BLCO-12-24-9039
NUTRIENT FARMS
CONVERT OFFICE MFG. BUILDING INTO A FARM STORE
9108 COUNTY ROAD 335, NEW CASTLE
1) THE APPROVED PLANS ARE TO BE ON -SITE FOR INSPECTIONS.
2) SANITARY FACILITIES ARE REQUIRED TO BE PROVIDED FOR WORKERS.
3) A LIST OF REQUIRED INSPECTIONS WILL BE ATTACHED TO THE PLANS. THE STATE IS TO PERMIT
AND APPROVE THE ELECTRICAL WORK.
HTTPS://WWW.COLORADO.GOWPACIFIC/DORA/DPO ELECTRICAL PLUMBING PERMITS
4) UNDERGROUND UTILITY LOCATES IS THE RESPONSIBILITY OF THE OWNER OR CONTRACTOR.
811 IS THE COLORADO UTILITY LOCATE HOT LINE.
5) SEPARATE SIGN PERMITS ARE REQUIRED FOR ANY EXTERNAL SIGNS. PLEASE CONTACT THE
COUNTY PLANNER FOR THE APPLICATION.
6) ELECTRICAL CODE COMPLIANCE WILL BE DETERMINED BASED ON FIELD INSPECTIONS
PERFORMED BY THE STATE ELECTRICAL INSPECTOR, (303) 869-3458. PLEASE HAVE THE
INSPECTOR SIGN THE BUILDING CARD OR PROVIDE WRITTEN DOCUMENTATION OF THE
INSPECTIONS.
7) GEOTECHNICAL OBSERVATION IS REQUIRED WHEN THE EXCAVATION IS COMPLETE AND
WRITTEN VERIFICATION BE SUPPLIED AT FOOTING INSPECTION, 2000PSF.
8) ALL EXTERIOR LIGHTING IS TO BE DOWNCAST AND SHIELDED. THIS INCLUDES THE SIGN
LIGHTING.
9) ALL ACCESSIBLE DOOR HARDWARE SHALL HAVE A SHAPE THAT IS EASY TO GRIP, INCLUDING
POCKET AND SLIDING DOORS. (ANSI A117.1 - 404.2.6)
10)ANY EXPOSED FOAM IS TO BE COVERED WITH AN IGNITION BARRIER OR A THERMAL BARRIER
BASED ON LOCATION. (IRC R316)
11)A STATE CERTIFIED MANUFACTURED HOME INSTALLER IS TO MOVE THE BUILDING AND
INSTALL AN INSIGNIA APROVING THE INSTALLATION OR A 3RD PARTY STATE CERTIFIED
INSPECTOR IS TO PERFORM THE INSPECTION AND INSTALL THE INSIGNIA.
12)THE ACCESSIBLE ROUTE FROM THE PARKING AND TO THE ACCESSIBLE RESTROOMS ARE TO BE
COMPLETE FOR THE FINAL INSPECTION.
13)CALL FOR A PARTIAL FRAMING INSPECTION OF THE FLOOR JOIST PRIOR TO INSTALLING THE
SKIRTING. THE INTERIOR FRAMING AND SIGNAGE FRAMING WILL BE INSPECTED AFTER THE
ELECTRICAL IS SIGNED OFF BY THE STATE.
14)THE ENTRY DOOR IS INCREASING IN WIDTH. PLEASE HAVE A HEADER SPECIFIED BY THE
STRUCTURAL ENGINEER AT FRAMING INSPECTION.
15)CALL FOR AN UNDERGROUND INSPECTION OF THE SEWER LINE AND PROPANE LINE PRIOR TO
BACKFILLING THE TRENCH