Loading...
HomeMy WebLinkAboutApplicationGarfield County Community Development Department 108 8th Street, Suite 401 , ;., , i r Gl,gnwood Springs, co 81601 .11r.i i r" rri., (970)945_9212 www.ga rf ield-cou ntv.com o,b BUILDING PERMIT APPLICATION WPEOF DemolitionCommercial/M ulti-Family Manufactured Home or TinV Home (Single or Multi-Level) I ReroofResidential (SF, Duplex or Townhome) Accessory Dwelling Unit (ADU) - MAXIMUM SIZE OF 2OO SQUARE FEET INVOIVED PARTIES Property Owner: Mailing Address: Nate Renwald Phone: e16 ) 233-9934 101 river park lane Aspen - Glen Co. 81623 Email Address: nrenwald@gmail.com Contractor:Brian Shaw Phon", ( 970 \404-2550 Mailing Address:41 Pinion run New Castle Co.81647 Emait Addresr. blswoodworking@gmail.com Architect:David Ortiz Phone 303 .931-1084 Mailing Address 3491 West Amherst Avenue Denver, Colorado 80236 Emait Addresr. david@thrivedesignarchitecture.com Engineer Phone: ( ) Mailing Address Email Address: Manufactured Home lnstaller:Ph one: () Mailing Address Email Address: PROJECT DETAITS Describe Work:lnterior Remodel, 4 bathroom's, Kitchen and electrical Job Address:101 River Park Lane Assessor's Parcel Number: ,ro. Aspen-Glen EE Lot t t Block Owner's Valuation of Workl S Property Size (Sq. Ft. or Acres) Sq. Ft. of Building:Height:# of Floors:_ Class of Work:New r'Remodel/Alteration Addition Garage:Attached Detached ISepticrfWTS Community Type of Heat:Natural Gas Propane Electric Other Driveway Permit: Exempt Permit #: Authoritv. ThisapplicationforaBuildingPermitmustbesignedbytheOwneroftheproperty,describedabove, oranauthorizedagent. lfthesignaturebelowisnotthatoftheOwner,aseparateletterofauthority,signedby the Owner, must be provided with this Application. Legal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for purposes of inspections by the Building Division. Other Permits. Multiple separate permits may be required: (1) State Electrical Permit, (2) County OWTS Permit, (3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access or a State Wastewater Discharge Permit. Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement. I hereby certify that I have read this Application and that the information contained above is true and correct. I understand that the Building Division accepts the Application, along with the plans and specifications and other data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming completeness of the submittals and approval of this Application, a Building Permit will be issued granting permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the Building Division. ln consideration of the issuance of the Building Permit, I agree that I and my agents will comply with provisions of any federal, state or local law regulating the work and the Garfield County Building Code, OWTS regulations and applicable land use regulations (County Regulation(s)). All County development requiring a permit, except for residential uses, are subject to Article 7 of the Land Use and Development Code. I acknowledge that the Building Permit may be suspended or revoked, upon notice from the County, if the location, construction or use of the structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any other applicable law. I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1) requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law. Review of this Application, including submittals, and inspections of the work by the Building Division do not constitute an acceptance of responsibility or liability by the County of errors, omissions, or discrepancies. As the Owner, I acknowledge that responsibility for compliance with federal, state and local laws and County Regulations rest with me and my authorized agents, including without limitation my architect designer, engineer and/ or builder. I hereby acknowledge that I have read and understand the Notice and Certification above, as well as, have provided the required information which is correct and accurate to the best of my knowledge. l/2%/>s Property Owner Print and Sign 'd.t t tee a**a ./*1 Q:VDI VA0/SSpecial Conditions: Manu. Home Fee:Misc. Fees: r---- Adiusted Valuation:- 61.730. @ Plan Check Fee:r4Z4.Ar ffifi'26 'ffi2"29^,mb-qr;b3 OWTS No: - "'ll'fuo,r?Fees Paid:424 c't\ const.rvnT RU Si",i't)Setbacks:.--occ GrouP: I Ro b/f-%h,liMBUILDING / PTANNING DIVISION : Signed Approval Date Gurfield County BUILDING DEPARTMENT 708 Eighth Street Suite 401, Glenwood Springs, CO 8160L Tel: (970) 945-8272 PLAN R EVIEW CHEC K LIST EI-RE-2/€F_?db7Permit No: Building lssues Pla nni ng I Zoning lssues Engineered Foundation e&drrivewav Permit -!- surveyed site Plan Septic Permit and Setbacks Grade/ TopograPhY 30% Attach Residential Plan Review List Subdivision Plat Notes Fire Department Review Valuation Determination/ Fees Red Line Plans/ StamPs/ Sticker Attach Conditions Application Signed Energy Compliance Path/Plan Received Plan Reviewer to Sign APPlication Parcel/schedule No. 40# Snowload Letter - Manuf. Homes Soils Report -''----t- Flood Plain Building Height Zoning Sign-Off Grade/ Topography 40% Planning lssues Subdivision Plat /1/4 Road rmpact Fees lraMa) F/9 /+ -/ UND N1 /rrly,bn (*rrful 0rL Tb,>r ,Qerrp/e/ tzv/ K ifio Description & Summarv: 7u,& Vema/rHoz, drV,itL h a h}Uu'Jt-**rz, bt tbr,z/ an4D/,0/ y fuetbo/'ao/u tvt /n/ord A/,o/ / a/h*,b//ur//'>/ Ya/aa.h)>o ' ENERGY COMPLIANCE SHEET REQUIREMENTS: Effective June 30, 2023 Please provide details showing how building complies / meets Garfield County's adopted 2018 IECC and Climate Zone 5. Depict and show outline the structure's building thermal envelope. Outline should clearly show portions of the building to be conditioned inside the envelope (and label or othenivise identify any areas remaining unconditioned outside this envelope) Energy Compliance Plan should further include: Chosen Energy Compliance Path. Prescriptive: Cross Sections of insulated assemblies including the selected material/ R-Value and U-Values to comply with IRC Table R402J.2o U-Factor Alternative: Provide a ResCheck Reporto Total U-Factor Alternative: Provide software generated submittal design reports and inspection checklist for any RESNET ERI index or other performance path designs Air sealing details around openings, pipes, penetrations, joints Fenestration U-factors Provide mechanical system design details including proposed efficiency rates, types of equipment, fuel types, locations Energy efficient lighting specifications - 90% to be high-efficacy (LED complies) Manual J Report required for new building structures and new equipment installations. STRUCTURAL PLANS: Please provide the following information on the structural plans. e SOILS REPORT - lf the project is located in a subdivision with a final plat requiring site specific soils investigation report or if Structural plans make a specific reference to a soils report, then a copy of the soils report is required to submit a building permit application.o Design specifications to include roof and deck snow load, wind and seismic design and frost depth.. Foundation plan showing complete footing and foundation dimensions.. Footing and foundation details specifying reinforcement and referenced on plans. . Framing plans for each floor level and roof. All beams, columns, joists, rafters and trusses specified. Pre-manufactured structures require the engineers stamp, signature and date.r Framing /connection details, braced wall lines, shear wall schedule, location and hold downs. NOTE: lf any required information is missing, delays in issuing the permit are to be expected. lf determined by the Building Official that additional information is necessary to review the application and/or plans for compliance, the application may be placed on hold untilthe required information is provided. Work may not proceed without the issuance of a permit. The Building Division will collect a Plan Review fee at time of application submittal. The permit fee, as well as any Road lmpact fees will be collected when the permit is issued. The permit application must be signed by the owner or by person having written authority from the owner to act as their representative. Building cannot be occupied until a Certificate of Occupancy (CO) is issued. Using the building without a CO will be considered an illegal occupancy and may be grounds for vacating the premises. (Final/CO inspection requirements will be attached to your approved field set of plans.) I hereby acknowledge I have read, understand and will abide by the requirements of this checklist. Owner Print:Sign:i-t-8*>{