Loading...
HomeMy WebLinkAboutWell Informationre@l COLORADO Division of Water Resources Department of Natural Resources Well Permit Summary Report THIS PAGE IS NOT THE ACTUAL PERMIT The information contained on this page is a summary of the permit file and may not reflect all details of the well permit. See full disclaimer below. Permit Number: 336579- Receipt: 10039388 Permit Category: Residential WDID: Permit Status: Permit lssued Physical Location Division: 5 District: 45 County: GARFIELD Physical Address: 11749 COUNTY ROAD 311 ,ty & State: SILT, CO Zip: 81652 Parcel Type: Parcel Name: Lot, Block, Filing No available data Designated Basin: Management District: Denver Basin Aquifer: Outside Outside Outside \ $ .e e \N aa\ \ -\ $ Feature Type Dist N/S Dist E/W Ql0 Q40 Q{60 Sec Townshlp Range PM UTllx UTMy Latitude Longitude Location Accuracy Well (Application/Permit)NE SW 36 7.0 s 92.0 W s 274591.1 4364643.8 39.40'1875 -107.617828 Spotted from quartors Well (DWR Located)NE SW 36 7.0 s 92.0 W s 274591.1 4364643.8 39.401877 -107.617829 Digitized 336579-'l of 3 Certified accurate as of 0112112025 Permit Details Acres ln Parcel: ercel lDl Use(s): Limits: Aquife(s): Area lrrigated: Within Water Service Area Water Supplier Name: Type of Sewage System: Sewer System Details: 40.00 23-2401-362-00-056 Domestic Yield Amount Depth (T)Depth (B) Statute:37-92-602(3Xb)(l l)(A) - Exempt statutory presumption of no injury Follow Up Permlt Conditions (see actual oermit for more information) Abandonment Required: No Meter Required: No Geophysical Log Required: No Rule 6,2.2.1 (Notice): Yes Rule 6.2.3 (Floating Permit): Yes ALL UNNAMED AQUIFERS 1.00 Septic tank / absorption leach field Construction/Pump lnstallation Details Driller: SHELTON DRILLING CORPOMTTON (SHELTON, WAYNE) Construction Date: Completed Well Depth: Perforated Casing Top: Perforated Casing Bottoml '\tatic Water Level: Well Yield Estimate (GWS-31): Pump lnstaller: Last Pump lnstallation Date: Production Test Yield: Appl ication/Permit History Aotion Action Dato Date Received Comment Application Received 1',il14t2024 CONSTRUCT NEW WELL, ONLY WELL SQUARE 1/4 1/4 SECTION Permit lssued 1112012024 Permit Expiration Date 1112012026 ApplicanUGontact Start Date End Date Assoclatlon Type Gontact Name Addr€sg Clty State Zlp Code 1111412024 Owner CASTLE CREEK VALLEY RANCH LOT 15 LLC 1717 W.6TH STREET, SUITE 470 AUSTIN TX 78703 11t1412024 Agent PERRIN, GEOFFREY 1717 WEST 6TH STREET SUITE 470 AUSTIN TX 78703 336579-2of 3 Certified accurate as of 0112112025 Disclaimer * The information contained on this page is a summary of the permit file and may not refect all details of the well permit. THIS PAGE lS NOT THE ACTUAL "ERMIT. fhis page should not be used as a basis for any legal consideration, to determine the allowed uses of the well, to determine construction information, or to deteimiie the terms and conditions under which the well can operate. The complete well permit file should be viewed to obtain details on the allowed uses and other relevant information. A complete copy of the file is available in the "lmaged Documents" section of this page, and can be viewed by opening all of the documents listed in that section. Not6 that all of the terms and conditions under which a well can operate, particularly for non-exempt wells, may not be specified on the well permit. Wells may also be subject to relevant statutes, rul€s and decrees. To learn more abou well permifting in Colorado, please visit DWR's Well Permitting Page. lf you have any questioirs about this well permit file, please contact the DWR Groundwater lnformation Desk at (303) 866-3587 (Hours 9am4pm M-F). 336579-3of3 Certified accurate as of 0112112025 GG} i;llf,,,:j"?il:-'Map Viewer . Surface Water * Well Constructed r Final Permit x Geophysical Log + Active Gage - Diversion a Active Gage - Reservoir + Active Gage - Stream All Stations I Township il seaion ,! o+o Uj County Legend s!r Location Notes 585 O 292 585 Feet 1: 3,508 0 This producl is for informational pu4poses and may not have been prepared for, or be suitable for legal, engineeing, or surveying purposes. Users of this infomation should review or @nsult the pimary data and information sources to ascedain the usabilw of the informa$on. Date Prepared: 11n2024 8:24:31 AM Form No. GWS-07 0712016 EXEMPT STATE OF COLORADO DIVISION OF WATER RESOURCES OFFICE OF THE STATE ENGINEER 1313 Sherman St., Ste 821, Denver, Colorado 80203 (303) 866-3581 INFORMATION FOR WELL PERMITS APPROVED PURSUANT TO CRS 37-92-602 (HOUSEHOLD, DOMEST|C, LTVESTOCK AND EXEMPT COMMERCIAL USES) Carefully read the conditions of approval on your well permit. The conditions and the information on this information sheet must be complied with in order for the permit to remain valid. The well permit number is located in the upper right hand corner of the permit, and the expiration date is located in the lower right hand corner. THE WELL PERMIT EXPIRATION DATE IS TWO YEARS FROM THE DATE ISSUED. EvidCNCE Of WEII construction must be received on appropriate form PRIOR TO THE EXPIRATION DATE OF THE PERMIT. The required form is the Well Construction and Test Report (Form No. GWS-31). The expiration date of the permit may be extended one year at a time for good cause shown, at the discretion of the State Engineer. lf an extension of time is necessarv to construct the well. the owner must file a written request for the extension. The request must be received bv the State Enqineer prior to the expiration date. The request must state why the well has not been constructed, and must include an estimate of time required to construct the well. Water well construction and pump installation contractors are licensed in Golorado to perform these specialized tasks. lt is illegal for individuals who do not hold these licenses to construct wells and install pumping equipment in or on wells. The well must be constructed and pumping equipment installed by contractors with current license(s) issued by the State of Colorado unless exempted as described on the reverse side. Please ask to see their license(s). Backhoe Operators and Licensed Plumbers may or may not hold the respective Well Construction and/or Pump lnstallation licenses. Please be aware of this when you contract to construct the well and install pumping equipment. The well construction report including a test of the well yield must be submitted to the office of the State Engineer within sixty (60) days of completion of the work or within seven days after expiration of the permit, whichever is earlier. The pump installation report including a pumping system test must be submitted within sixty (60) days of completion of the work. The contractor(s) must provide you with a copy of the work report(s) filed with the State Engineer. Additional information regarding well construction, pump installation, required testing and well plugging and sealing regulations are found on the reverse side of this sheet. Keep a copy of this permit for your records. The official digital image of the permit is on file in the Denver office Records Section. You may view or print the entire permit file using our online well permit search tool: httos://dwr. state. co. us/ToolsA/Vell Permits Hard copies of permit documents may be obtained from our Records Section for a fee of 50 cents per page. Statutes require that any change of mailing address or ownership be reported to the State Engineer. Form number GWS-11 is used both by new owners to report ownership changes and current owners to report address changes. lf you have questions, contact the Ground Water lnformation Desk at (303) 866-3587, or the Division Office in the area where your well is located. Division 1 B1o gtn st., Ste. 2oo Greeley, CO 80631 (970) 352-8712 Fax: (970) 392-1816 Division 2 310 E. Abriendo Ave Ste B Pueblo, CO 81004 (719) 542-3368 Fax: (719) 544-0800 Division 3 301 Murphy Drive Alamosa, CO 81101 (719) 589-6683 Fax: (719) 589-6685 Division 4 2730 Commercial Way (physical) Montrose, CO 81401 P.O. Box 456Zip 81402 (mailing) (970) 249-6622 Fax: (970) 249-8728 Division 5 202 Center Drive (physical) Glenwood Spgs., CO 8'1601 P.O. Box 396 Zip 81602 (mailing) (970) 945-5665 Fax (970) 945-8741Call First Division 6 505 Anglers Dr. Suite 101 (physical) Steamboat Spgs, CO 80487 P.O. Box 773450 Zip 8O477 (mailing) (97O) 879-0272 Fax: (970) 879-1070 Division 7 160 Rockpoint Dr Ste E Durango, CO 81301 (970) 247-1845 Fax: (970) 259-0944 Denver Office 1313 Sherman St., Ste 821 Denver, CO 80203 (303) 866-3581 No Fax WELL CONSTRUCTION AND PUMP INSTALLATION BY THE WELL OWNER You may construct the well and/or install pumping equipment yourself if the well is foryour own use,,is on property you own, and is constructed or pumping equipment is installed with eluipment owned _and operated by you. lt is vour responsibilitv to complete and submit the Well Construction and Test Report (Form No. GWS-31) and/or the Pump lnstallation and Test Report (Form No. GWS-32), The_se are available from our website (dwt.cotogdg..g), or from any Division of Water Resources office. The well must be constructed and the pumping equipment installed in accordance with the wellconstruction standards of the Board. The WATER WELL CONSTRUCTION RULES obtained from our website (dwr.colorado.qov), or office for a small fee. T'tre-se Rules cover and BOARD OF EXAMINERS RULES can be purchased from any Division of Water Resources the minimum requirements for wellconstruction, pump installation, disinfection, plugging and sealing and contractor licensing regulations. if ybu are constructing your own well or installing pumping equipment, it is recommended thaf you obtain a copy of these Rules for reference. The well construction and pump installation reports including testing of well yields and pumping systems must be submitted to the office of the State Engineer by the respective contractors within sixty (60) days of completion of the work or prior to the expiration date 9f the permit, Whichevgr is earlier. Your cohtractor(s) must provide you with a copy of the work report(s) filed with the State Engineer. RULE 12 WELL TESTING 12.'l General - The provisions of this rule establish minimum standards for the testing of water wells. Every well constructed for the purpose of producing ground water shall be tested to determine: a. a stabilized yield for the well; and b. the production rate of the equipment installed when the well is placed into service. 12.2 Well Yield Test - The yield of a well shall be determined as a stabilized production rate where the withdrawal rate and the drawdown do not change by more than 10 % during the last hour of the test. The test shall demonstrate that either: a. the well is capable of producing the permitted pumping rate for the well; or b. that the maximum yield of the well is less than the permitted production rate. 12.3 Responsibility for Well Yield Test - Well construction contractors are responsible for performing the well yield test and submitting the test data to the State Engineer. lf the construction contractor also installs the production equipment, the well yield test may be combined with the production equipment test, provided that the test meets the requirements of Rule 12.2. The construction contractor may forgo the well yield test if he can show that a licensed pump installer will perform the well yield test with the permanent production equipment within thirly (30) days of completion of construction of the well. lf the pump installation contractor performs the well yield test, he/she shall submit the test information on the Pump lnstallation and Test Report. 12.4 Production Equipment Test - The production equipment installed in wells shall be tested to ensure it is functioning as designed. The test shall demonstrate the production capacity of the equipment as actually installed in the well. lt is the responsibility of the person installing the pumping system to ensure that the production from the well complies with the conditions of the permit. 12.5 Responsibility for Production Equipment Test - Pump installation contractors are responsible for testing thb production equipment installed in a well upon completion of their work. lf the well construction codtractor determined the well yield and submitted a report, the pump installer need not perform another well yield test. lf the pump installer does not perform a well yield test with the permanent irroduction equipment, he shall perform a production equipment test and report the data (results) to the State Engineer on the Pump lnstallation and Test Report. Wells to be plugged and sealed must be plugged in accordance with of the Water Well Construction Rules. A Well Abandonment Report, Form No. GWS-9 must be submitted to confirm plugging and sealing of the well. This form is available from our website(dwr.coloiadb.qoV) or from any Division of Water Resources office- The specific rules-Tor piuggmg-- and sealing wells are found on the reverse side of the Well Abandonment Report form, or under Rule 16 of the Water Well Construction Rules.