Loading...
HomeMy WebLinkAboutPlan correction LetterColleen Wirth v/a;t Carce*zaz, k/-/v From: Sent: To: Cc: Subject: Colleen Wirth Thursday, January 30,2025 7:35 AM drewml22@gmail.com; thad@Tebuilders.net; aspentruedimensions@comcast.net; stevemil lard.pe@ g mai l.com John Plano FW: BLRE-12-24-9040 - TAYLORADDITION and REMODEL is UNDER REVIEW BLRE-1 2-24-9040 - Taylor property 310 Ftying Fish Rd Hetto, this is Garfietd County Ptans Examiner, Col,teen Wirth, providing update on your buitding project review. Below is a list of items I wil,[ need a written response on to add to your appl,ication package. I need to obtain more information to more ful.l,y define the project scope: so I correctty "stamp" and "condition" this permit -- to match the intended work scope -- and you may schedute at[ needed inspections' No/e: 1riaha/ ePP//;zh> euESrloNS, /?1 ArQr r4/ /eve /' 4 a r& de ta ;7 1 . Survey ptat OateJV ay 14,2024 depicts a singl,e-famil,y residence, ADU, a barn, 2 Loafing sheds, a detached studio, pump house, bridge and a tree house. However, this survey ptat does not inctude.nymor.[abe[s,toidentifyl,ocationofproposedconstructioninctudedunderthis\ ?:iT,t;rr" confirm the foundation repairs and interior remodel, witt oNLY occur at the existing '{ singLe-famil,y residence? I> 1 .b. And NO buitding construction / interior remodet work or foundation repair - under the apptied\ buitding permit --- is ptanned to other detached structures, inctuding and not Limited to the detached studio, barn, ADU sheds bridges etc? 1.c. And the vehicuLar bridge is existrngwith no new site grading? or changes to the existing driveway or bridge structure, correct? 2. What is ELEVATION in feet above sea [eve[ at the buitding site? 3. Foundation repairs appear to depict a new or renovated crawl space area with a singte modest- sized crawl space opening in main ftoor system. 3.a. ls there mechanical equipment or apptiances instatted in the crawl space now? lf so, please expound. ( We want to ensure equipment service and associated maintenance tighting and a 2O ft passageway remains code comptiant afterfoundation repairs are made.) 3.b. Witt any new mechanicat equipment or appl.iance(s) be instatted in this crawl space? 3.c. ls there any existing or proposed LP propane- fueted apptiances in your crawl space? 4. Two different main [eve[ ftoor ptan sheets were submitted. One version of sheet A-1 shows some new egress window references and "meta[ roof" and "tog siding". The second, depicts some superimposed HVAC, exterior window openings, U-factor references, and proposed insutation - presumed for this 28 ft by 6 ft finished tiving addition. BOTH versions of main [eve[ ftoor ptan are tabel,ed EXISTING FLOOR PLAN. No pages were found tabeted PROPOSED FLOOR PLAN. Other S'\ a\' \ N 1 ELEVATION sheets show kitchen renovations, master bathroom suite / master and kid closet renovations / mud entry [aundry pantry and mechanical space renovation rrucrk. 4.a. lnasmuch as the (presumed)singte-famity main residence is served by an existing on-site wastewater treatment system - and as septic tank / [each fietd design capacity is based on total number of bedrooms, THEN: 4.a.i. What is the total bedroom count = # _in the existing home BEFORE ANY remodel / renovation I repair work begins? 4.a.ii. After structuraI repairs / remodet construction commences, what witt be the totaI bedroom count = #when construction is compteted? 4.b. Does this project scope inctude installation ot new log siding? 4.c. Does this project scope include remova[ / instattation ol new metal roof coveringJ 4.d. Does this project scope inctude any proposed Ioftframinglor loft storage or new [oft room space(s) in the singte-fa mity rcsidcncc? NEXTACTION STEPS: Ptease review question items 1- 4.d. and furnish a written response to ALL QUESTIONS fol oul buitcling fite records. Answers ean be sent to me directty at Colteen Wirth Ptans Examiner c_wirlh@garfiatd:_c--ountV.c_qm. Colleen Wirth Building Plans Examiner Garfietd Gounty Gommunity Development 108 Bth Street, Suite 401 (970) 945-1 377 ext 1 61 0 cwi rt h @,ga rJi e [d :c-o u nty. c_o m X,EEal/ry >t 7n /*Bo-E p trr//rynb./ aanT/ek//-7/-,u25 F /l/d ummmk /--r,EJ l' > r'+' /% 0n /77dA/5 reH'kl nn,-Li-nJ,^^ frtttl,\, tnA// 4 r-,(--{//r. ft.///t(4/771 (-/u/v/J/ / /v/v -ir7-/-/ FeA6, zz5 rt*_,7/4// o 2