Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLCO-01-25-9056 BATTLEMENT MESA GOLF COURSE FREEZER ENCLOSURE WITH STORAGE 3930 NORTH BATTLEMENT PARKWAY 1) THE APPROVED PLANS ARE TO BE ON -SITE FOR INSPECTIONS. 2) SANITARY FACILITIES ARE REQUIRED TO BE PROVIDED FOR WORKERS. 3) A LIST OF REQUIRED INSPECTIONS WILL BE ATTACHED TO THE PLANS. THE STATE IS TO PERMIT AND APPROVE THE ELECTRICAL WORK. HT-FPS://WWW.COLORADO.GOV/PACIFIC/DORA/DPO ELECTRICAL PLUMBING PE RMITS 4) ELECTRICAL CODE COMPLIANCE WILL BE DETERMINED BASED ON FIELD INSPECTIONS PERFORMED BY THE STATE ELECTRICAL INSPECTOR, (303) 869-3458. PLEASE HAVE THE INSPECTOR SIGN THE BUILDING CARD OR PROVIDE WRITTEN DOCUMENTATION OF THE INSPECTIONS, 5) ANY EXPOSED FOAM IS TO BE COVERED WITH AN IGNITION BARRIER OR A THERMAL BARRIER BASED ON LOCATION. (IRC R316) 6) MINIMULLY THE ICE SHIELD IS TO BE INSTALLED AT THE EAVES TO A MINIMUM 24" UP FROM THE INSULATED WALLS. 7) ENGINEER STAMPED TRUSS DRAWINGS ARE REQUIRED TO BE PROVIDED TO THE INSPECTOR AT FRAMING INSPECTION. 8) PER 2015 IBC 1809.5 EXCEPTION 2 THE FOOTING NEED NOT BE TO FROST DEPTH.