Loading...
HomeMy WebLinkAboutSubsoils Report for Foundation DesignlftrtHffififfifffif,'r3;n..*" An Employe Orncd Compony 5020 County Road 154 Glenwood Springs, CO 81601 phone: (970) 945-7988 fax: (970) 945-8454 email: kaglenwood@kumarusa.com www.kumarusa.com Office Locations: Denver (HQ), Parker, Colorado Springs, Fort Collins, Glenwood Springs, and Summit County, Colorado October 12,2023 Crawford Design Build Attn: Don Glenn P.O. Box 1236 Carbondale, Colorado 81623 crawforddesi gnbuild@comcast.net i:I".i 'i. '"'r :, JAN 2 4 2025 ;.rt .l Subject: Project No.23-7-590 Subsoil Study for Foundation Design, Proposed Residence, Lot 8, Wooden Deer, Wooden Deer Road, Garfield County, Colorado Dear Don: As requested, Kumar & Associates, Inc. observed two backhoe pits for design of foundations at the subject site. The study was conducted in accordance with oru agreement for geotechnical engineering services to Crawford Design Build dated October 6,2023. The data obtained and our recommendations based on the proposed construction and subsurface conditions encountered are presented in this report. Proposed Construction: We assume the proposed residence will be a fwo-story wood frame structure located in the area of the pits on the site. Ground floor will be with slab-on-grade or structural crawlspace. Cut depths are expected to range between about 5 to 12 feet. Foundation loadings for this type of consffuction are assumed to be relatively light and typical of the proposed type of construction. If building conditions or foundation loadings are significantly different from those described above, we should be notified to re-evaluate the recommendations presented in this report. Site Conditions: The site is undeveloped and slopes moderately steeply down to the east- southeast. There is a steep road cut down to Wooden Deer Road to the east. Two pits had been excavated with a mini-excavator in the lower part of the building area. The site is vegetated with pinon and cedar trees with an understory of grass and weeds. Subsurface Conditions: The subsurface conditions at the site were evaluated by observing two backhoe pits previously excavated in the lower portion of the proposed building area. The subsoils encountered, below about 1 foot of topsoil, consist of 9 feet of silty sand with scattered gravel and cobble to small boulder size basalt rocks. Results of consolidation testing performed on a relatively undisturbed sample of the silty sand matrix soils, presented on Figure 1, indicate low compressibility under existing moisture conditions and light loading and a low settlement potential when wetted. The soils were moderately compressible under increased loading after $ ,{q s N -2- wetting. No free water was observed in the pits at the time of excavation and the soils were slightly moist to moist. Foundation Recommendations: Considering the subsoil conditions encountered in the exploratory pits and thc naturc of the proposed construction, we recommend spread footings placed on the undisturbcd natural soil designed for an allowable soil bearing pressure of 1,500 psf for support of the proposed residence. The soils tend to compress after wetting and there could be some post-construction foundation settlement. Footings should be a minimum width of 18 inches for continuous walls and 2 feet for columns. Loose and disturbed soils and existing fill encountered at the foundation bearing level within the excavation should be removed and the footing bearing level extended down to the undisturbed natural soils. Exterior footings should be provided with adequate cover above their bearing elevations for frost protection. Placement of footings at least 36 inches below the exterior grade is typically used in this area. Continuous foundation walls should be reinforced top and bottom to span local anomalies such as by assuming an unsupported lengh of at least 12 feet. Foundation walls acting as retaining structures should be designed to resist a lateral earfh pressrrre hased on an equivalent fluid unit weight of at least 50 pcf for the on-site soil as backfill. Floor Slabs: The natural on-site soils, exclusive of topsoil, are suitable to support lightly to moderately loaded slab-on-grade construction. To reduce the effects of some differential movement, floor slabs should be separated from all bearing walls and columns with expansion joints which allow unrestrained vertical movement. Floor slab control joints should be used to reduce damage due to shrinkage cracking. The requirements for joint spacing and slab reinforcement should be established by the designer based on experience and the intended slab use. A minimum 4-inch layer of free-draining gravel should be placed beneath basement level slabs to facilitate drainage. This material should consist of minus 2-inch aggregate with less than50%o passing the No. 4 sieve and less than2Vo passing the No. 200 sieve. All fill materials for support of floor slabs should be compacted to at least 95Yo of maximum standard Proctor density at a moisture content near optimum. Required fill can consist of the on- site soils devoid of vegetation, topsoil and oversized rock. Underdrain System: Although free water was not encountered during our exploration, it has been our experience in the area that local perched groundwater can develop during times of heavy precipitation or seasonal runoff. Frozen ground during spring runoffcan create a perched condition. We recommend below-grade construction, such as retaining walls, crawlspace and basement areas, be protected from wetting and hydrostatic pressure buildup by an underdrain system. The drains should consist of drainpipe placed in the bottom of the wall backfill surroundcd abovc the invert level with free-draining granular material. The drain should be placed at each level of Kumar & Associatel, lnc. o Project No. 23-7-590 a-J- excavation and at least I foot below lowest adjacent finish grade and sloped at a minimum lVo to a suitable gravity outlet. Free-draining granular material used in the underdrain system should contain less than 2Yo passing the No. 200 sieve, less than 50% passing the No. 4 sieve and have a maximum size of 2 inches. The drain gravel backfill should be at least l7zfeet deep. Surface Drainage: The following drainage precautions should be observed during construction and maintained at all times after the residence has been completed: 1) Inundation of the foundation excavations and underslab areas should be avoided during construction. 2) Exterior backfill should be adjusted to near optimum moisture and compacted to at least 95o/o of the maximum standard Proctor density in pavement and slab areas and to at least 90Yo of the maximum standard Proctor density in landscape areas. Free-draining wall backfill should be capped with about 2 feet of the on-site, finer graded soils to reduce surface water infiltration. 3) The ground surface surrounding the exterior of the building should be sloped to drain away from the foundation in all directions. We recommend a minimum slope of 12 inches in the first 10 feet in unpaved areas and a minimum slope of 3 inches in the first 10 feet in pavement and walkway areas. A swale may be needed uphill to direct surface runoffaround the residence. 4) Roof downspouts and drains should discharge well beyond the limits of all backfill. 5) Landscaping which requires regular heavy irrigation should be located at least 5 feet from the building. Consideration should be given to the use of xeriscape to limit potential wetting of soils below the foundation caused by irrigation. Limitations: This study has been conducted in accordance with generally accepted geotechnical engineering principles and practices in this area at this time. We make no warranty either express or implied. The conclusions and recommendations submitted in this report are based upon the data obtained from the exploratory pits excavated at the site, the proposed type of construction, and our experience in the area. Our services do not include determining the presence, prevention or possibility of mold or other biological contaminants (MOBC) developing in the future. If the client is concerned about MOBC, then a professional in this special field of practice should be consulted. Our findings include interpolation and extrapolation of the subsurface conditions identified atthe exploratory pits and variations in the subsurface conditions may not become evident until excavation is performed. If conditions encountered during constrrction appear different from those described in this report, we should be notified at once so re-evaluation of the rscommendations may be made. This report has been prepared for the exclusive use by our client for design purposes. We are not responsible for technical interpretations by others of our information. As the project evolves, we Kumar & Associates, lnc. o Project No. 23-7-590 -4- should provide continued consultation and field services during construction to review and monitor the implanentation of our recommendations, and to verifu that the recommendations have been appropriately interpreted. Significant design changes may require additional analysis or modifications to the recommendations presented herein. We recommend on-site observation of excavations and foundation bearing strata and testing of structural fill by a representative of the geoteclurical engineer. If you have any questions or if we may be of further assistance, please let us know. Respectfully Submitted, Kumar & Associates, Daniel E. Hardin, P DEH/kac ottachment Figure I Test Results Kumar & Associates, lnc, o Project No. 23-7-590 9o CL :63n =o6O ..::GlNO+ lrt o- g) d; il (nL= =aoi E{,o-Kx= Eri.r 8== --,hP<z- 68sEnooEoo<2.3 9-5?.9 o . ileEli+ iii:!* !.t4 0€ E IH:g:E oo o Lo!< I OTT?T (z) Tri,rs - Notrvol'tosNo3 IO(oN€ttlt Oo, rO I |t\ I rON ao (u'6 oaa € (U E J\l ,JlFJ =tJ', lrJE FalrlF z.otr o Joaz.oO IJJIJ =a ('l L; raqotoo