HomeMy WebLinkAboutWell Informationre@l COLORADO
Division of Water Resources
Department of Natural Resources
Well Permit Summary Report
THIS PAGE IS NOT THE ACTUAL PERMIT
The information contained on this page is a summary of the permit file and may not reflect all details of the well permit. See full
disclaimer below.
Permit Number: 336579- Receipt: 10039388
Permit Category: Residential WDID:
Permit Status: Permit lssued
Physical Location
Division: 5
District: 45
County: GARFIELD
Physical Address: 11749 COUNTY ROAD 311
,ty & State: SILT, CO
Zip: 81652
Parcel Type:
Parcel Name:
Lot, Block, Filing
No available data
Designated Basin:
Management District:
Denver Basin Aquifer:
Outside
Outside
Outside \
$
.e
e
\N
aa\ \
-\
$
Feature Type Dist N/S Dist E/W Ql0 Q40 Q{60 Sec Townshlp Range PM UTllx UTMy Latitude Longitude Location Accuracy
Well (Application/Permit)NE SW 36 7.0 s 92.0 W s 274591.1 4364643.8 39.40'1875 -107.617828 Spotted from quartors
Well (DWR Located)NE SW 36 7.0 s 92.0 W s 274591.1 4364643.8 39.401877 -107.617829 Digitized
336579-'l of 3 Certified accurate as of 0112112025
Permit Details
Acres ln Parcel:
ercel lDl
Use(s):
Limits:
Aquife(s):
Area lrrigated:
Within Water Service Area
Water Supplier Name:
Type of Sewage System:
Sewer System Details:
40.00
23-2401-362-00-056
Domestic
Yield Amount Depth (T)Depth (B)
Statute:37-92-602(3Xb)(l l)(A) - Exempt statutory
presumption of no injury
Follow Up Permlt Conditions (see actual oermit for more information)
Abandonment Required: No
Meter Required: No
Geophysical Log Required: No
Rule 6,2.2.1 (Notice): Yes
Rule 6.2.3 (Floating Permit): Yes
ALL UNNAMED AQUIFERS
1.00
Septic tank / absorption leach field
Construction/Pump lnstallation Details
Driller: SHELTON DRILLING CORPOMTTON
(SHELTON, WAYNE)
Construction Date:
Completed Well Depth:
Perforated Casing Top:
Perforated Casing Bottoml
'\tatic Water Level:
Well Yield Estimate (GWS-31):
Pump lnstaller:
Last Pump lnstallation Date:
Production Test Yield:
Appl ication/Permit History
Aotion Action Dato Date Received Comment
Application Received 1',il14t2024 CONSTRUCT NEW WELL, ONLY WELL SQUARE 1/4 1/4 SECTION
Permit lssued 1112012024
Permit Expiration Date 1112012026
ApplicanUGontact
Start Date End Date Assoclatlon Type Gontact Name Addr€sg Clty State Zlp Code
1111412024 Owner CASTLE CREEK VALLEY RANCH LOT
15 LLC
1717 W.6TH STREET, SUITE 470 AUSTIN TX 78703
11t1412024 Agent PERRIN, GEOFFREY 1717 WEST 6TH STREET SUITE 470 AUSTIN TX 78703
336579-2of 3 Certified accurate as of 0112112025
Disclaimer
* The information contained on this page is a summary of the permit file and may not refect all details of the well permit. THIS PAGE lS NOT THE ACTUAL
"ERMIT.
fhis page should not be used as a basis for any legal consideration, to determine the allowed uses of the well, to determine construction information, or to
deteimiie the terms and conditions under which the well can operate. The complete well permit file should be viewed to obtain details on the allowed uses and
other relevant information. A complete copy of the file is available in the "lmaged Documents" section of this page, and can be viewed by opening all of the
documents listed in that section.
Not6 that all of the terms and conditions under which a well can operate, particularly for non-exempt wells, may not be specified on the well permit. Wells may
also be subject to relevant statutes, rul€s and decrees. To learn more abou well permifting in Colorado, please visit DWR's Well Permitting Page. lf you have
any questioirs about this well permit file, please contact the DWR Groundwater lnformation Desk at (303) 866-3587 (Hours 9am4pm M-F).
336579-3of3 Certified accurate as of 0112112025
GG} i;llf,,,:j"?il:-'Map Viewer
. Surface Water
* Well Constructed
r Final Permit
x Geophysical Log
+ Active Gage - Diversion
a Active Gage - Reservoir
+ Active Gage - Stream
All Stations
I Township
il seaion
,! o+o
Uj County
Legend
s!r
Location
Notes
585 O 292 585 Feet
1: 3,508 0 This producl is for informational pu4poses and may not have been prepared for, or be suitable for legal,
engineeing, or surveying purposes. Users of this infomation should review or @nsult the pimary data and
information sources to ascedain the usabilw of the informa$on.
Date Prepared: 11n2024 8:24:31 AM
Form No. GWS-07
0712016
EXEMPT
STATE OF COLORADO
DIVISION OF WATER RESOURCES
OFFICE OF THE STATE ENGINEER
1313 Sherman St., Ste 821, Denver, Colorado 80203
(303) 866-3581
INFORMATION FOR WELL PERMITS APPROVED PURSUANT TO CRS 37-92-602
(HOUSEHOLD, DOMEST|C, LTVESTOCK AND EXEMPT COMMERCIAL USES)
Carefully read the conditions of approval on your well permit. The conditions and the information on
this information sheet must be complied with in order for the permit to remain valid.
The well permit number is located in the upper right hand corner of the permit, and the expiration date is located
in the lower right hand corner.
THE WELL PERMIT EXPIRATION DATE IS TWO YEARS FROM THE DATE ISSUED. EvidCNCE Of WEII
construction must be received on appropriate form PRIOR TO THE EXPIRATION DATE OF THE PERMIT.
The required form is the Well Construction and Test Report (Form No. GWS-31).
The expiration date of the permit may be extended one year at a time for good cause shown, at the discretion
of the State Engineer. lf an extension of time is necessarv to construct the well. the owner must file a written
request for the extension. The request must be received bv the State Enqineer prior to the expiration date. The
request must state why the well has not been constructed, and must include an estimate of time required to
construct the well.
Water well construction and pump installation contractors are licensed in Golorado to perform these
specialized tasks. lt is illegal for individuals who do not hold these licenses to construct wells and
install pumping equipment in or on wells. The well must be constructed and pumping equipment
installed by contractors with current license(s) issued by the State of Colorado unless exempted as
described on the reverse side. Please ask to see their license(s). Backhoe Operators and Licensed Plumbers
may or may not hold the respective Well Construction and/or Pump lnstallation licenses. Please be aware of this
when you contract to construct the well and install pumping equipment. The well construction report including a
test of the well yield must be submitted to the office of the State Engineer within sixty (60) days of completion of
the work or within seven days after expiration of the permit, whichever is earlier. The pump installation report
including a pumping system test must be submitted within sixty (60) days of completion of the work. The
contractor(s) must provide you with a copy of the work report(s) filed with the State Engineer. Additional
information regarding well construction, pump installation, required testing and well plugging and sealing
regulations are found on the reverse side of this sheet.
Keep a copy of this permit for your records. The official digital image of the permit is on file in the Denver office
Records Section. You may view or print the entire permit file using our online well permit search tool:
httos://dwr. state. co. us/ToolsA/Vell Permits Hard copies of permit documents may be obtained from our Records
Section for a fee of 50 cents per page. Statutes require that any change of mailing address or ownership be
reported to the State Engineer. Form number GWS-11 is used both by new owners to report ownership
changes and current owners to report address changes.
lf you have questions, contact the Ground Water lnformation Desk at (303) 866-3587, or the Division Office in the
area where your well is located.
Division 1
B1o gtn st., Ste. 2oo
Greeley, CO 80631
(970) 352-8712
Fax: (970) 392-1816
Division 2
310 E. Abriendo Ave Ste B
Pueblo, CO 81004
(719) 542-3368
Fax: (719) 544-0800
Division 3
301 Murphy Drive
Alamosa, CO 81101
(719) 589-6683
Fax: (719) 589-6685
Division 4
2730 Commercial Way (physical)
Montrose, CO 81401
P.O. Box 456Zip 81402 (mailing)
(970) 249-6622
Fax: (970) 249-8728
Division 5
202 Center Drive (physical)
Glenwood Spgs., CO 8'1601
P.O. Box 396 Zip 81602
(mailing)
(970) 945-5665
Fax (970) 945-8741Call First
Division 6
505 Anglers Dr. Suite 101 (physical)
Steamboat Spgs, CO 80487
P.O. Box 773450 Zip 8O477
(mailing)
(97O) 879-0272
Fax: (970) 879-1070
Division 7
160 Rockpoint Dr Ste E
Durango, CO 81301
(970) 247-1845
Fax: (970) 259-0944
Denver Office
1313 Sherman St., Ste 821
Denver, CO 80203
(303) 866-3581
No Fax
WELL CONSTRUCTION AND PUMP INSTALLATION BY THE WELL OWNER
You may construct the well and/or install pumping equipment yourself if the well is foryour own use,,is on
property you own, and is constructed or pumping equipment is installed with eluipment owned _and
operated by you. lt is vour responsibilitv to complete and submit the Well Construction and Test
Report (Form No. GWS-31) and/or the Pump lnstallation and Test Report (Form No. GWS-32), The_se
are available from our website (dwt.cotogdg..g), or from any Division of Water Resources office. The
well must be constructed and the pumping equipment installed in accordance with the wellconstruction
standards of the Board.
The WATER WELL CONSTRUCTION RULES
obtained from our website (dwr.colorado.qov), or
office for a small fee. T'tre-se Rules cover
and BOARD OF EXAMINERS RULES can be
purchased from any Division of Water Resources
the minimum requirements for wellconstruction,
pump installation, disinfection, plugging and sealing and contractor licensing regulations.
if ybu are constructing your own well or installing pumping equipment, it is recommended
thaf you obtain a copy of these Rules for reference.
The well construction and pump installation reports including testing of well yields and pumping
systems must be submitted to the office of the State Engineer by the respective contractors within sixty
(60) days of completion of the work or prior to the expiration date 9f the permit, Whichevgr is earlier.
Your cohtractor(s) must provide you with a copy of the work report(s) filed with the State Engineer.
RULE 12 WELL TESTING
12.'l General - The provisions of this rule establish minimum standards for the testing of water wells.
Every well constructed for the purpose of producing ground water shall be tested to determine:
a. a stabilized yield for the well; and
b. the production rate of the equipment installed when the well is placed into service.
12.2 Well Yield Test - The yield of a well shall be determined as a stabilized production rate where the
withdrawal rate and the drawdown do not change by more than 10 % during the last hour of the test. The
test shall demonstrate that either:
a. the well is capable of producing the permitted pumping rate for the well; or
b. that the maximum yield of the well is less than the permitted production rate.
12.3 Responsibility for Well Yield Test - Well construction contractors are responsible for
performing the well yield test and submitting the test data to the State Engineer. lf the construction
contractor also installs the production equipment, the well yield test may be combined with the production
equipment test, provided that the test meets the requirements of Rule 12.2. The construction contractor
may forgo the well yield test if he can show that a licensed pump installer will perform the well yield test
with the permanent production equipment within thirly (30) days of completion of construction of the well. lf
the pump installation contractor performs the well yield test, he/she shall submit the test information on the
Pump lnstallation and Test Report.
12.4 Production Equipment Test - The production equipment installed in wells shall be tested to
ensure it is functioning as designed. The test shall demonstrate the production capacity of the equipment
as actually installed in the well. lt is the responsibility of the person installing the pumping system to ensure
that the production from the well complies with the conditions of the permit.
12.5 Responsibility for Production Equipment Test - Pump installation contractors are responsible
for testing thb production equipment installed in a well upon completion of their work. lf the well
construction codtractor determined the well yield and submitted a report, the pump installer need not
perform another well yield test. lf the pump installer does not perform a well yield test with the permanent
irroduction equipment, he shall perform a production equipment test and report the data (results) to the
State Engineer on the Pump lnstallation and Test Report.
Wells to be plugged and sealed must be plugged in accordance with of the Water Well
Construction Rules. A Well Abandonment Report, Form No. GWS-9 must be submitted to
confirm plugging and sealing of the well. This form is available from our website(dwr.coloiadb.qoV) or from any Division of Water Resources office- The specific
rules-Tor piuggmg-- and sealing wells are found on the reverse side of the Well Abandonment Report
form, or under Rule 16 of the Water Well Construction Rules.