HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLCO-01-25-9056
BATTLEMENT MESA GOLF COURSE
FREEZER ENCLOSURE WITH STORAGE
3930 NORTH BATTLEMENT PARKWAY
1) THE APPROVED PLANS ARE TO BE ON -SITE FOR INSPECTIONS.
2) SANITARY FACILITIES ARE REQUIRED TO BE PROVIDED FOR WORKERS.
3) A LIST OF REQUIRED INSPECTIONS WILL BE ATTACHED TO THE PLANS. THE STATE
IS TO PERMIT AND APPROVE THE ELECTRICAL WORK.
HT-FPS://WWW.COLORADO.GOV/PACIFIC/DORA/DPO ELECTRICAL PLUMBING PE
RMITS
4) ELECTRICAL CODE COMPLIANCE WILL BE DETERMINED BASED ON FIELD
INSPECTIONS PERFORMED BY THE STATE ELECTRICAL INSPECTOR, (303) 869-3458.
PLEASE HAVE THE INSPECTOR SIGN THE BUILDING CARD OR PROVIDE WRITTEN
DOCUMENTATION OF THE INSPECTIONS,
5) ANY EXPOSED FOAM IS TO BE COVERED WITH AN IGNITION BARRIER OR A
THERMAL BARRIER BASED ON LOCATION. (IRC R316)
6) MINIMULLY THE ICE SHIELD IS TO BE INSTALLED AT THE EAVES TO A MINIMUM 24"
UP FROM THE INSULATED WALLS.
7) ENGINEER STAMPED TRUSS DRAWINGS ARE REQUIRED TO BE PROVIDED TO THE
INSPECTOR AT FRAMING INSPECTION.
8) PER 2015 IBC 1809.5 EXCEPTION 2 THE FOOTING NEED NOT BE TO FROST DEPTH.