Compliance Ceftificate
Project ROARING FORK LAND & HOME
Energy Code:
Location:
Construction Type:
Prqject Type:
Project SubType:
Orientation:
Conditioned Floor Area
Glazing Area
Climate Zone:
Permit Date:
Permit Number:
All Electric
ls Renewable
Has Charger
Has Battery:
Has Heat Pump:
2018 |ECC
New Castle, Colorado
Single-family
New Construction
None
Bldg. faces 9O deg. from North
3,1O9 ft2
6o/a
s (7313 HDD)
true
false
false
false
false
Construction Site:
6533 COUNTY ROAD 214
NEW CASTLE, CO 81647
Ceiling: Cathedral Ceiling
Wall: Wood Frame, 16" o.c.
Orientation: Front
Door: Solid Door (under 50% glazing)
Orientation: Front
Door 1: Solid Door (under 507o glazing)
Orientation: Front
Window: Vinyl Frame
Orientation: Front
OwnerlAgent:
ABIGAILJONES
ROARING FORK LAND & HOME
6809 COUNTY ROAD 21.4
NEW CASTLE, CO8L647
970-987-9027
DRTCHMONDJONES@GMAIL.COM
Designer/Contractor:
BRADJORDAN
JORDAN ARCHITECTURE INC
PO BOX 1031
GLENWOOD SPRINGS, CO 81602
970-618-6690
BRADJORDANARCHITECT@GMAIL.C
OM
\
a\
\$
\\.
S.
\qCompliance: 34.296 Better Than Code Maximum UA: 514 Your UA: 338
The 7o Better or Worse Than Code lndex reflects how close to compliance the house is based on code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home.
Slab-on-grade tradeoffs are no longer considered in the UA or performance compliance path in REScheck. Each slab-on-grade
assembly in the specified climate zone must meet the minimum energy code insulation R-value and depth requirements.
Envelope Assemblies
1,910
1,605
25
443
104
49.0
6.0
0.0
20.0
0.o22
0.034
0.350
0.150
0.280
0.026
0.060
0.300
0.300
0.300
50
62
B
133
31
42
35
9
66
29
Compliance: Passes using UA trade-off
Gross Area
or
Perimeter
Cavity
R-Value
Cont. Prop. Req.
R-Value U-Factor U-FactorAssembly UAUA
Prop. Req.
Project Title: ROARING FORK LAND & HOME
Data filename:
Report date: L2lO5l24
Page L of1-0
Cavity
R-Value
Cont. Prop. Req. Prop. Req
R-Value U-Factor U-Factor UA UA
Gross Area
Asserrtbly
Pe ri m eter
UI
Wall 1: Wood Frame, 16" o.c.
Ori€ntationi Left side
Window 1: Vinyl Frame
Orientation: Left side
Wall 2: Wood Frame, 16" o.c.
Orientation: Right side
Door 2: Solid Door (under 50% glazing)
Orientation: Right side
Window 2: Vinyl Frame
Orientation: Right side
Wall 3: Wood Frame, 16" o.c.
Orientation: Back
Door 3: Solid Door (under 50% glazing)
Orientation: Back
Window 3: Vinyl Frame
Orientation: Back
Floor: Slab-On-Grade (Unheated)
lnsulation depth: 2.5'
lnsulation position: Vertical lnsulation
3aa5 J aRD, - koz
847
10
850
24
34
r,244
24
132
230
s
6.0 20.o
6.0 20.0
6.0 20.0
10.0
0.034
0.280
0.034
0.350
0.280
0.034
0.350
0.280
0.510
0.060
0.300
0.060
0.300
0.300
0.060
0.300
0.300
0.540
28
3
27
8
9
37
8
37
0
50
3
48
7
10
65
7
40
0
Compliance Statement: The proposed building design described
calculations submitted with the permit application. The proposed
REScheck Version REScheck-Web and to comply with the
here is consistent with the building plans, specifications, and other
the 2O1B IECC requirements in
lnspection Checklist.
/2"1o, Z+
DateName -
Project Title: ROARING FORK LAND & HOME
Data filename:
Report date: L2lO5l24
Page 2 of10
REScheck Software Version : REScheck-Web
lnspection Checklist
Energy Code: 2018 IECC
Requirements: 0.0olo were addressed directly in the REScheck software
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Additional Comments/Assumptions:
Complles?Comments/Assumptlons
Sectaon
#
& Reo.lD
Pre-lnspection/Plan Review Plans Verlfied
Value
Field Verlfied
Value
103.1,
103.2
lPR1l1
1J,,
: Construction drawings and
i documentation demonstrate
,energy code comPliance for the
r building envelope. Thermal
: envelope represented on
; construction documents.
[complies
[Does Not
nNot observable
flNot Applicable
103.1,
r03.2,
403.7
lPR3l1
4.t'
i Construction drawings and
; documentation demonstrate
energy code compliance for
lighting and mechanical systems.
Systems serving multiple
dwelling units must demonstrate
.compliance with the IECC
: Commercial Provisions.
Complies
[Does Not
ENot observable'DNot Rpplicable
302.1,
403.7
lPR212
tl,
. Heating and cooling equipment
:sized perACCA Manual S based
'on loads calculated per ACCA
; Manual J or other methods
approved by the code official.
is i Heating:l Btu/ht._
r Cooling:
i Btu/hr_
nDoes Not
DNot Observable
ENot Applicable
Cooli n9:Btu/hr_
Heating:
Btu/h[_
res
3 Low I 3)1 (Tier 1)2 Medium
Project Title: ROARING FORK LAND & HOME
Data filename:
Report date: L2lO5l24
Page 3 ofi.0
402,r.,2
lFo1l1
'c)
i See the Env.elope..4se€m0r/eg
itable for values.
Slab edge insulation R-value.R-
Notn Unheated
L_.1 Heated
I Unheated
I Heated Observable
Applicable
402.L.2
lFo3ll
g
ft ft
iENot
itrruqt
iflooes I'tot
Observable
Slab edge lnsulation
depth/length.
See the Envelope Assemblies
table for values.
protective covering is installed
to protect exposed exterior
insulation and extends a
iminimum of 6 in. below grade.
I
Not
Observable
Applicable
ble
Observable
plies
Not
Additional Comments/Assumptions:
1 lmpact (Tier t)H Medium (Tier 2)3 (Tier 3)Low
Project Title: ROARING FORK LAND & HOME
Data filename:
Report date: L2lO5l24
Page 4 ofL0
Field Verified
Value Complies?Comments/Assumptions
Section
#
& Req.lD
Framing / Rough-ln lnspection Plans Verifled
Value
402.t,r,
402.3.1,
402.3.3,
402.5
lFR2l1
see the Envelope AssembliesDoor U-factor
table for values.
U-U-
U-U-
es
ot
nruot icable
See the Envelope Assemblies
table for values.
Glazing U-factor (area-weighted
average).
402.r.L,
402.3.4
lFR1l1 flNot observable
IComplies
EDoes Not
nNot observable
Itrtot Rpplicable
303.1.3
lFR4l1
':-".'
U-factors of fenestration products
are determined in accordance
with the NFRC test procedure or
taken from the default table.
lComplies
[Does Not
ENot observable
INot Applicable
402.4.r.r
lFR2311
Air barrier and thermal barrier
installed per manufacturer's
instructions.
IComplies
[Does Not
INot observable
nNot Applicable
402.4.3
lFR20l1
',.!,
Fenestration that is not site built
is listed and labeled as meeting
AAMA AA/DMA/CSA 101/r.S.2/A440
or has infiltration rates per NFRC
400 that do not exceed code
limits.
IComplies
lDoes Not
INot Observable
[ruot npplicable
lC-rated recessed lighting fixtures
sealed at housing/interior finish
and labeled to indicate <2.0 cfm
leakage at 75 Pa.
EComplies
[Does Not
lNot Observable
INot Applicable
402.4.5
lFR16l2
Supply and return ducts in attics
insulated >= R-B where duct is
>= 3 inches in diameter and >=
R-6 where < 3 inches. Supply and
return ducts in other portions of
the building insulated >: R-6 for
diameter >: 3 inches and R-4.2
for < 3 inches in diameter.
es403.3.1
lFR12l1 EDoes Not
ENot observable
[ruot npplicable
403.3.2
lFR13l1
li.cl
Ducts, air handlers and filter
boxes are sealed with
joints/seams compliant with
lnternational Mechanical Code or
lnternational Residential Code, as
[Does Not
INot Observable
nruot applicable
es
ble.
403.3.5
lFRlsl3
'.:';
Building cavities are not used as
ducts or plenums.
INot Observable
nNot Applicable
r3Low lm ct1lm(Tier 1)2 Medium lmpact (Tier 2)3
Project Title: ROARING FORK LAND & HOME
Data filename:
Report date: L2105124
Page 5 of10
Section
#
& Reo,lD
Framlng / Rough-ln lnspection Plans Verifled
Value
Field Verlfled
Value Complles?Comments/Assumptions
403.3.7
lFR2813
v.'
Ducts declared to be within the
conditioned space are either 1)
completcly within thc continuous i
air barrier and within the building'thermal envelope, 2) buried
within ceiling insulation in
accordance with Section
R403.3.6 and the air handler is
,located completely wlthln the i
continuous air barrier and within ,
the building thermal envelope
and the duct leakage is <: I.5 :
cfm / 100 square feet of,conditioned floor area served by ,
,the duct system, or 3) the ceiling I
, insulation R-value installed
against and above the insulated ;.duct >: to the proposed ceiling
insulation R-value, less the R-
value of the insulation on the
.EComplies
EDoes Not
nNot observableilNot Applicable
403.4
lFR1712
TJ
HVAC piping conveying fluids
above 105 sF or chilled fluids
below 55 sF are insulated to >R-
3.
R-R-lnComplies
;EDoes lvot
lIttot Observable
jINot Applicable
403.4.1
lFR24l1
1.r'
iProtection of insulation on HVAC
, piping.
UComplies ,
:Eooes Not :
LlNot Observable rrENot Applicabte ;
403.5.3
lFRlB12
1!/'
Hot water pipes are insulated to
>R-3.
R-R-rflComplies
nDoes Not
INot Observable
INot Applicable
403.6
lFR1912
Automatic or gravity dampers are
, installed on all outdoor air
intakes and exhausts.
'EComplies
,EOoes trtot
,nruot observable
,flNot Rpplicable
Additional Comments/Assumptions:
1 High lmpact (Tier 1)2 Medium lmpact (Tier 2)(Tier 3)3 Low I
Project Title: ROARING FORK LAND & HOME
Data filename:
Report date: L2lO5l24
Page 6 of10
Sectlon
#
& Reo.lD
lnsulation lnspectlon Plans Verified
Value
Field Verified
Value Complles?Comments/Assumptlons
303.1
ltN1312
v
All installed insulation is labeled
or the installed R-values
,provided.'nNot Observable
fltrtot
402.r.L,
402.2.5,
402.2.6
lrN3l1
t]',
Wall insulation R-value. lf this is
mass wall with at least % of the
wall insulation on the wall
exterior, the exterior insulation
requirement applies (FR10).
ai R-_
! Wood
! Mass
! Steel
R-[Complies
[Does Not
nNot observable
[ruot applicable
see fhe Envelope Assemblies
table for values.I wood
I Mass
I Steel
303.2
llN4l1
Wall insulation is installed per
ma nufacturer's instructions.
DComplies
;looes ttot
:ENot Observable
lEruot nppticable
Additional Comments/Assumptions :
1 High lmpact (Tier 1)2 Medium lmpact (Tier 2)3 Low lmpact (Tier 3)
Project Title: ROARING FORK LAND & HOME
Data filename:
Report date: L2lO5l24
Page 7 of10
Section
#
& Req.lD
Final lnspection Provlsions Plans Verified
Value
Field Verified
Value Complles?Comments/Assumptions
4O2.1.7, CeilinginsulationR-volue.
402.2.L,
402.2.2,
402.2.6
I Fl1]1 l
R-R-_
fl Wood
fl Steel
,see the fnve/ope Asserrrb/les
table for values.I Wood
I steet
t[Ooes trlot
LlNot Observable
tENot Applicable ,
303.1.1.1, :Ceiling insulation installed per
303.2,nranufacturer'sinstructions.lFl2l1 Blown insulation marked every
300 ftr.
flComplies
;flOoes trtot
,fltrtot Observable:INot Applicable
Vented attics with air permeable
insulation include baffle adjacent
to soffit and eave vents that
: extends over insulation.
,EComplies
:Eooes ruot
,ENot observable
l[ruot npplicable
442.2.3
aFt22l2
,Attic access hatch and door
insulation >R-value of the:adjacent assembly.
;ICompliesrlDoes Not
iIltot observable
[ruot applicable
R.R-402.2.4
lFl3l1
:Blower door test @ 50 Pa. <=5
lach in Climate Zones 1-2, and:<:3 ach in Climate Zones 3-8.
lEDoes Not
lElrtot Observable
;INot Applicable
ACH 5O:lCompliesACH 50: j402.4.L.2
lFt1711
Ducts are pressure tested to
determine air leakage with
: cithcr: Rough-in test: Total
,leakage measured with a
:nrpssrtre differential of 0.1 inch
w.g. across the system including
the manufacturer's air handler
enclosure if installed at time of
; test. Postconstruction test: Total
;leakage measured with a
:pressure differential of 0.1 inch
cfm/100
: ftr-cfm/100
ft2
w.9. across the entire system
including the manutacturer's air
handler enclosure.
403.3.3
TFI271L
tflComplies
[ooes Not
;nruot Observable
;flNot npplicante
;Duct tightness test result of <:4 ,
cfm/100 ft2 across the system or<:3 cfm/100 ft2 without air I
handler @ 25 Pa. For rough-in
tests, verification may need to
cfm/100 cfm/100ftt-
[ruot npplicable
'occur
plies403.3.4
lFt4li ,EOoes Irlot
flNot Observable
4O3.3.2.I ,Air handler leakage designated
lFl24l1 ,by manufacturer at <=2o/o of
design air flow.
LComplies
;[Does Not
flNot Observable
lNot npplicable
Complies
nComplies
code
403.1.1
lFtet,
403.r.2
trr ruJ-
'Heat pump thermostat installed
on heai pumps.ilooes Not ;
[Not Observable ;
tDNot applicable
EDoes Not
ENot Observable
nNot Applicable
Programmable thermostats
installed for control of primary
healirrg and cuulirrg syslerrrs and
initially set by manufacturer to
Circulating seryice hot water
systems have automatic or
accessible manual controls.Not
403.5.1
lFr r 112
:ENot Observable
[ruot npplicable
1 High lmpact (Tier 1)2 Medium lmpact (Tier 2)3 Low lmpact (Tier 3)
Project Title: ROARING FORK LAND & HOME
Data filename:
Report date: I2lO5/24
Page 8 of1-0
Section
#
& Reo.lD
Fanal lnspection Provasions Plans Verified
Value
Field Verified
Value Complles?Comments/Assumptions
403.6.1
tFl2512
All mechanical ventilation system
fans not part of tested and listed
HVAC equipment meet efficacy
and air flow limits per Table
R403.6.1.
EComplies
lDoes Not
INot observable
nruot npplicable
403.2
IFt26l2
Hot water boilers supplying heat
through one- or two-pipe heating
systems have outdoor setback
control to lower boiler water
temperature based on outdoor
temperature.
nComplies
[Does Not
ENot Observable
[ruot applicable
403.5.1.1 Heated water circulation systems
lFl28l2 have a circulation pump. The
system return pipe is a dedicated
return pipe or a cold water suPPlY
pipe. Gravity and thermos-
syphon circulation systems are
not present. Controls for
circulating hot water system
pumps start the pump with signal
for hot water demand within the
occupancy. Controls
automatically turn off the PumP
when water is in circulation looP
is at set-point temperature and
no demand for hot water exists.
flcomplies
EDoes Not
flNot Observable
lruot npplicable
403.5.1.2
IFt29l2
Electric heat trace systems
comply with IEEE 515.1 or UL
515. Controls automatically
adjust the energy input to the
heat tracing to maintain the
desired water temperature in the
piping.
EComplies
flDoes Not
INot Observable
INot Applicable
403.s.2
lFr30l2
Demand recirculation water
systems have controls that
manage operation of the pumP
and limit the temperature of the
water entering the cold water
EComplies
[Does Not
'ENot observable
ENot Applicable
to <= 104eF
403.5.4
lFt31l2
Drain water heat recovery units
tested in accordance with CSA
855.1. Potable water-side
pressure loss of drain water heat
recovery units < 3 psi for
individual units connected to one
or two showers. Potable water-
side pressure loss of drain water
heat recovery units < 2 psi for
individual units connected to
three or more showers.
EComplies
EDoes Not
ENot observable
ENot Applicable
404.1
lFt6ll
gOVo or more of Permanent
fixtures have high efficacy lamps.
lComplies
EDoes Not
INot observable
Druot Applicable
404.1.L
lFr2313
Fuel gas lighting systems have
no continuous pilot light.
EComplies
EDoes Not
INot Observable
[ruot Applicable
401.3
lFl712
Compliance certificate posted UComplies
[Does Not
INot Observable
[ruot npplicable
1 High lmpact (Tier 1)2 Medium lmpact (Tier 2)3 Low lmpact (Tier 3)
Project Title: ROARING FORK LAND & HOME
Data filename:
Report date: 72105124
Page 9 of10
hove bqen provlded.
and water heating
Additional comments/Assumpff ons!
ProjeetTitle: ROARING FORK LAND & HOME
Data filename:
Report date: L2lo5l24
Page 10 of10
fr 2018 IECC Energy
Efficiency Ce rtificate
Above-Grade Wall
Below-Grade Wall
Floor
Ceiling / Roof
Ductwork (unconditioned sPaces):
26,OO
o.oo
10.oo
49.OO
o.28
o.15
Heating System
Cooling System:-
Water
Name: Date:
Comments
Window
Door
R-Valuelnsulation Rating
Glass & Door Rating U-Factor SHGC
EfficiencyHeating & Cooling EquiPment