss: nla nla 255.5 12.4 sq.ft. ft. cu.ft. CFM in. ft./min. ft./min. in.wg.l100 ft. System Number: Zone Number: Supply Air: Supply Air Changes: Req. Vent. Clg: Actual Winter VenL: Percent of Supply.: Actual Summer Vent. Percent of Supply: ActualWinter lnfil.: ActualSummer lnfil.: 1 t 1 80 CFM 1.5 AC/hr O CFM 7 CFM 9% S CFM 8% 28 CFMt3 CFM 3,173 1 80 5 587 587 0.105 ExUR-21 E -Wall-R-S ExVR-21 Batt 18.2 X 10 W-Wall-R-S ExVR-21 Batt 6 X 10 N -Gls-Pella Vinyl 30/28 shgc-0.28 100%s E -Gls-Pella Vinyl 30/28 shgc-0.28 0%s UP-Roof-R-49 Spy Foam & FG 275.2X1 Floor-R-10 Slab Edge 2'Dn 38 ft..Per. Subtotals for Structure: lnfil.: Win.: 28.3, Sum.: 12.8 AED Excursion Room Totals: 153.5 162.1 60 20.4 0.049 0.049 0.300 3.6 3.6 3.6 22.2 557 588 218 453 0.1 0.1 8.8 29^8 1.1 0.0 779 607 307 0 0 0 TJ 0 0 0 0 23 24I 20.4 0.300 22.2 275.2 0.031 38 0.100 7.4 453 2.3 631 281 416 4.546 3,181 1,893 0.305 0 1 1,149 127 J 5,074 -1 1,279 \1 0.2. 1 52. 1 0\public ...\Julio Moreno ... -30-2024.rh9 Friday, November 1, 2024, 1:32 PM FyAC rme I JufuMoruno Detaile d Room L oa ds Room .{I 0 Batlt #I Load Procedu,'e lculation Room Length: Room Width: Area: Ceiling Height: Volume: Number of Registers: Runout Air: Runout Duct Size: Runout Air Velocity: Runout Air Velocity: Actual Loss: -Wall-R-S ExVR-21 Batt 14.0 ft. 6.8 ft. 94.5 sq.ft. 12.4 ft. 1,173 cu.lt. 209 ft./min. 209 ft./min. 0.025 in.wg./100 ft. rrences System Number: Zone Number: Supply Air: Supply Air Changes: Req. Vent. Clg: Actual Winter Vent.: Percent of Supply.: Actual Summer Vent. Percent of Supply: ActualWinter lnfil.: Actual Summer lnfil.: Htg.1 1 1 18 0.9 0 1 8 2 o 5 2 1 18 CFM 4 in. CFM AC/hr CFM CFM Yo CFM Vo CFM CFM 0.049 0.300 22.2 2.3 7.4 222 139 233 52 29.8 1.1 0.0 0 0 0 0 E -Gls-Pella Vinyl 30/28 shgc-0.28 0%s UP-Roof-R-49 Spy Foam & FG 101.8 X 1 Floor-R-10 Slab Edge 2'Dn 7 ft..Per. 101 .8 0.031 7 0.100 114 0 4.548 646 307 0.311 0 0 309Subtotals for Structure: lnfil.:Win.: 4.6, Sum.: 2.1 AED Excursion: 68 21 1 953 0 33 IRoom Totals: \1 0.2.152.1O\public ...\Julio Moreno ... -30-2024'rh9 Friday, November 1,2024,1:32 PM Detailed Room toads - Room 11 - Bedroom #l Laad Room Length: Room Width: Area: Ceiling Height: Volume: Number of Registers: Runout Air: Runout Duct Size: Runout Air Velocity: Runout Air Velocity: Actual Loss: -Wall-R-5 S -Wall-R-5 ExUR-21 Batt 16,5 X 13.8 E -Gls-Pella Vinyl 30/28 shgc-0.28 0%s S -Gls-Pella Vinyl 30/28 shgc-0.28 507oS S -Gls-Pella Vinyl 30/28 shgc-0.28 8%S UP-Roof-R49 Spy Foam & FG 311.8X 1 Floor-R-10 Slab Edge 2'Dn 35 ft..Per. Subtotals for Structure: lnfil.: Win.: 27.7, Sum.: 12.5 AED nla nla 289.5 13.8 4,005 1 92 5 671 671 0.1 50 sq.ft. ft. cu.ft. CFM in. ft./min. ft./min. in.wg./100 ft. System Number: Zone Number: Supply Air: Supply Air Changes: Req. Vent. Clg: Actual Winter Vent.: Percent of Supply.: Actual Summer Vent. Percent of Supply: ActualWinter lnfil.: ActualSummer lnfil.: CFM AClhr CFM CFM % CFM tlo CFM CFM 1 59. 187.4 20.4 20.4 20.4 311.8 35 0.049 0.300 0.300 0.300 0.031 0.1 00 22.2 22.2 22.2 2.3 7.4 679 453 453 453 715 259 0.1 0.1 29.8 11.6 14.0 1.1 0.0 3.6 3.6 049 0 0 0 0 s 0 0 28 607 236 285 348 0 408 4.547 3,591 1,856 0.306 1,527 125 4 0 4 Room Totals:5,447 -1 1,056 \10.2.152.1O\public ...\Julio Moreno ... -30-2024.rh9 Friday, November 1, 2A24, t:32 PM Deta iled Room L oa ds Ro om 1 2 Mech anicai Load Procedure Room Length: Room Width: Area: Ceiling Height: Volume: Number of Registers: Runout Air: Runout Duct Size: Runout Air Velocity: Runout Air Velocity: Actual Loss: 8.5 4.5 38.3 13.2 504 1 22 4 255 255 0.032 ft. ft. sq.ft. ft. cu.ft. CFM in. ft./min. ft./min. in.wg./100 ft System Number: Zone Number: Supply Air: Supply Air Changes: Req. Vent. Clg: Actual Winter Vent.: Percent of Supply.: Actual Summer Vent. Percent of Supply: ActualWinter lnfil.: ActualSummer lnfil.: 1 I I 22 CFM 2.7 AClhr O CFM 2 CFM 9% 1 CFM 6 o/o 12 CFM 5 CFM E -Part-25'135'-R-5 4.5 X 10 1 Batt 0.049 0.049 0.049 0.031 0.100 77 146 163 95 133 1.2 1.2 0 0 0 0 0 S -Part-25"/35'-R-5 ExUR-21 Batt 8.5 X 10 W -Wall-R-S ExUR-21 Batt 4.5 X 10 UP-Roof-R-49 Spy Foam & FG 41.2 X 1 Floor-R-10 Slab Edge 2'Dn 18 ft..Per. 85 45 41.2 18 1.7 3.6 2.3 7.4 0.0 0 1 104 7 46 0 Subtotals for Structure: lnfil.: Win.: 11.9, Sum.: 5.4 AED Excursion: 175 4.549 614 796 0.303 212 53 I 0 0 Room Totals:1,410 0 266 \1 0.2.152.1 O\public ...\Julio Moreno ... -30-2024.rh9 Friday, November 1,2024,1:32 PM 'l Room Load 1 Master Bedroom2 Master Bath 3 Laundry4 Kitchen 5 Closet G P*x&r Room7 Dining Room 8 Living RoomI Bedreom #2 10 Bath#11t Bedroonn #1 12 Mechanical 450 170 94 296 100 31 301 644 256 95 290 38 7,201 2,282 2,312 3,337 850 453 3,874 8,085 5,074 953 5,447 10 4,018 36 36 53 13 7 61 128 80 15 86 22 2-5 1-5 1-4 1-4 1-4 1-4 1-4 2-5 1-5 14 1-5 1-4 521 451 418 604 154 82 701 468 587 209 671 255 2,572 1,114 611 865 151 56 1,050 2,257 1,279 331 1,656 266 0 0 199 199 -1 0 -1 0 t42 62 36 53 13 7 61 128 80 18 92 22 114 142 62 34 48I 3 58 125 71 18 92 15 99 0 0 199 Ventila$on 597 -4 Svstem 1 total 2.762 45,276 651 12,805 790 674 674 System 1 Main Trunk Size Vetocity: Loss per 100 ft,: Actual: 10x13 in. 747 ft.lmin 0.101 in.wg 790 596 24,000 Type: Model: lndoor Model: Erand: Efficiency: Sound: Capacity: Sensible Capacity: Latent Capacity: NaturalGas Furnace 95 AFUE 0 60,000 Btuh nla nla Standard Air Conditioner 16 SEER 0 24,000 Btuh 0 Btuh 0 Btuh This system's equipment was selected in accordance with AccA Manual s. ManualS equipment sizing data: SODB: 86F, SOWB: 62F, WODB: -2F, S|DB: 75F, SIRH: 40%, WDB: 72F, Sen. gain: 12,805 Btt'th, Lat. gain: 790 Btuh, Sen. loss: !S.ZlO-Q!yn, Entering clg. coil DB: 76F, Entering ctg. coitWe: SS.AF, E-ntering htg. coilDB: 65.2F, Clg. coilTD: 20F, Htg. coilTD: 70F, Req. clg. airflow: 674 CFM, Req. htj. ai-rflow: 651 CFM \\1 0.2.1 sz.la\pubtic . .. \J u tio Moreno ... -80-2024.rh9 Friday, November 1,2024, 1:32 pM