HomeMy WebLinkAbout Conditions of Permit-Amended04.23.2024 AM EN DED LIST OF
CONDITIONS OF PERMIT
BLRE-O1-23-7955
Aaron Cordova
SINGLE-FAMILY DWELLING WITH ATTACHED GARAGE
603 Dry Park Rd, GWS
SPRINGRIDGE RESERVE, PH.2, LOT 4
1) ALL WORK SHALL COMply W|TH THE 2015 INTERNATTONAL RESIDENTIAL CODE
(r.R.c.)AND 2009 INTERNATIONAL ENERGY CONSERVATION CODE (l.E.C.C.)
2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED
IN THE ATTACHED "GARFIELD COUNTY BUILDING REOUIREMENTS". NUMBER
REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST.
3) ELECTRTCAL PERMtTTtNG AND TNSPECTTONS BY COLORADO STATE ELECTRIC
BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION.
ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION &
CERTI FICATE OF OCCU PANCY.
4) Wl LDFI RE MITIGATION REOUIREMENTS: COM PLY WITH WILDFIRE M ITIGATION
AND DEFENSIBLE SPACE REOUIREMENTS PER COLORADO STATE FOREST SERVICE
AND LOCAL FIRE DISTRICT.
5) puRsuANT TO ATTACHED RECORDED PLAT NOTE#6 -- AND A PROPOSED
BUILDING OVERALL FIRE AREA IN EXCESS OF 3,600 SOUARE FEET -- THIS
PROPERry SHALL INCLUDE A FIRE SUPPRESSION SYSTEM. FIRE SPRINKLER
ROUGH.IN INSPECTION APPROVAL IS REOUIRED BEFORE FRAMING INSPECTION.
FINAL FIRE SPRINKLER APPROVAL REOUIRED PRIOR TO BUILDING FINAL /
CERTIFICATE OF OCCUPANCY. (SEE ATTACHED DOCUMENTS).
6) OPEN HOLE SOILS REPORT lS REOUIRED AT FOOTING INSPECTION BY
GEOTECHNICAL ENGINEER. 1,200 PSF SOIL BEARING.
7) PRE-ENGINEERED ROOF TRUSSES HAVE ENGINEERING FOR INSPECTOR AT TIME
OF FRAMING INSPECTION.
8) DEFERRED SUBMITTAL DOCUMENTS: PROVIDE ENGINEER OF RECORD,S CHIMNEY
SUPPORT DETAIL FOR CUT STONE VENEER ABOVE ROOF AT TIME OF FRAMING
INSPECTION.
9l 04.23.2024 - REVTSED WORK SCOPE INCTUDES CHANGE FROM SCREENED lN
PORCH TO GTAZED AND HEATED HABITABLE IIVING. 267 SO FT SCREEN
PORCH SHATL NOW BE INCLUDED IN THE AMENDED FINISHED LIVING AREA
N
\L
\r
\-/
I
\
N
Ns
\t
\
t
Nl)
N
}..a
s
CALCULATTON OF 4,177 SO FT (W|TH RESULTING AMENDED TOTAT FIRE AREA
oF 5,881.50 SO FT).
PURSUANT TO CONDITION #5 AND RECORDED PIAT NOTE #6, THE AMENDED
FTOOR PLAN SHAtt REMAIN SUBJECTTO INSTATLING A FIRE SUPPRESSION
SYSTEM. AT THE TIME OF SUBMISSION OF PIAN REVISIONS ON APRIL 1 1,
2024, NO MAIN FRAMING TNSPECTION WAS CONDUCTED ON PREMISES.
GENERAL CONTRACTOR / SUB CONTRACTOR AND/OR FIRE.SPRINKTER SYSTEM
INSTATTERS REMAIN RESPONSIBLE TO VERIFY FIRE.SPRINKLER PIAN
CHANGES, IF ANY, AND ANY CHANGE IN USE OF SCREEN PORCH FROM
UNENCLOSED UNCONDITIONED TO ENCLOSED HEATED LIVING - COMPLY
WITH REOUIREMENTS OF THE FIRE MARSHAL AND LOCAL FIRE DISTRICT.
GENERAL CONTRACTOR IS ENCOURAGED TO HAVE THE FIRE MARSHAT SIGN
THE YELTOW INSPECTION CARD FOR ALt FUTURE ROUGH.IN SPRINKLER AND
FINAL INSPECTIONS.
04.23.2024 - FIELD VERIFY GAS FIREPIACE..IN THE NEWTY ENCLOSED
CONDITIONED PORCH TIVING AREA ON SHEETA3.1 - IS LISTED FOR
INSTATLATION IN AN INTERIOR TIVING SPACE AND INSTALLED PURSUANT TO
MANUFACTURER'S INSTRUCTIONS. VERIFY NO CHANGE IN FUEL TYPE AND
EOUIPMENT COMPLIES WITH STAMPED PLANS.