Loading...
HomeMy WebLinkAboutEngineer's OWTS Design PlanGlenwood Springs, CO 81601 phone: (970) 945-7988 fax: (970) 945-8454 email : kaglenwood@kumarusa.com An Employoc Owned CompEny www'kumarusa'com Office Locations: Denver (HQ), Parker, Colorado Springs, Fort Collins, Glenwood Springs, and Summit County, Colorado ONSITE WASTEWATER TREATMENT SYSTEM DESIGN PROPOSED ACCESSORY DWELLING T]NIT (ADU) AND GARAGE PARCEL NO. 186323200099 TBD COUNTY ROAD 150 (SWEETWATER ROAD) GARFTELD COUNTY, COLORADO PROJECT NO. 24-7-559.02 JANUARY 22,2025 PREPARED FOR: TED VICKERMAN P. O. B,OX342 AVON' COLORADO 81620 tedvic@comcast.net TABLE OF CONTENTS INTRODUCTION .... PROPOSED CONSTRUCTION SITE CONDITIONS....... SUBSURFACE CONDITIONS OWTS ANALYSIS . DESIGN RECOMMENDATIONS ........ SOIL TREATMENT AREA... OWTS COMPONENTS OWTS OPERATION AND MAINTENANCE............. OWTS HOUSEHOLD OPERATION OWTS MAINTENANCE...... OWTS CONSTRUCTION OBSERVATION LIMITATIONS. FIGURES FIGURE 1 _ OWTS SITE PLAN FIGURE 2 _ USDA GRADATION TEST RESULTS FIGURE 3 _ SOIL TREATMENT AREA CALCULATIONS FIGURE 4 - SOL TREATMENT AREA PLAN VIEW FIGURE 5 _ SOIL TREATMENT AREA CROSS SECTION ATTACHMENTS VALLEY PRECAST 1,OOO GALLON, TWO-CHAMBER SEPTIC TANK DETAIL 1 I 1 -2- -J- I 1 5 6 6 J- -6- -6- POLYLOK DISTRIBUTION BOX INTRODUCTION This report provides the results of an onsite wastewater treatment system (OWTS) design for a proposed accessory dwelling unit (ADU) to be located atParcelNo. 186323200099, TBD County Road 150 (Sweetwater Road), Garfield County, Colorado. The project site location is shown on Figure 1. The purpose of the report is to provide design details for the OWTS in accordance with the Garfield County Environmental Health Department Onsite Wastewater Treatment System Regulations and the Colorado Department of Public Health and Environmental Regulation#43. The services were performed supplementary to our agreement for professional services with Ted Vickerman dated September 19,2024. PROPOSED CONSTRUCTION The proposed ADU and garage will be a two-story, wood-frame structure located on the site as shown on Figure 1. The structure will consist of the ADU over a ground floor garage. The ADU will have two bedrooms. The OWTS will be designed for two bedrooms. The proposed soil treatment area (STA) for the OWTS will be located to the southeast of the ADU as shown on Figure 1. Water service will provided by a well located northwest of the ADU. The route of the water supply line to the ADU has not yet been determined. If proposed construction is different than that described, we should be contacted to re-evaluate our design recommendations. SITE CONDITIONS The site was a vacant pasture and hay field at the time of our field exploration. The tenain is gently to moderately sloping down to the south at about 5 to 10 percent grade. There are visible basalt boulders and cobbles on the ground surface. Vegetation consists of grass, brush and scattered stands of cottonwood trees. SUBSURFACE CONDITIONS The field exploration for the OWTS was conducted on October 14,2024. Two profile pits (Profile Pits 1 and2) were excavated with an excavator at the approximate locations shown on Figure 1 to evaluate the subsurface conditions at the planned soil treatment area for the OWTS The pits were logged by a representative of Kumar & Associates. Logs of the profrle pits are provided below. Log of Profile Pit 1 Depth USDA Classilication O-lY2'TOPSOL; organic Sandy Loam, gravelly, firm, slightly moist, brown. lVz'-9'SANDY LOAM; gravelly, moderate blocky structure, dense, slightly moist, brown. a a Bottom of pit @ 9feet. No sroundwater or redoximornhic features observed at time of pit excavation. Depth USDA Classification 0- 1'TOPSOL; organic Sandy Loam, gravelly, firm, slightly moist, brown. l'-8'SANDY LOAM; gravelly, moderate blocky structure, dense, slightly moist, brown. a a a Disturbed bulk sample obtainedfrom 4 to 6feet. Bottom of pit @ 8feet. No sroundwqter or redoximorphic features observed at time of pit excwation. Log of Profile Pit 2 The soils encountered in the profile pits, below about I to l% foot of organic topsoil, consisted of gravelly Sandy Loam down to the pit depths of 8 to 9 feet. Hydrometer and gradation analyses were performed on a disturbed bulk sample of the soils from Profile Pit 2 from 4 to 6 feet depth with the results provided on Figure 2. The tested sample (minus No.l0 size sieve fraction) classifies as Sandy Loam per the USDA system. No free water was encountered in the pits nor indications of seasonal high groundwater were observed at the time of the pit excavations. Based on the subsurface conditions and laboratory testing, the soils at the STA have been classified as Type 2 per State regulations, which equates to a long-term acceptance rate (LTAR) of 0.60 gallons per square foot per day. OWTS ANALYSIS Based on the site conditions and profile pit evaluations, the evaluated area should be suitable for a conventional infiltration disposal system. There is adequate elevation difference from the ADU down to the STA for gravity flow of the sewer effluent. The STA will consist of chambers in a trench configuration based in the Sandy Loam soils. The STA will be sized for two bedrooms (4 persons) with an average daily flow of 75 gallons per person, and an LTAR of 0.60 gallons per square foot per day for the natural soils. The effluent will gravity flow from the ADU to the septic tank for primary treatment and then gravity flow to the STA for dispersal and final treatment. The STA will consist of two trenches with Infiltrator Quick 4 Plus Standard chambers. Equal distribution will be provided to the chambers and trenches by a distribution box. The well is far outside of any setbacks to the OWTS. The route of the planned water supply line to the ADU is currently not designed. The required setback to the water line from the septic tank is 10 feet, 5 feet for sewer and effluent lines, and 25 feet from the STA. We should be notified for additional recommendations if the water line is within these minimum setbacks. DESIGN RECOMMENDATIONS The design recommendations presented below are based on the proposed construction, the site and subsurface conditions encountered and our experience in the area. A layout ofthe proposed OWTS components is provided on Figure 1. If conditions encountered during construction are different than those that are described in this report, we should be contacted to re-evaluate our design recofllmendations. SOIL TREATMENT AREA o The STA will consist of two trenches with 15 Infiltrator Quick 4 Plus Standard chambers placed in each trench (30 chambers total) in the native soils. Equal distribution will be provided to the trenches by a distribution box. o The STA was sized based on an LTAR of 0.60 gallons per square feet per day. . Each chamber was allowed 12 square feet of area. A30% reduction of the STA size was applied for use of Infiltrator chambers in a trench configuration. The total STA design size is 360 square feet. Soil treatment area calculations are shown on Figure 3. o A minimum of four feet of undisturbed soil between trenches is required. o Trench cut depths should be a maximum of 4 feet deep. o The trenches should be oriented along ground contours to minimize soil cut and cover. o The base and sidewalls of the trench excavations should be scarified prior to the chamber placement. o A minimum of 12 inches and a maximum of 24 inches of cover soil should be placed over the chambers. . Backfill should be graded to deflect surface water away from the STA and should be sloped at3 horizontal to 1 vertical or flatter. A swale to divert surface water flow away from the STA may be needed. o Disturbed soil should be re-vegetated as soon as possible with a native grass mix. No trees, shrubs or other plants with deep roots should be planted on or near the STA as this may damage the system piping. o Four-inch diameter inspection ports should be installed vertically into the knockouts provided in the chamber end caps. Install ports at each end of the trench. The inspection port piping should be screwed into the top to the chambers and should not extend down to the ground surface inside the chambers. The inspection ports should extend at least 8 inches above the finished ground surface or be protected in a valve box at finished grade. o The STA must be a minimum of 5 feet from the septic tank. o The STA must be a minimum of 25 feet from any potable water supply lines. o The STA must be a minimum of 20 feet from the ADU. o A plan view of the STA is presented on Figure 4 and a cross section of the STA is presented on Figure 5. OWTS COMPONENTS Recommended OWTS components provided below are based on our design details and our experience with the specific component manufacturers. Equivalent components may be feasible but need to be approved by us prior to construction. Septic Tank o A Valley Precast 1,000 gallon, two-chamber septic tank should be used. A detail of the tank is provided as an attachment. o An effluent filter should be installed in the tank outlet tee. o The tank must be a minimum of 5 feet from the ADU and the STA. o The tank must be a minimum of 10 feet from any potable water supply lines or irrigation lines. o The tank must be set level. The excavation bottom must be free of large rocks or other objects that could damage the tank during placement. A road base or gravel bedding material may be needed to prevent tank damage during placement and act as a leveling course. o The tank lids must extend to final surface grade and made to be easily located. o Install the tank with2 feet minimum cover soil for frost protection. Maximum tank soil cover is 4 feet. Sewer Pipe o The sewer line to the septic tank should not be less than the diameter of the building drains and not less than 4 inches in diameter. o The sewer pipe should have a rating of SDR35 or stronger. o Schedule 40 PVC pipe is required beneath any driveway surfaces. o The sewer pipe should be sloped between 2o/olo 4o/oto help limit disturbance of solids in the tank and potential sewage bypass of the first chamber of the tank. If a steeper slope is needed, this can be accomplished with vertical step-downs in the sewer line. o A minimum 18 inches of cover soil should be provided over the sewer pipe. Paved areas, patios or other areas without vegetative cover may be more susceptible to frost and we recommend 48 inches of soil cover over the sewer pipe in these areas, and the pipe be insulated on top and sides with 2-inch-thick blue foam insulation board. If adequate soil cover is not possible, we should be contacted for re-evaluation prior to installation. o The sewer pipe should be bedded in compactedt/o-inchroad base or native soils provided that the native soils contain no angular rocks or rocks larger than2% inches in diameter to help prevent settlement of the pipe. Sags in the pipe could cause standing effluent to freeze and damage the piping. o Install cleanout pipes within 5 feet of the building foundation, where the sewer pipe bends 90 degrees or more and every 100 feet of sewer pipe. . All 9O-degree bends should be installed using a 9O-degree long-sweep or by using two 45-degree elbows. o The sewer line location shown on Figure I is considered conceptual. We assume that there will be only one sewer line exiting the ADU. It is the responsibility of the owner/ contractors to locate all sewer line exit locations and connections to the septic tank. We should be notified if there are other sewer lines exiting the building. Effluent Transport Piping o The effluent transport pipe should be 4-inch diameter SDR35 piping sloped at a2o/o minimum to flow from the septic tank to the distribution box and from the distribution box to each trench. Piping should extend at least 6 inches into the top knockout provided in the Infiltrator end caps and be screwed in place. Splash plates should be installed beneath the inlet piping to help limit scouring of the infiltrative soil surface in the chambers. o The effluent transport pipe should be bedded in compactedtk-inch road base or native soils provided that the native soils contain no angular rocks or rocks larger than 2Yrinches in diameter to help prevent settlement of the pipe. Sags could cause standing effluent to freeze and damage to the piping. o A minimum 18 inches of cover soil should be provided over the effluent transport pipe. Paved areas, patios or other areas without vegetative cover may be more susceptible to frost. We recommend 48 inches of soil cover over the effluent pipe and insulation with at least 2 inches of rigid foam insulation in these areas. If adequate cover soil is not possible, we should re-evaluate the condition prior to installation. o Schedule 40 PVC pipe is required underneath driveway surfaces and should be provided with at least 48 inches of soil cover and be insulated on top and sides with 2-inch-thick rigid foam insulation board. o All 9O-degree bends should be installed using a 90 degree long-sweep or by using two 45-degree elbows. Distribution Box o The distribution box will be used to equally divide effluent flow between the trenches. We recommend a Polylok Distribution Box since it is easily accessible from ground surface for maintenance. A copy of the distribution box detail is provided as an attachment to this report. o. The distribution box outlet pipes should be equipped with levelers for eose of initial setup and adjustment over time. o The distribution box should be a minimum of l8 inches below grade with risers andarr access lid at or above grade. o The distribution box must be accessible from ground surface for inspection and maintenance per the State guidelines. o The effluent line from the septic tank should be directed downward into the distribution box with a 90-degree elbow inside the box. r The distribution box must be installed level on a compacted road base subgrade to ensure equal effluent distribution. If settlement of the distribution box occurs, unequal effluent distribution may take place which could cause hydraulic overload of one of the trenches and potential failure. The distribution box should be monitored periodically, and the levelers should be adjusted as necessary for levelling. o The ground surface above and around the distribution box should be graded to drain away surface water to prevent standing water near the distribution box which could freezs or cause settlement. OWTS OPERATION AND MAINTENANCE The OWTS will require periodic inspection and maintenance to function properly. A properly designed, installed and maintained system can greatly increase its lifespan. The level of maintenance will vary depending on the complexity of the system and water use habits of the residents. We recommend that an OWTS Operation and Maintenance (O&M) Manual be developed. Depending on the complexity of the system, a contract with an OWTS maintenance provider may be prudent. Below are some basic recommendations for the OWTS O&M. OWTS HOUSEHOLD OPERATION o Use of high efficiency water fixtures is recommended to decrease the hydraulic load on the OWTS system. o Fix plumbing leaks immediately as this may cause a hydraulic overload of the soil absorption system. o Do not irrigate the area on top of or directly upgradient of the STA field as this may cause a hydraulic overload. o Do not dispose of household waste down drains as this may clog or damage OWTS components. Examples of household waste include: dental floss, cotton swabs, coffee grounds, paper towels, feminine products and many other kitchen and bath items. o Use of kitchen garbage disposals is not recommended. If a garbage disposal is utilized, kitchen wastewater should be screened thoroughly. Many kitchen solids are not decomposed in the septic tank and may cause increased tank pumping frequency. o Do not dispose of household chemicals, greases, oils, paints, hot tub water or water softener backwash in household drains. A separate drywell, if feasible, may be necessary for hot tub water or water softener backwash disposal. o Limit the use of bleach as this may harm useful bacteria in the septic tank and soil absorption system. o Liquid dishwasher and clothes washer detergent is recommended for households served by an OWTS. Clay substances used as fillers in powder detergents may result in clogging of the soils absorption system. OWTS MAINTENANCE o Inspect the septic tank, distribution box and STA at least annually for problems or signs of failure. o The effluent filter for the tank should be cleaned at least annually by spray washing solids into the first chamber of the septic tank. o The septic tank should be pumped and cleaned every 3 to 5 years depending on use. Longer pumping intervals may increase the amount of solids that reach the STA, which may shorten its life span. . Pumping of the septic tank should take place when the level of the sludge and scum layers combined take up 25 to 33Vo of the capacity of the first chamber of the tank. OWTS CONSTRUCTION OBSERVATION The Garfield County Environmental Health Department requires that the designer of the system provide a record drawing and certification of the OWTS construction (As-Built inspection). We should be provided with at least 48-hour notice prior to the installer needing the inspections. Prior to issuance of our certification letter, we require observation of all system components prior to backfill. The number of site visits required for the inspection will depend on the installer's construction schedule. LIMITATIONS We have conducted this design in accordance with generally accepted engineering principles and practices in this area at this time. We make no warranty either expressed or implied. The recoflrmendations provided in this report are based on the site conditions, profile pit evaluations and soil texture analysis, the proposed construction and our experience in the area. Variations in the subsurface conditions may not become evident until excavation is performed. If conditions encountered during construction appear different from those described in this report, we should be notified so that re-evaluation of the recommendations may be made. This report has been prepared for the exclusive use by our client for design pu4)oses. We are not responsible for technical interpretations by others of our information. As the project evolves, we should provide continued consultation and field services during construction to review and monitor the implementation of our recommendations, and to verifr that the recommendations have been appropriately interpreted. Significant design changes may require additional analysis or modifications to our design. It is our opinion that the designed location of the OWTS components does not violate any setback requirements of the current Garfield County Regulations. Below is a table of common minimum horizontal setbacks to OWTS components. Refer to the Garfield County Regulations for a complete list ofrequired setbacks. We recommend the OWTS components be surveyed by a Professional Colorado Land Surveyor. Table I - Common Minimum Horizontal Setbacks from OWTS Components WeIls Water Supply Line Occupied Dwelling Lined Ditch Lake, Irrigation Ditch, Stream Dry Ditch or Gulch Septic Tank STA 100'25',24',10'50'25 5 Septic Tank 50'10'5'l0'50'10' Building Sewer 50'5',0'l0'50'l0' Please contact us for any necessary revisions or discussion after review of this report by Garfield County. If you have any questions, or if we may be of further assistance, please let us know. Respectfully Submitted, Kumar & Associates, Inc. #d' .#,'rfe{ I;*" Shane M. Mello, Staff Engineer Reviewed David A. Young, SMMlkac z7Z PARCEL No. 1 86525200099 TBD COUNTY ROAD 150 (SWEETWATER RoAD) PROPOSED WELL PROPOSED SOIL TREATMENT AREA (STA) CONSTSTTNG OF2 ROWS OF 15 INFILTRATOR QUICK4 PLUS STANDARD CHAMBERS ORIENTED ALONG GROUND CONTOURS. (30 CHAMBERS CLEANOUT PROPOSED VALLEY PRECAST 1,000-GALLON, TWO-CHAMBER SEPTIC TANK PROPOSED POLYLOK DISTRIBUTION BOX I PROFILE PIT 2 PROPOSED ADU AND GARAGE PROFILE PIT 1 oto 25 tNc. a{oe p 50o tu4 SCALE-FEET 200 0 coUNTY RoAD 150 (SWEETWATER ROAD) SCALE-FEET 24-7*559.02 Kumar & Associates OWTS SITE PLAN Fig. 1 = E a E d2 too 90 EO 70 60 30 ,l{, 50 20 t0 o o lo 20 30 & 30 60 70 ao 90 too ,o57 DIAMETER OF PARTICLES IN MILLIMETERS CLAY mm .02 .05 .l SAMPLE OF: GRAVELLY SANDY LOAM FRoM: PROFILE PIT 2 AT 4 TO 6 FEET NOTE: Hydromeler Anolysls vos performed on o bulk somple followlng screenlng o{ oll moleriol lorger lhon the flO sieve (2.0 mm) per USDA guid6lin€s. mm ENTIRE SAMPLE PARTICLE SIZE DISTRIBUTION X COBSLES 0 GRAVEL 35 SAND 58 SILT 22 CLAY 5 PORTION OF SAMPLE PASSTNG #10 STEVE PARTICLE SIZE DISIRIBUTION X SAND 5E SILT 31 CLAY I TOTAL SAMPLE RETAINED ON f,10 SIEVE: 35X PERCENT OF MATERIAL RETAINED ON #10 SIEVE PASSING 3/1" SIEYE: 51X ThG. lcll rrlull! opply only lo th. sqmplc! whlch wsE losl6d. Tho lodlng ruport lholl not b! nproduc€d, sxcspf ln full, wfhoul lho wrltlonqpprcyol ol Kumor & Asloclqh!, lnc. Sloe cnolyrls lsdlng l! pirfomod ln occordonc€ ullh ASTU D,[22, ASIM Cl36qnd/or ASTII 01140. COBBLES .25 .5 SIEVE ANALYSISHYDROMETER ANALYSIS CLEAR SOUARE OPENII{OSTITE RroING 2' HRS 7 HRS t6n tlo U.S. STAI{DARD SERIES ls ata SAND GBAVELSILT MEDIUM m vco FINE MEDIUM COARSEFINFco.V. FINE FINE GRAIN SIZE (mm)SIEVE SIZE X FINER 127.OO 5"100 76.00 100 38.1 0 1-1 /2'90 19.05 3/1"a4 9.50 3/8"77 1.75 *1 71 2.00 tl0 65 1.00 #18 59 o.50 '135 55 0.25 *60 /t5 0.1 06 *1/t0 55 o.053 1270 27 GRAIN SIZE (mm) TIME PASSED (min)X FINER o-o37 1 25 0.019 I 21 0-009 19 11 0.005 60 10 0.002 /+55 5 0.001 I 545 3 24-7-559.O2 Kumar & Associates USDA GRADATION TEST RESULTS Fis. 2 OWTS SOIL TREATMENT AREA CALCUTATIONS In accordance wtLh the Garfieb County OWTS Regulatbns and the Cobrado Depaftment of Pubk Health and Envlronment's Regulatbn #43, the soil treatment area uas cahulated as fobun: CALCULATTON OF OvtfiS DESTGN FLOW: q = (F)(N) N = 2 PERSONS PER BEDROOM WHERE: Q = DESIGN FLOW F = AVEMGE FLOW PER PERSON PER DAY B = NUMBER OF BEDROOMS N = NUMBER OF PERSONS 75 GALLONS PER DAY 2 BEDROOMS 4 PERSONS 3OO GAIIONS PER DAY SOIL TREATMENT AREA: F B N a CALCULATION OF OWTS MINIMUM SOIL TREATMENT AREA =s00.0 SQUARE FEET REDUCTION FACTOR FOR CHAMBERS =0.70 MINIMUM SOIL TREATMENT AREA WITH REDUCTION = 35O SQUARE FEET MINIUMUM TREATMENT AREA = Q + LTAR WHERE: Q= LTAR (SOIL TYPE 2) = AREA PER INFILTMTOR QUICK 4 STANDARD CHAMBER = TOTAL CHAMBERS NEEDED = NUMBER OF TRENCHES = CHAMBERS PERTRENCH = TOTAL NUMBER OF CHAMBERS AS DESIGNED = TOTAL SOIL TREATMENT AREA = 3OO GALLONS PER DAY 0.6 GATLONS/FTTDAY 12 SQUARE FEET 30 CHAMBERS 2 TRENCHES 15 CHAMBERS 30 CHAMBERS 35O SQUAREFEET 24-7-559.02 Kumar & Associates SOIL TREATMENT AREA CALCULATIONS Fig. 3 4 INCH DIAMETER NON-PERFORATED SDR55 TRANSPORT PIPE SLOPED AT A 2% MIN. DOWN TO DISTRIBUTION BOX. 4 INCH DIAMETER PVC OBSERVATION PORTS INSTALLED VERTICALLY INTO THE KNOCKOUTS PROVIDED IN END CAPS. INSTALL PORTS AT EACH END OF EACH TRENCH. REMOVABLE LID TO BE PLACED ON TOP OF PIPE. PIPE MUST STICK UP AT LEAST 8 INCHES ABOVE FINISHED GRADE OR BE PLACED AT GRADE IN AN ACCESSIBLE VALVE BOX. PIPES SHOULD NOT EXTEND TO SOIL SURFACE AND SHOULD BE SECURED TO CHAMBER WITH SCREWS OR COUPLINGS TO PREVENT SLIDING DOWNWARD. POLYLOK DISTRIBUTI BOX 4 INCH DIAMETER NON-PERFORATED SDR55 TRANSPORT PIPE SLOPED AT A 2% MIN. DOWN TO TRENCH. INFILTRATOR QUICK 4 PLUS STANDARD END CAP. TRANSPORT PIPING SHOULD BE INSERTED AT LEAST 6 INCHES INTO THE UPPER KNOCKOUT IN THE END CAP. INSTALL SPLASH PLATES BENEATH INLET PIPING TO HELP LIMIT SCOURING OF THE INFILTRATIVE SURFACE. INFILTRATOR QUICK4 PLUS STANDARD CHAMBERS ]N 2 TRENCHES. 15 CHAMBERS PER TRENCH (30 TOTAL). 20 SCALE_FEET Noies1. Chambers should be installed level on a scarified ground surface. Concrete sand may be used as a leveling course if necessary. 2. Care should be taken by the contractor to avoid compaction of the native soils in the trench areas. The base and side walls of trench excavations should be scarified prior to chamber installation. 3. All piping should have a rating of SDR35 or stronger. 4. Changes to this design should not be made without consultation and approval by Kumar & Associates. 5. Refer to the Garfield County Onsite Wastewater System Regulations for other applicable specifications. Fis. 4 l'$\$' 24-7-559.42 Kumar & Associates SOIL TREATMENT AREA PLAN VIEW NATIVE SOILDISTURBE N SOIL BETWEEN SCARIFY GROUND SURFACE PRIOR TO CHAMBER PLACEMENT EXCAVATE 56'' WIDE TRENCH 12" MlN./24" MAX. COVER SOIL GRADED TO DEFLECT SURFACE WATER Notes GRO UND Chambers should be installed level on a scarified ground surface. Concrete sand may be used as a leveling course if necessary. Care should be taken by the contractor to avoid compaction of the native soils in the trench areas. The base and side walls of trench excavations should be scarified prior to chamber installation. Changes to this design should not be made without consultation and approval by Kumar & Associates. INFILTRATOR QUICK 4 PLUS STANDARD CHAMBER INSTALLED LEVEL 2.5 0 SCALE-FEET 2 24-7-559.02 Kumar & Associates SOIL TREATMENT AREA CROSS_SECTION Fis. 5