Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutConditions of PermitCONDITION OF PERMIT
BLRE-12-24-9023
ROARING FORK LAND & HOME
New 1,200 Accessory dwelling unit (ADU)w/ attached garage below
6533 CR 214, New Castle
21810420001 3
1 ) ALL WORK SHALL COMply W|TH THE 2015 TNTERNATIONAL RESTDENTIAL CODE (l.R.C.) AND 2018
I NTERNATI ONAL EN ERGY CONSERVATI ON CODE ( I. E.C.C.)
2) PROPOSED TMPROVEMENTS ARE SUBJECT TO ALL APPLTCABLE ITEMS CONTAINED lN THE
ATTACHED "GARFIELD COUNry BUILDING REOUIREMENTS". NUMBER REFERENCES NOTED ON
PLANS REFER TO SPECIFIC ITEMS ON THIS LIST.
3) ELECTRTCAL pERMtTTtNG AND TNSPECTTONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL
ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINALAPPROVAL IS
REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.
4) ALL EXTERTOR LTGHTING TO BE DOWNCAST AND SHIELDED.
5) WILDFIRE MITIGATION RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE MITIGATION AND
DEFENSIBLE SPACE RECOMMENDATIONS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE
DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COMMUNITY DEVELOPMENT WEBSITE FOR
ADDITIONAL I NFORMATION.
6) OPEN HOLE SOTLS REPORT tS REOUTRED AT FOOTTNG TNSPECTION AND PRIOR TO ANY CONCRETE
POUR. PROVIDE COPY OF GEOTECHNICAL ENGINEERS REPORT TO THE BUILDING INSPECTOR.
1,500 PSF soil bearing.
7) A LOT TMPROVEMENT CERT|F|CATE, SEALED BY A COLORADO LICENSED SURVEYOR, lS REOUIRED AT
FOUNDATION INSPECTION TO VERIFY STRUCTURE IS IN COMPLIANCE WITH MINIMUM SETBACK
REOUIREMENTS / BUILDING ENVELOPE.
8) SEPTIC SYSTEM REVIEW / APPROVALS: PRIOR TO BUILDING INSPECTION & CERTIFICATE OF
OCCUPANCY PROVIDE FINAL APPROVAUSIGN-OFF FROM GARFIELD COUNTY'S PUBLIC HEALTH
DEPT.
9) SEPARATE M|SC tNSPECT|ON rypE FOR STUCCO / LATH. SHALL KEEP WEATHER PROTECTED lF
INSTALLED DURING WINTER FREEZE CONDITIONS.
10) BLOWER DOOR TEST tS REOU|RED. MUST SUBMTT BLOWER DOOR TEST REPORT TO GARFIELD
COUNry COMMUNITY DEVELOPMENT DEPT. OFFICE PRIOR TO SCHEDULING FINAL BUILDING
INSPECTION / C.O. FINAL.
1 1) PRESCRIPTIVE PATH USING ATTACHED RESCHECK REPORT HAS BEEN CHOSEN FOR ENERGY
COMPLIANCE OF THIS HOME DESIGN. MANUAL J REPORT ALSO ATTACHED FOR REFERENCE.
ALL NEW HOMES TO HAVE WHOLE.HOUSE MECHANICAL VENTILATION SYSTEM INSTALLED (2015
IRC TABLE m1507.3.3(1)AND (2) SHOWN ON COVER SHEET.
,a
l_\
$
\N