Loading...
HomeMy WebLinkAboutEngineer's Letter-ClarificationfrIECLI PSE ENG$}TEERING Structural Clarification ltem Date June25,2A24 Proiect: Project Number: To: From: Kite Rancher Residence 6534 CR 331 silt, co 81652 2tt-02-t83 $ aq $ fi Mike Kite / Tamrny Little Phillip Geist, E"l.T. Re: Wind SPeed Revision Eclipse Engineering, P.C. (EEPC) has reviewed the structural calculations for the residence mentioned above for a 1Lb MPH wind speed. The calculations were orisinally conducted using a 104 MPH wind speed. EEpC has re-analyzed the structure for this change and finds no structural changes are required to the original design. Please call with any specific questions' END OF STRUCTURAL CLARIFICATION ITEM Digitally .com, O="Eclipse Eng .c.', Date:7'00' i "'r1,. iTOFTL i