Loading...
HomeMy WebLinkAboutConditions of Permitc N F PERMIT BLRE-12-24-9020 Koby Kempel New Single-family dwelling w/ attached garage 2299 Elk Springs Dr, GWS Elk Springs, Los Amigos FLG B, Ph 1, Lot 5 1 ) ALL WORK SHALL COMPLY WITH THE 2015 INTERNATIONAL RESIDENTIAL CODE (I.R.C.) AND 2018 I NTERNATIONAL ENERGY CONSERVATION CODE (I.E.C.C.) 2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED "GARFIELD COUNTY BUILDING REOUIREMENTS". NUMBER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) ELECTRTCAL pERMtTTtNG AND TNSpECTTONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. 4) ALL EXTERIOR LIGHTING TO BE DOWNCAST AND SHIELDED. 5) WILDFIRE MITIGATION REOUIREMENTS: SHALL COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE RECOMMENDATIONS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT. OWNER BUILDER MAYALSO REFER TO SUBMITTED WILDFIRE REPORT FROM CARBONDALE & RURAL FIRE PROTECTION DISTRICT ON OCTOBER 15,2024, scanned into building file). 6) OPEN HOLE SOTLS REPORT rS REOUIRED AT FOOTING TNSPECTTON AND PRIOR TO ANY CONCRETE POUR. PROVIDE COPY OF GEOTECHNICAL ENGINEERS REPORT TO THE BUILDING INSPECTOR. 2,500 PSF soil bearing. lnclude compaction report lF any structural fill pertains. 7) PRE-ENGTNEERED ROOF TRUSSES. HAVE ENGINEERTNG FOR BUTLDTNG INSPECTOR AT TIME OF FRAME INSPECTION. B) ALL HtcH STRENGTH BOLTTNG AND FTELD WELDTNG REOUIRES SPECTAL TNSPECTOR. PROVIDE APPROVAL REPORTAT FRAMING INSPECTION. FIELD VERIFY IF APPLIES .. FIELD WELDING OPTION ON S5O2 STEELTYP DETAILS SHOWN ON PLANS. 9) A LOT TMPROVEMENT CERTTFTCATE, SEALED BY A COLORADO LTCENSED SURVEYOR, lS REOUIRED AT FOUNDATION INSPECTION TO VERIFY STRUCTURE IS IN COMPLIANCE WITH MINIMUM SETBACK REOUIREMENTS / BUILDING ENVELOPE. 10) BLOWER DOOR TEST tS REOUTRED. MUST SUBMTT BLOWER DOOR TEST REPORT TO GARFIELD COUNry COMMUNITY DEVELOPMENT DEPT. OFFICE PRIOR TO SCHEDULING FINAL BUILDING INSPECTION / C.O. FINAL 1 1) pRESCRtpTtVE PATH USrNG 2018 tECC TABLE R402j.2 rS CHOSEN FOR ENERGY COMPLIANCE OF THIS HOME. MANUAL S REPORT ALSO ATTACHED FOR REFERENCE. ALL NEW HOMES TO HAVE WHOLE-HOUSE MECHANICAL VENTILATION SYSTEM INSTALLED (2015 IRC TABLE m1507.3.3(1) AND (2) SHOWN ON COVER SHEET. \$ -.-Et\ $\ .\) N \. l$