Loading...
HomeMy WebLinkAboutEngineer's Framing LetterGRAND JUNCTION LINCOLN DeVORE, Inc. GEOTECHNICAL ENGINEERS - GEOLOGISTS 2191 Canyon Ct. W. Cell: (970) 260-3332 Grand Junction, CO 81507 E-Mail: gildemnearthlink.net September 25, 2024 Mr. Tyler DiDonato Shining Light Services P.O. Box 759 Fruita, Colorado Re: Header Framing, Garfield County Building Permit # BLRE .4-24-8614, 236 Limberpine Circle, Battlement Mesa, Colorado Gentlemen: Edward M. Morris, P.E., of Grand Junction Lincoln DeVore, observed the wood framing provisions detailed on the Foundation Design prepared by Grand Junction Lincoln DeVore, Inc. on 9-18-2024. The loading conditions for both of the Header Designations (B-1 & H-2) on the Grand Junction Lincoln DeVore, Inc. Plans were observed and confirmed to be lightly to very lightly loaded, considering the window size of 4 feet. The specified header pieces were upsized for deflection considerations. The use of a single King Stud & single Jack Stud on each end is appropriate for these circumstances. My observations and measurements indicated that the special framing elements were constructed in substantial conformance with the foundation design by Grand Junction Lincoln DeVore. We hope this letter has provided you with the information required. If questions arise, or if further information is needed, please feel free to contact Grand Junction Lincoln DeVore at any time. Respectfully submitted, GRAND JUNCTION LINCOLN DeVORE, INC A,c by: Edward M. Morris,'.E,— i J Principal Engineer s4",,"�r` A GJLD Job No. 95824-GJ