HomeMy WebLinkAboutBlower Door TestJurisdiction Permit N
.Fob Information
Builder:" I Community: Lot:
Address yo D
city. QI State'.Zip- 650
Air Leaksoe Test Resuits PsseieV msdfs crust meet either the Performance. Pr, -CSC* w. or ER! lAethGd
Prescriptive Method —The budding or dwwlling unn shall be tested and verified as having an air leAage rate of not exceedcg 7 aw
chafes per txur at a pressure of 0.2 iwh w.g. (50 Pascals} in Clirnete Zones 1 and 2.
Performance or ERI Method—T'he build rig or dweOng unit shall be tested and venfied as haystg an au teakage rate of no errs -ring
the selectea ACH(SO) value. as stttmyn on Eorrn R405-2t)20 (Performance) or 14406-2020 (ERR), section labeled --- infittratiio!�, yut-
secw n ACS541
ACHM� specjfe,I on Farm Rd0i02it-Energy C:ak (Performance) or R4045—MO (ERI,
Met tod for catculannro buikinn vokirnee-
O Retriered from architeclurzf plans
. �.....,.. x 60 � (FA = 2 • tf
CPRl;SO) 6u Voiu^;e t.H( G. O �iela
solwareca.lalated
measured and calcula'ed
PASS
S4014.12 Testing. Tesing scull be conducted in accordance faith ,ANSURESNETACC 380 and reported a: a pressure of 02 irw�h -g. (50
pascals)_ Testing small be conducted by eitr*r individuals as defined in Section 553.993(5) or (7), sbt'e S=Wes, or indn;K3t licensed as
set forth in Section 481-4. 105(3)(f), (g) or (i) or an approved third party. A writien report of the results of the test shall be signed by the pasty
concuottng tine test a+d pxrovided to the code official. Testing shall be performed at any trite after creation of al penetrawrts of the leg
Vvffrjaf erh-ekpe.
Dunrig testing:
t. Exterior wtrrdmr. and doors, fireplace as;d stove doors shall be dosed, but mt sealed, beyond the intended waathersinpping or or*r
infzttrabon control measures.
2 dampers includr"+g extia.ust irta.xee. mareup air, backdrafi and thue ci:mpers shall be closed, but not sealed beyond iivencied irtfi�
co.. ual rflFasures.
3_ Irdenor omrs, if installed at the time of the test. shall be opera.
4, EfLefior doors for continuous venblalion systems ana heat recoo'ery ventilators shall be hosed and seated.
5, i-ieatng and ccoling systems, if irystagec at the drre of the test, shall be turned off.
5. Supply ana return registers, if installed at the time of the test, shall be fully open.
Tes'l-rig company
e insulation Phone- WC1-ZV0-UUj 1
Air Leakage results are in accordance with the 260 7th Edition Florida Bt
ir-prAing to the compliance method selected above_
.r...✓ r _,._�,�..,.,,. [fate of 1'esf: _„�
9377 lasuing Authority: Building Ferformanc