Loading...
HomeMy WebLinkAboutPreliminary Geotech Engineering Investigation 10.07.24ffi GTLITHOMPSON :,N ,,i',r;:! .: , ?. October 7,2024 KBBS Holdings, LLC 248 Skipper Drive Carbondale, CO 81623 Attention: Kara Byrne Subject:Preliminary Geotechnical Engineering lnvestigation Lookout Mountain Wedding & Events Center Parcel No.218512402034. Garfield County, Colorado CTLIT Project No. GS06903.000-115 CTLlThompson, lnc. (CTLIT) completed a preliminary geotechnic_af _elgjneering investigation for Lookout Mountain Wedding & Events Center on Parcel 218512402034 in Garfield County, Colorado. The geotechnicalengineering opinions and preliminary recommendations in this letter are to provide the client with information to assist with planning for the proposed buildings. A design-level geotechnical engineering investigation should be performed'to finalize reCommendations for the buildings after civilengineering and architectural plans are available. The investigation woutd include excavating several additionalexploratory pits at specific building locations. Site Conditions The Lookout Mountain Wedding & Events Center is proposed on Parcel No. 218512402034, which is located on the east end of Lookout Mountain in Garfield Gounty, Colorado. The property is a 40-acre parcelthat is accessed from Lookout Mountain Road (County Road i2O) ontne south flank of the mountain. A vicinity map with. the.location of the iit" ir included as Figure 1. The property is on a localized, topographic ridge that trends down to the southeast. The county road passes through the property with a switch-back tum that contours around the ridge. An aerial photograph of the property is shown on Figure 2. An old gravel pit is in the southeast part of the propefi. The pit is accessed by an existing, unimpioved driveway from the county road. An abandoned wellhead is west of the gravel-pit neai the end of the driveway. Vegetation on the property is predominantly thick 6am6el Oak with undergrowth of Big Sagebrush and native grasses. Ground surface elevation within the proposed development areas range between 8440 feet and 8400 feet. Naturalground along the;idg'e within the aiea of the proposed buildings generally slopes down to the southeast at grades between 5 and 15 Percent. Prooosed Gonstruction CTLIT was provided with a conceptual master plan for the Lookout Mountain Wedding & Events Center that was prepared by The Land Studio (dated August 7,2O24r. A cluster of ten, tiny homes is proposeO bn ine ridge in the northwest part of the property. We understand the tiny nomes wiil O6 one-story, pre-manufactured buildings placed on cast-in-place foundations' A pr"liminary plan provided to us (dated September 17,2A241indicates that a concrete patio and CTllThompsglt. lnc. f)enver Forf Cnllins Colorado Snrinas Glenwood Snrinos Pttehlo Srlmmif Collntu - Colnrado ffi Site Geolosy As part of our preliminary geotechnicalengineering investigation, we reviewed geologic mapping Uy tne Colorado Geologicat Survey (CGS) titled, "Geologic Map of the Glenwood Springs Ouadrangle, Garfield Gounty, Colorado", by Kirkham, Streufert, Cappa, Shaw, Allen "nO d"nroeder (dlted 20Og). The mip indicates the localized, topographic ridge in the area ol the proposed development is underlain by bedrock of the Miocene Epoch (Neogene Period) that is derived from flows of basalt, basaltic andesite, and trachybasalt. The geologic mapping indicates the basaftic bedrock is underlain by bedrock of the Maroon Formation (Permian and Pennsylvanian Periods). The Maroon Formation is mainly reddish-brown sandstone, congtomerate, mudstone, siltstone, and claystone. Subsurface information from our exptoratory pits indicates the basaltic bedrock is not present above the Maroon Formation bediock in tire proposed development areas at the site. The map indicates the bedding in the Maroon Formation dips down to the southwest at an angle of about 23 degrees. tnis is generally unfavorable from a large-scale, slope stability standpoint. Several faults are below and adjacent to the subject parcel. The fautts are generally parallelwith the localized, topographic iidge. We believe these faults are generally inactive' The gravel pit on the property is indicated on the geologic map. The map does not indicate significant hazards on the property. Preliminarv Subsurface lnvestisation For our preliminary geotechnical engineering investigation, subslrface conditions at the site were investigated ny bnserving excavaiion of four exploratory pits. Two exploratory ptq !lP- 1 and TP-z')were excavated in the proposed area of the tiny homes and two pits (TP-3 and.TP- 4) were exiavated nearthe proposid events building. The pits were excavated with a trackhoe on September 11 ,2024 at the approximate locations shown on the attached Figure 3. Exploiatory excavation operations were directed by our engineer who logg^ed conditions encountered in the pits and obtained representative samples of the soils. Summary logs of subsurface conditions found in our exploratory pits are included as Figure 4- Subsoils found in our exploratory pits, TP-1 and TP-2, generally consisted of about 6 to 12 inches of topsoil, underlain by 4.5 to Tfeet clayey sand and sandy clay that is interbedded with clayey gravet. Sandstone bedrockwas encountered at depths of 5 t9I feet The hardness of the uiaiok in Tp-1 and Tp-2 made excavation deeper than 6 inches into the sandstone not practical. Subsoils found in our exploratory pits, TP-3 and TP4, generally consisted of about 6 inches of topsoil or 2.Sfeet of fiil and 6 inches of clayey sand, underlain by 6 to 8 feet of silty gravel. Sandstone bedrock was encountered at a deplh of I feet in TP-3. The hardness of the bedrock made excavation deeperthan 6 inches into the sandstone not practical- stainray will be constructed at the entrance of each tiny home. An events building is proposed nearthe abandoned wellhead- Plans have not been developed for the building. Development will include construction of a new access road and parking areas. The proposed development is shown on Figure 3. KBBS HOLDINGS, LLC Page 2 ot 6 ffi Observations during excavation indicated the clayey sand is medium dense, the sandy clay is stiff, the clayey gravel and silty gravel are dense, and the sandstone is very hard. Groundwater was not encountered in our exploratory pits at the time of excavation. The pits were backfilled immediately after exploratory excavation operations were completed. Soil samples were returned to our laboratory where typical samples were selected for pertinent testing. Laboratory testing included gradation analysis and Atterberg limits. Gradation test results are shown on Figures 5 and 6. Results of laboratory testing are summarized in Table l. Earthwork Excavations Our subsurface information indicates that excavations in the overburden soils at the site can be made with conventional, heavy-duty excavation equipment. Excavations into the bedrock will be difiicult and could require a hoe ram aftachment on a trackhoe. From a 'trench safety' standpoint, sides of excavations must be sloped or retained to meet local, state, and federal safety regulations. The overburden soils at this site will likely classiff as Type B and Type C soils, based on OSHA standards governing excavations. The sides of temporary excavations deeper than 5 feet, and above groundwater, should be no steeper than 1 to 1 (horizontal to vertical) in Type B soils and 1.5 to 1 in Type C soils. Groundwater seepage into excavations can cause slumps and sloughing and the need forflatter slopes. Contractors are responsible for site safety and providing and maintaining safe and stable excavations. The contracto/s gualified person should identifu the soils encountered in excavations and ensure that OSHA standards are met. Our experience in similar geology and topography in the area indicates the upper soils may become saturated during snowmelt in spring and early summer months. Groundwater seepage could be encountered in foundation excavations during these months. Subexcavation and Struetunl Fill Footing foundations will be appropriate for buildings construcled at the site. A slab-on- grade floor is a reasonable alternative for the events building. However, the natural soils at this site are relatively heterogeneous. To create more uniform support conditions and reduce the potential for differential building movement, the soils below footings and floor slabs will need to be subexcavated to a depth of about 2feet and replaced with densely compacted, structural fill. We judge that the structural fill can consist of the excavated soils, provided they are free of rocks largerthan 4 incfies, organics, and debris. The potentialfor differential movement, and recommendations for mitigation, will need to be addressed for each building during a design- level geotechnical investigation. Foundation Wall Backfill Proper placement and compaction of foundation wall backfill is important to reduce infiltration of surface water and settlement from consolidation of backfill soils. This is especially important for backfill areas that will support concrete patio slabs and stairs. The soils excavated KBBS HOLDINGS, LLC I nn yna r la^l liaTl tll larEh^lra^ o Flrtlata ^f ra?F6 Page 3 of 6 ffi from the site can likely be used as backfitl, provided they are free of rocks larger than about 4- inches in diameter, organics, and debris. Anticipated Buildinq Foundations The naturalsoils atthe site are relatively heterogeneous. We judgethese soils are generally suitable for support of footing foundations, but variable support condilions exist. To ireate more uniforyn support conditions and reduce the potential for differential building movement, we anticipate that subexcavation of the soils to a depth of about 2teet below footings will be needed. The subexcavated soils will need to be replaced with densely compicted, structuralfillas discussed in the Subexcavation and StructuralFillsection. We expec-t an allowable bearing pressure of less than 3,000 psf for footings on the structuralfill. A design-level geotechnicalengineering investigation should be performed to develop recommendations for the buildings after civil engineering and archite,ctural plans are developed. This would include excavating additionalexploratory pits at specific building locations. Slab-On-Grade Construction Plans indicate that a concrete patio and stairway are planned for each tiny home. Plans for the events building have not been developed. The soils at the site are heterogenous with variable slab support characteristics. We anticipate that concrete slabs and struc'tures can be utilized, provided'the soils below these elements are subexcavated to a depth of about Zfeet. The subexcavated soits will need to be replaced with densely compacted, structural fill. ln general, we expect slab-on-grade construction will perform well at this site, provided proper design and construction methods are utilized. Recommendations for slab-ongrade construction wiil neeA to be developed for the buildings after civil engineering and architectural plans are developed. Additional subsurface investigation will be required as part of the design- level geotechnical engineering investigation. Subsurface Drainage KBBS HOLDINGS, LLC Our experience in similar geology and topography in the area indicates the upper soils _ become saturated during snowmelt in spring and early summer months. The extent and rate of seepage will fluctuate thioughout the year, and local perched groundwater can developduring times 6f neavy precipitationbr seasonal snowmelt and runoff. Frozen ground during spring runoff can alsb creaie a perched condition. These conditions can cause wetting of foundation soils, hydrostatic pressuies on below-grade walls, and wet or moist conditions in belowgrade areas, such as crawl spaces. To mitigate problems associated with groundwater seepage and infiltration of surface water into foundation backfill soils, foundation drains should be anticipated around the perimeters of belowgrade areas of the buildings. The drains should discharge via positive gravity oulets or ;gad to sump pits where water can be removed by pumping. Additionaldetails ior tn6 drain systems will need to be developed for the buildings during the design{evel geotechnical engineering investigation- t A atAa t| tt^t arat i ala Page 4 ot 6 ffi Surface Drainaqe Surface drainage is criticalto the performance of building foundations, floor slabs, and structural components. lnfiltration of surface water into the backfill soils adjacent to a building can increase the potentialfor movement of the structure. Site grading adjacent to the buildings should be designed and constructed to rapidly convey surface water away from the buildings in alldirections. We recommend the buildings be provided with gutters and downspouts. Roof downspouts should discharge well beyond the limits of allfoundation backfill soils. Landscaping should be carefully designed and maintained to minimize irrigation near foundation walls. Goncrete Concrete in contact with soil can be subject to sulfate attack. Our subsurface information in the area of the site indicates the soils have water-soluble sulfate concentrations of less than 0.10 percent. As indicated on the table below, ACI 318-19 states the sulfate exposure class is Not Applicable or 50. SULFATE EXPOSURE CTASSES PER ACI 318.19 A) Percent by mass in soildetermined by ASTM C1580 For this level of sulfate concentration, ACI 318-19 Code Requiremenfs indicate there are no cement type requirements for sulfate resistance- Limitations Our exploratory pits provide a preliminary characterization of subsurface conditions in the areas of the proposed tiny homes and events building. Variations in the subsurface conditions not indicated by the pits will occur- The geotechnicalengineering opinions and preliminary recommendations in this letter are to provid--e the client with information to assist with planning for the proposed buildings' A design-level geotechnical engineering investigation should be performed to fi nalize recoirmendaiions for the buildings after civil engineering and architectural plans are available. The investigation would include excavating severaladditionalexploratory pits at specific building locations. We believe this preliminary geotechnicalengineering investigation was conducted with that level of skill and care ordinarily used by geotechnical engineers practicing under similar conditions in the locality of this project. No waranty, express or implied, is made. We are available to discuss the contents ol this letter. Please contact us if you have questions or need additional information. KBBS HOLDINGS, LLC ' Water:Soluble Sulfate, (SOr) in SoilA (o/ol Exposure Classes < 0.10s0NotApplicable 0.101o 0.20slModerate lo 2.00s2Severe s3 > 2-OOVerv Severe a A61td, al lan I aaa? a rra trrFhhlal^ o Ft 'F't-^ Page 5 of 6 o. 38298 ffi GTLITHOMPSON, I D Reviewed by: Division MaEng Attachments: Figure 1 Figure2 Figure 3 - Aerial Photograph - Proposed Development Figure 4 - Summary Logs of Exploratory Pits Figures 5 and 6 - Gradation Test Results Table l- Summary of Laboratory Testing Map KBBS HOLDINGS, LLC Page 6 of 6 ffi o 10(t0 20(x' SCATE l- - 2OlJf)' KIBS tpl.Dll€s, LLtC LCTI(CT'T M'IINTAIN Ti'HIilrl ATTrl FN'FNIB (IFNTFP SATELLITE IMAGE FROM MAXAR (coPYRGHr 2024) NOTE: Viclnlty It--- ffiLEGEND: TP-l APPROXIMATE LOCATION OF I EXPLORATORY PIT NOTE:o r50 5oo SCALB 1'- 5@' PARCEL BOUNDARY SATELUTE IMAGE FROM GOOGLE EARTH (DATED JULY 19, 2023) Aerial TP_1 TP-2 TP_3 TP-4 (cR 120) KBBS Hcx.oIt\lGIS, LI.c Loor(our uourintru WEDDING AilD arENTs cENTER Dlralaararlh LEGEND: TP-l APPROXIMATE LOCATION OF I DPLORATORY PIr NOTE: tr o SALg l- - JOd BASE DRAWING BY fiE IAND STUDIO, INC. DATED AUGUST 7, 2024. Proposed t0 TP-w-?, TP-3 w*4 KBSHoBrst U,.C lml(grT uclrirfrN wEF[tE AlD hrENrg cEttlfEB Fla.rrrla*narJ' tl--l I Y-Z 15 TOPSOIL, SAND, CLAYEY, MOIST, DARK BROWN. FILL, GRAVEL, SAND, COBBLES. CI3YEY' MEDIUM DENSE, MOIST, DARKBROWN. CLAYEY SANDAND SANDY CTAY, MEDIUM DENSE OR STIFF, MOIST, RUST, BROWN. (sc, cL) GRAVEL. CLAYEY, SANDSTONE COEBLES AND BOULDERS, ANGUI.AR. DENSE, MOIST (GC). GRAVEL, SILTY, WEATHERED CONGLOMERATE, DENSE, MOIST. TAN, YELLOW, BROWN. (GM) SANDSTONE BEDROCK, VERY HARD, MOIST. RUST. r r-o lrl INDICATES BULK SAMPLE OBTAINED FROM EXCAVATED SOILS. :ffir 00 55 FullrlIL IFclljo Ful UJt! IFo- EIo 1o 15 LEGEND: F KBES HOLTXNGS, LtC t tlrlrnr rllnt rlrilN ufftln t FElrc ntlffi INDICATES DEEPER EXCAVATION NOT PRACTICAL DUE TO HARD BEDROCK. NOTES: 1. THE PITS WERE EXCAVATED WIT}I A TRACKHOE ON SEPTEMBER 11,2A24. THE PITS WERE BACKFILLED IMMEDIATELY AFIER EXPLORATORY EXCAVATION OPERATIONS WERE COMPLETED. 2. GROUNDWATER WAS NOT ENCOUNTERED IN THE EXPLORATORY PITS DURING THIS INVESTIGATION' 3. THESE LOGS ARE SUBJECT TO TTIE EXPIAMTIONS, LIMITATIONS, AND CONCLUSIONS CONTAINED IN THIS LETTER. Summary Logs of Exploratory Pits T E w E aaYA w n ffi GRAVELSANDS COARSE cosst-EsCOARSFINEFINEMEDIUMcr-AY (Pr-ASnC) TO SILT (MIN-PIASTI0) A}IALYSISAT{ALYSlS; cllrl ?Flrlc. F2ulotu,o. 970o $eoFz. 850E,l,lc40 76.2 127 200 152 I 0 80 90 100 30 20 t0 9.52 19.1 36.1.001 o.qrz .qr5 .mo .019 .037 100 CLEAR SOTJARE OPE {II{GS 3rr U.S. STANDARO SERIES .'ro0 '5ll'40'3{l '16 '10'8 TIMEREATINAS 60lllN. 19il11,1. 4MlN. 'l tllN. ?ln 0 10 20 30 40 50 e0 70 .o71 .149 ."*o.or.* 1.19 2'O Lgg 4-76 DruETEROF PARTICIE IN MITI.IMEIERS 25HR.7HR a5 li[N. t5 MlN. Somple of clay SANDY From TP-1AT7FEET Somple of SAND,CLAYEY (SC) From TP-2AT4FEET KBBS HOLDINGS, LLC LOOKOUT iIOUNTAIN WEDDING AND EVENTS CENTER PROJECT NO. GS06903.000-ll5 GRAVEL ls olo sllracGV &o/o PTAST|CITY lnOex - GRAVEL 31 olo SILT & CLAY 30 o/o PTASTICITYINDEX SAND 19 o/o LIQUID LIMIT 28 o/o 5 o/o SAND 39 o/o LnurdarMlT % Gradation Test Results GRAVELSAilDS COARSE coEErEsCOARSFlNErlED|UMFINEcl.AY (PTASTIC) TO SILT (NOI$PrASnc) -//- ----1- 1(xt s0 80 9toz.6 F", 850e.ulqro 3{' m 10 0 50 60 MtN. 19lltN. 4 MlN. t illN. '200 10 20 30 70 80 90 100 s.52 19.1 3O.1 n., '1u"*.001 0.0(n .(n5 .m9 .019 .Gl? CIEARSOT'ARE OPENIN(iS 3rr gt4. 1W 3" 5'A U.S. STANDARD SERIES '1(x)-50.,{}'30.16.1o.8 .o74 .149 .*oor.* 1.19 2.O 2.* 1.76 ONilEIER OF PARTICLE IN TIILLIiffiTERS ZSHR. TilR 45utN. r5MlN. FIG,5 ffi GRA\,EI-SANDS CdRSE cosStEsCOARSFI}IEMEDIT.IIIFINECLAY (PIAST|C) TO SILT(M)ttlflAsTlC) ANALYSIS clul =fut, 2706 $oo 1n mo 152 90 10 m 1(n 70 80 m 100 30 m 10 0 0.52 r9.1 36.1 762.mr 0.qI2 .(xE .ms .otg .037 5|ar$TAI'IDARD SERIES CTEAR SQUARE OPENI'.GSIT'E READINGS 60 MrN. 19 MrN. a MlN. 1 MlN. 'm0 .o71 ,tils .*o.o'* 1-19 LO L* 1-78 O'AMEIER OF PARTICIE lN MITIIMETERS 'r0o 50'40'30 '16 '10'825HR. 7HR. 45MlN. 15MlN. Somple of _eB _vE-L, t!!T.Y_(qM)FTom TP-3ATsFEET Somple of eRRvel,SILTY (GM) From TP-4AT6FEET KBBS HOLDINGS, LLC LOOKOUT IIOUNTAIN WEDDING AND EVENTS CEI'ITER PROJECT NO. GS06903.000-115 GRAVEL 69 % slLr a cLAV io "t" PIASTICITY IHOCX SAND 21 o/o o/o oh LIQUID LIMIT SAND 22 olo Lnu|DaaMli ofi' -- o/o GRAVEL SILT & CLAV PLASTICITY INDEX 71 o/o 7 o/o Gradation Test Results GRAVELSANDS coARs€COBEIESCOARSFll,lEIGDIUMFINECLAY (PLATSTE) TO SILT (ltlOl$PUSnC) 1(x) 90 80 (go z.6h F2p G.ul04o 30 20 10 -----t- _4 -t- - - J-- t0 3{' 1fi! 0 1n 2@ 152 5{' 60 70 80 s-az 19.1 36.1 76.2.00r o.qt2 .005 .fltg .010 .037 Th,E CLEAR SOUARE OPENINGS 3rr 3l1P 1t/i f 5'eU.S. STANDARD SERIES -r00 '50'40'3{l '16 '10'8 .o71 .1.t9 .*o.or.* 1-ts 2'0 2'3'i 4'76 DNMETER OF PARTICLE IN MILLIMEIERS qtMfi{. tgUlN. ,lMlN. l ll,ltN' 2625HR. 7HR. /t5 Mlll. t5 Mlll. FIG.6 TABLE I SUMMARY OF LABORATORY TEITING crLlT PROJECT NO. GS06903.000-115 ffi DESCRIPT]ON CLAY. SANDY (CL) SAND. CLAYEY (SC) GRAVEL. SILTY (GIVI) GMVEL. SILW(GM) PASSING NO.200 SIEVE (Vsl 66 30 10 7 PERCENT SAND (%) 1S 39 21 22 PERCENT GRAVEL (oh, 15 31 69 71 sotrsf,.E SULFATES (oh] .SWELL (Yo) PLASTICITY INDEX (o/ol 5 LIQUID LIMIT (%) 28 DRY DENSIW (PCF) MOISTURE CONTENT (%) 12.4 6.3 23.4 DEPTH (FEET) 7-8 4-5 5.6 6-7 EXPLORATORY PIT TP-1 TP-2 TP.3 TP.4 Page 1 of 1