Loading...
HomeMy WebLinkAboutEngineer's OWTS Design Planotnr7 S GTLITHOMPSON February 21,2025 Jim and Connie Baker 1155 County Road 237 silt, co 81652 Subject:Soil Evaluation and Onsite Wastewater Treatment System (OWTS) Design Proposed Baker Residence 1 155 County Road 237 (a.k.a. Parcel No. 2127253000072) Garfield County, Colorado Project No. GS06931 .000-1 32 As requested, we have prepared this Soil Evaluation and Onsite Wastewater Treatment System (OWTS) Design for the proposed residence at the subject location. The soil evaluation is required by the Garfield County Board of Health (BOH) to charac- terize subsurface conditions where OWTS are to provide sewer service for residential dwellings. Design documents are included with this report. This report and information should be presented to the BOH for the application of the septic permit. We previously provided a Soils and Foundation lnvestigation for the subject site (see CTLIT Project No. GS06931.000-120-R1, reportdated December 17,2024). We are concurrently perform- ing structural engineering services for the proposed residence. PROPOSED CONSTRUCTION A modular, single-family residence is proposed at the subject site. We under- stand the residence will be supported by a traditionalfooting foundation system with a structurally supported main levelfloor. The residence will contain 3 bedrooms. The resi- dence will be accessed by an existing gravel driveway. The approximate location of the proposed residence is shown in Figures 2 and 3. SITE DESCRIPTION On January 26,2025, a site evaluation was conducted by a representative of CTLIT. The 4O-acre parcel addressed as 1155 County Road 237 is located west of Har- vey Gap Road near Silt, Colorado as shown on Figure 1. The proposed building area is accessed via a shared gravel driveway that starts on the west side of Harvey Gap Road. The site is an agricultural parcel used for grazing livestock and growing hay. A manmade pond is constructed along the north property line. The proposed building area is im- proved with multiple shed structures. An irrigation ditch lined with boulders is constructed along the west side of the gravel driveway. The irrigation ditch is utilized on a semi- regular basis in the summer, depending on neighboring water needs. lt is our under- standing, based on conversations with the Client and property owner, that the irrigation ditch diverts water away from the proposed STA location, leaving this portion of the property dry. The irrigation ditch was dry at the time of our site investigation. A buried irrigation lateral is constructed along the east side of the property line. 1F 500 Brian Avenue, Unit A, PO Box2122 | Silverthorne, CO 80498 | Phone: 970453-2047 | www.ctlt.com The ground surface in the area of the proposed STA slopes down to the south at approximately 6 percent. The landscape position of the test site is LL slope shape, as represented in the EPA's Onsife WastewaterTreatment Systems Manual. Ground cover at the proposed soil treatment area (STA) consisted of grass and sage brush. Potable Water Potable water is to be supplied by an existing well located at the approximate lo- cation shown in Figure 2. A minimum distance of 10 feet must be maintained between the septic tank and water supply lines. A minimum distance of 5 feet must be maintained between the sewer and effluent transport lines and the water supply line. To the best of our knowledge, based on records research, the proposed STA is located greater than 100 feet from any existing wells. Surface Water Features/Setbacks A minimum setback distance of 50 feet must be maintained between the irriga- tion ditch and the septic tank, sewer and effluent transport lines, and STA. Maintaining 50 feet between the irrigation ditch and the septic tank, effluent transport lines, and sew- er lines is not feasible. The sewer and effluent transport lines should be cased entirely according to the BOH OWTS Regulations Table 7-1, Note 2. We can reduce the setback distance between the irrigation ditch and the septic tank by lining the irrigation ditch with a 30 mil PVC liner, as shown in Figurc 3. A minimum setback distance of 25 feet must be maintained between the buried irrigation lateral and the septic tank, sewer and effluent transport lines, and STA. A min- imum setback distance of 10 feet must be maintained between the property line and all OWTS components. The minimum setback distance between the septic tank and a lined irr"igation ditch is 10 feet. A minimum setback distance of 5 feet must be maintained be- tween the proposed residence and the septic tank. Prior to construction, we recommend that a professional land surveyor stake the components of the OWTS to ensure that minimum setback distances can be maintained SUBSURFACE CONDITIONS The subsurface conditions were investigated by observing the excavation of two profile pits (see Figure 2 and Figure 9). Subsurface conditions encountered in the pits consisted of approximately 12 inches of topsoil. Beneath the topsoil, we encountered loam soils to a depth of 8 feet in Pro-1 and Pro-2. The loam soils contained 0-10 percent gravel in Pro-1 and up to 35 percent gravel below 5 feet in Pro-2. The soils had a granu- lar structure shape, moderate structure grade and friable consistence. The loam soils classified as Soil Type 2. No limiting layers (bedrock or indications of groundwater) were noted in the profile pits at the time of our subsurface investigation. SOIL TREATEMENT AREA - CHAMBERS IN BEDS The STA size is designed based on the loam as the receiving soil, which was de- termined to be SoilType 2 in Table 10-1 of the BOH OWTS Regulations. The OWTS Regulations provide minimum STA sizes for OWTS design. Refer to Figures 3 through 8 and Appendix B for recommendations for OWTS components. All components of the 2 BAKER RESIDENCE 1 155 COUNTY ROAD 237 crLlr pRoJEcr No. GS06931.000-132 ffi OWTS shall meet or exceed BOH regulations. Our STA recommendations are based on the following criteria: *Table 6-1 of the BOH OWTS Desisn Results Minimum Recommended Baseline STA Size 525 ft2 576 ftz Number of Chambers 43.8 48 Septic Tank Size* (Gallons)1,000 1,250 * Tabte g-1 of the BoH oWTS regutations. A representative of CTLIT shall observe the ground surface at the STA bottom to verify conditions are as expected. The STA bottom shall be scarified prior to chamber placement. Wheeled traffic that can compact the soil and impede percolation must be avoided in the STA excavation. Grazing of livestock above the STA can also compact the soil and must be avoided before, during, and after construction. Surface Drainaoe The STA must be protected from concentrated surface runoff before, during, and after construction. Final grading shall provide for either sheet flow over the STA or a swale shall be provided on the uphill side of the STA to divert surface runoff around the STA. Ponding water above the STA must be avoided, or the STA could be hydraulically overloaded and fail prematurely. SEPTIC AND DOSE TANKS A minimum 1,OOO-gallon septic tank is required for a 3-bedroom residence. We recommend a Front Range Precast, 1,250-gallon, three compartment electric lift septic tank. An Orenco Systems PF-5005 high head effluent pump should be placed within a Biotube Pump Vault placed in the lift station chamber of the tank See Exhibit B. a a We should be advised to revise our recommendations if future bedrooms or other items that may result in an increase of flow or strength of wastewater are planned. o The tank must be set level. The excavation bottom should be free of large rocks and other objects that could damage the tank. A 4- to 6-inch-thick leveling course of CDOT Class 6 base course aggregate is recommended. 3 BAKER RESIDENCE 1 155 COUNTY ROAD 237 CTLIT PROJECT NO. GS06931 .000-1 32 Design Requirements No. of Bedrooms 3 Design Flow Rate *450 spd Tvpe 2Receiving Soils TL1Treatment Level 0.6 sal/ft'zldavSoilApplication Rate Adjustment Factors for Chambers in Bed o.7 a a Tank should be backfilled in accordance with manufacturer's recommendations. A minimum of 2 feet and maximum of 4 feet of soil cover should be provided over the tank. Soll oan bo mounded over the tank to aohleve the 2 foot mlnlmum soll cover. Risers should be used to extend the lids to finished grade. Exposed lids should be secured against unauthorized entry. Bottom risers should be sealed watertight to top of tank. a Tank must meet County Regulations EFFLUENT PUMP An Orenco Systems PF-5005 high head effluent pump should be used to pres- sure-dose the STA. The pump should be housed within a Biotube Pump Vault in the lift station chamber of the septic tank. a a Pump should be capable of a flow rate of 32.5 gallons per minute at 19.8 feet of total dynamic head. The distribution laterals have a volume of approximalely 22 gallons. Along with the transport pipe and manifold, the total volume is about 35 gallons. The on-off float within the lift station chamber should be set 16 inches apart to dose about 105 gallons. There will be minimal drain back to the dose tank. Based on the design flow of 450 gpd, the pump will dose between 4 and 5 times per day. A pump performance curve is provided in Exhibit B. Pump should have a quick-disconnect within 24 inches of the access lid to allow for routine maintenance and replacement. Set high-water alarm float to allow for 3OO-gallon reserve, or as much as practi- cal. Pumps, floats, and control panel to be wired to dedicated circuit. Final connection by licensed electrician. All connections to be separate from tank environment and weathertight to prevent corrosion. A signal device must be installed that will provide a recognizable indication to the user should the pump fail/malfunction. This indication orwarning must be a visual and audible signal located within visual and audible range of the user. A cycle or elapsed time meter is required to be installed within control panel a a a SEWER LINE a BAKER RESIDENCE 1 155 COUNTY ROAD 237 cTLIT PROJECT NO. GS06931.000-132 a The sewer line from the building to the septic tank should not be less than the di- ameter of the building drain and not less than 4 inches in diameter. The sewer pipe should have a rating of SDR35 or better. The sewer line must be cased entirely according to BOH OWTS Regulations Ta- ble 7-1, Note 2. 4 Sewer pipe should be sloped at 2% minimum from the building to the septic tank except for the last 5 feet, which should be sloped no more than 4o/o to help limit disturbance of solids in the tank. A minimum of 40 inches of soil cover should be provided over the sewer pipe. Paved areas, patios, or other areas without vegetative cover may be more sus- ceptible to frost. 2-inch blue board insulation (R-10 min.)should be used in any frost susceptible areas where 40 inches minimum cover cannot be achieved. The sewer pipe should be bedded in compacted T,-inch roadbase or native gran- ular soils provided that the native soils contain no angular rocks or rocks larger than2Tz inches in diameter to help prevent settlement of the pipe. Sags could cause standing effluent to freeze and damage piping. lnstall cleanout pipes within 5 feet of the building foundation, where the sewer pipe bends more than 45 degrees for every 40 feet of length or more, and every 100 feet of sewer pipe. We recommend using a double-sweep cleanout where possible. All 90-degree bends should be installed using a 90 degree long-sweep or by us- ing two 45-degree elbows. EFFLUENT TRANSPORT PIPE Effluent transport pipe shall consist of 1.S-inch diameter Schedule 40 PVC pipe, or stronger, and be installed from the dose tank to the STA manifold piping. It is imperative that the transport line completely drains between pump cycles, otherwise freezing will occur. We estimate the high point of the line will be at the lift station chamber. The piping must be sloped a minimum of 2o/o to drain from the dose tank to the STA. Sags along the effluent transport line create the poten- tial for freezing and must be avoided. A 1/4-inch weephole should be provided in the effluent transport pipe at the high point within the lift station chamber to allow drainage after dosing. The effluent transport pipe should be bedded in compacted lo-inch roadbase or native soils provided that the native soils contain no angular rocks or rocks larger than 2Tz inches in diameter to help prevent settlement of the pipe. Sags could cause standing effluent to freeze and damage piping. A minimum of 18 inches of cover soil should be provided over the effluent transport pipe. Paved areas, patios or other areas without vegetative cover may be more susceptible to frost. ln these areas, or if less than 18 inches of cover is provided, the pipe should be insulated on top and sides with 2-inch-thick blue board insulation (R-10 minimum). The effluent transport line must be insulated beneath where it crosses beneath the proposed driveway. BAKER RESIDENCE 1 155 COUNry ROAD 237 a a a a a a a a 5 cTLIT PROJECT NO. G506931 .000-1 32 ffi DISTRIBUTION LATERAL PIPE Distribution lateral pipe shall consist of 1.5-inch diameter Schedule 40 PVC pipe, installed level. a Piping should be perforated as noted on STA Plan View, Figure 5. A cleanout should be provided at the end of each lateral, see detail in Figure 7 I NSTA L LATION O B S -E RVATIONS BOH will need to observe the OWTS during construction. BOH also requires that the design engineer observes construction to verify substantial compliance with the de- sign. BOH and our office should be given proper notice to observe the OWTS prior to backfilling and any other stages of construction as required. lnstallation observations by this office are not included in the cost of this study and will be billed to the client or oth- ers as authorized by our service agreement. MAINTENANCE OPERATION The OWTS requires conscientious maintenance and operation to provide a rea- sonable service life. The owner must consider that the OWTS does not have the same "unlilrtited" capacity as a municipal sewer system. OWTS are slzed for a llmlted hydrau- lic loading and exceeding that loading on a continual basis can harm the system and cause irreparable damage. The septic tank should be checked periodically for scum and sludge accumulation and pumped as necessary. Refer to Exhibit A for general mainte- nance and operation considerations. An installer that is experienced and approved by the BOH is recommended for the installation of the OWTS. LIMITATIONS Accepted industry standards, methods and state andlor county guidelines were used to conduct this investigation. Exposure to subsurface conditions is limited from ob- servations of profile pits. Variations of subsurface conditions present under the STA site may exist from those observed in the profile pits. Typical wastewater flows and charac- teristics for residential dwellings are provided by state and/or county guidelines. ln some cases, actualflows and characteristics may vary substantially from typical estimates. Wastewater strength is assumed to be typical residential. Some fixtures, such as gar- bage disposals, washing machines, and water treatment systems, can increase demand on the OWTS and additional flows should be accounted for in the capacity of the OWTS. It would also be prudent to oversize the septic tank and/or STA for enhanced perfor- mance and for future improvements to the residence. This investigation is not absolute, and these variations may affect the perfor- mance of the OWTS. BOH and CTllThompson should be notified if subsurface varia- tions are observed during construction or if ther^e are any changes in the pr"oposed loca- tion or construction. Due to variables, such as, but not limited to construction methods, individual usage, maintenance habits, soil heterogeneity and climate, no warranty ex- pressed or implied as to the longevity or performance of the OWTS is made. We en- BAKER RESIDENCE 1 155 COUNTY ROAD 237 cTLIT PROJECT NO. G506931.000-132 a 6 ffi courage owners of OWTS to visit www.nesc.wvu.edu for additional resources for litera- ture about OWTS. Due to the changing nature of onsite wastewater engineering standards and practices, the information and recommendations provided in this report are only valid for two years following the date of issue. Following that time, our office should be contacted to provide, if necessary, any updated recommendations and design criteria as appropri- ate. CTllThompson appreciates the opportunity to be a member of your team. lf you have any questions regarding the information in this report, please do not hesitate to contact us at your convenience Very truly yours, cTLl THOMPSON, INC Reviewed by: Brittany Niggeler Staff Engineer Attachments BAKER RESIDENCE '1155 COUNry ROAD 237 oTLIT PROJECT NO. GS06931 000-132 Gregory A. Crum, P.E. Principal Engineer cc. Exhibits A and B Figures 1 through 9 iimbake1390@smail. com conn ie. renee. baker@omail. com 7 EXHIBIT A ONSITE WASTEWATER TREATMENT SYSTEM MAINTENANCE AND CARE Maintenance that involves possible human contact with sewage materials should be conducted by a qualified professionalthat is aware of, and has experience in dealing with biologic hazards, and implementation of precautionary methods to reduce the risk of illness or injury caused by potentially hazardous conditions. Routine Maintenance For proprietary systems, inspection and maintenance of the system must be per- formed in accordance with the manufacturer's recommendations. At a minimum, maintenance must taken place every 6 months for higher level treatment systems for the first year of operation, followed by annual inspections for the life of the system or when holding tanks or vaults reaoh eighty peroent of capacity. Non-routine Maintenance Leaks from faucets, toilets and other plumbing that drains into the sewer should be repaired before the STA has been damaged. Backfill materials in trenches and excavations may settle over time. Areas that have settled should be refilled, re-graded and re-vegetated to promote positive surface drainage away from OWTS components. a Disposalof harsh chemicals and non-biodegradable items into the sewer should be avoided. Avoid septic tank additives. Some additives can damage your system. Under normal conditions human wastes contribute sufficient "biology" to maintain activi- ty of the system. I a Avoid discarding garbage disposal grindings, fats and grease in the sewer Liquid laundry detergents are preferred over powder detergents. Some powder laundry detergents contain fillers that may not completely dissolve and contribute to the sludge or scum. Septic tanks and filters may require more frequent service if powder detergents are used. a The surface and slopes of the STA should be seeded with a nativetype or drought resistant vegetation cover to reduce erosion. Vegetation over the STA should be kept mowed. Gardens should not be located over STAs. a a a a a BAKER RESIDENCE 1 155 COUNTY ROAD 237 CTLIT PROJECT NO. GS06931.000-132 Exhibit A-1 Maintain a packet that includes the OWTS design report, maintenance records, phone numbers of the installer and septic tank pumper and other paperwork re- lating to the OWTS in a readily accessible location. Other Considerations The system is designed for a finite hydraulic load. Overloading the system with frequent peak loads and continuous high loads can harm the system. Continued high sewer volumes not accounted for in the design of this system may require additionalsoiltreatment area. Conventionally, the system is not intended to ac- commodate hot tubs or spas. Spread laundry loads through the week. Limit usage to one laundry load in a day or 4 per week or upgrade the OWTS to accommodate additional flow. Practice water conservation. lnstall water saving devices to reduce wastewater volume. lrrigation over the STA should be avoided or extremely limited. Watering over the STA will add to the hydraulic loading, which can adversely affect the perfor- mance, and longevity of the OWTS. Plumbing from underground irrigation systems should not be allowed within 5 feet of the backfill of the STA. Livestock and wheeled traffic or other activities that can compact the soil should not be allowed over the STA. Trees and shrubs should not be planted within the plant's root zone of the STA Trees should not be planted so that the STA would be shaded as the tree ma- tures. Consult with your local nursery for tree information. Some water treatment systems produce significant amounts of "rejecf'water that can increase hydraulic loading to the OWTS. The "reject" water is not considered wastewater and does not need to be treated. Other uses for this water, such as irrigation, should be considered before connecting the treatment system to the sewer. The STA will need to be upgraded if significant amounts of "reject" water are introduced into the system. lnstaller:Phone Number: Pumper:Phone Number: BAKER RESIDENCE 1 155 COUNry ROAD 237 cTLIT PROJECT NO. G506931.000-132 a o o a a a a a Exhibit A-2 ffi EXHIBIT B Septlc Tank Product Sheet Biotube Pump Vault - Technical Data Sheet Pump Performance Curve BAKER RESIDENCE 1 1 55 COUNry ROAD 237 cTLIT PROJECT NO. GS06931.000-132 EXHIBIT B 1250 Gal. Three Compartment Electric Lift Septic Tank Ftffi FrsgS - PLAN 2'X 1'Modified riser with Orenco splice box float tree bracket, optional concrete or other riser system available, see page 102 #3 Lift loop lnlet Outlet 5'S" 10'$' SECTION Butyl rubber sealant r-ffi#' o 'l'l 12" - 2" Cast-A-Seal Gasket 4" Cast-A-Seal Gasket 5'-10' 55"52" Note: N.T.S. e Monolithic tank meets ASTM C-1227 Spec. for water and wastewater structures. r Butyl rubber sealant meets Fed. Spec. SS-S-210A. (Provided with tank) e All plumbing shown in diagram is 4" SDR 35. (Provided with tank) o Follow standard practice for installation of underground precast concrete structures. (See page 2 for ASTM C-891 Summary) -----{-L --fl.-ll@24" Access hole typical Effluent pump (per specification) / alarm box, float tree, control swiiches installed and pump plumbed to slub-out including preassembled pipes and fittings. Connections to electrical source by others. 35" A 58* '-JT -'-' - H \NA-I-ER-rrcH-r!':Z-Z- Front Range Precast Concrete, lnc. 5901 Dexter Street, Unit 102, Commerce City, CO 80022 Phone (303).142-3207 -,tffi1X.;::f - Fax (303).r42-320e Approximate Weights Total 13,620|bs Baffle Walls 1,820 lbs Lid 3,370 lbs Tank 8,430|bs Discharge per Gycle Variable 6.6 Gal. / Verticalinch Llft Station Ghamber 330 Gal. Total Capacity: 1390 gallons Gapacities A(seilf's) B 420640 Part # PCA-o00-267 / \ / A \ t_ \ I EI' \ DSupport pipes G c F Top view Standard Dimensions, in (mm)2in (50mn Specilications Side cutaway view H A B c D E 3 (76) 4 $42) 17,3 (439) 16.6 (422) 1 2 (305) Drain valve ball Model PVU48-1818 F Vault height, in (mm) 48 (1219) G Lowest float setting point, in (mm) 21 (533) H lnlet hole height, in (mm). 18 (454 I Biotube cartridge height, in (mm) 18 (454 Biotube mesh opening, in (mm) 0.125 (3.2) Filter flow area, fF (m'?) 4.4 (0.4) Filter surface area, ft'(mJ 14.5 (1.35) Maximum flow rate, gpm (Usec) 140 (B.B) r May vary depending on the conliguralion ot the tank PUU57-1819 s7 (1448) 29 (737) 1e (483) 18 (457) 0.125 (3.2) 4.4 (0.4) 14,5 (1,35) 140 (8.8) PVU68-2419 E8 (1727) 35 (88e) 1e (483) 24 (610) 0.125 (3,2) 5,9 (0.5) 19,7 (1,83) 140 (8.8) PVU84-2419 84 Q134) 51 02e5) 19 (483) 24 (610) 0j25 (3.2) 5.s (0.5) 1e.7 (1 .83) 140 (8.8) PVU95-3625 e5 (241 3) 50 (1 270) 25 (635) 36 (914) 0.125 (3.2) s.0 (0,84) 30 (2.7e) 140 (8.8) NTD.GOP-PVU-5 Rev.1 @06/24 Page 2 ol2 0renco Systems@ . 800-348-9843 r +1 541-459-4449 . wwworenco,com Pump Selection for a Pressurized System - singte Famity Residence Project GS06931.000-132 / Baker Residence Parameters 1.50 102 40 1.50 None 27 40 1.50 I 26 40 1.50 5132 5 5 None 0 inches feet Discharge Assembly Size Transport Length Transport Pipe Class Transport Line Size Distributing Valve Model Max Elevation Lift Manifold Length Manifold Pipe Class Manifold Pipe Size Number of Laterals per cell Lateral Length Lateral Pipe Class Lateral Pipe Size Orifice Size Orifice Spacing Residual Head Flow Meter 'Add-on' Friction Losses Calculations feet feet inches inches feet inches inches feet feet inches feet 160 140 120 100 80 60 40 20 gpm gpm n o,oIL EoF dl!ot (, Et! o 6 o Minimum Flow Rate per Orifice 0.68 Number of Orilic€s per Zone 48 Total Flow Rate per Zone 32.5 Number of Laterals per Zone 8 % Flow Differential lsulast Orifioe 0.1 Transportvelocity 5.1 Frictional Head Losses Yo fps Loss through Discharge Loss in Transport Loss lhrough Valve Loss in Manifold Loss in Laterals Loss through Flowmeter Add-on' Friction Losses Pipe Volumes 3.2 8.2 0.0 0.5 0.0 0.0 0.0 feet feet feet feet feet feet feet 0 Vol of Transport Line Vol of Manifold Vol of Laterals per Zone Total Volume 10.8 2.9 21.9 35.6 gals gals gals gals 0 10 20 PumpData 30 40 50 Net Discharge (gpm) 60 70 80 Minimum Pump PF5005 High Head Effuent Pump 50 GPM, 1/2HP 11 5/230V 10 6OHz, 2001230V 3g 60Hz PF5007 Hish Head Effiuent Pump 50 GPM,3/4HP 23OV 1A 6OH42OU23O|46OY 3A 6OHz PF5010 High Head Efiuent Pump 50 GPM, 1HP 23OV 1A 6OHz, 2OOI46OV 30 60Hz PF50'15 High Head Effluent Pump 50 GPM, 1-1l2HP 230V 1A 6OHZ',200V 30 60Hz Design Flow Rate Total Dynamic Head 32.5 19.8 gpm feet @C,rencoW System Curve:- Pump Curve: '': PUmp uprmar Kange: Operating Point:O o Design Point: tr Nol to scolc 'ii. lr#r . iitr* _- P rop ert y Loco tion 3{ ftl 't l!-. .f.t gL f-. i!i*i ; BAKER RESIDENCE 1I55 COUNTY ROAD 237 cTLrT PROJECT NO. G806931.000-132 Vicinity Map FIGURE 1 t0 -'\. l t 'J', ., 1 u/-'r. I Approxi mate Well 70.0' "--t \ 2 i} + Propos Residence Location Boulder Wall & Irrigation Ditch Grauel Dri Shed----->'. hed ) Pro-2 tFue I RESIOENCE 1155 COUNTY ROAD 237 T PROJECT NO. G506931 APPROXIMATE SCALE: 1" = 50' Locations of Profile Pits FIGURE 2 Pro-1 Shed t +ffi + + + Min.6' between beds + + ( I I I I I I I I I , I I I I ///,/III I tt APFROXIMATE SCALE: '1" = 40' I I I I I I I I I I I I I tankresidence to 5-foot transport lines cased entirely according to Regulations Table 7-1 Note 2 and sewer H OWTS1O-foot lined irrigation ditch to septic tank. ditch lined with 30 mil liner or equivalent. Section of setback buried irrigation lateralto Bed 1 {--- 1O-foot setback pro components. line to setback from inigation ditch to Setbacks to Proposed Location of OWTS FIGURE 3 PROJECT GS06931.00G132 EAKER RESIDENCE 1155 COUNTY ROAD 237 Ir I ncentrated surface drainage, irriga or runoff. Final grading to divert surfa flow around STA, or sheet flow STA. Standing water during and m + APPROXIMATE SCALE: 1" = 40' ffi+ \ + + 4-inch sewer pipe and double sweep cleanout within 5 feet of foundation wall. Sewer pipe must be sloped a minimum of 2o/o to drain to septic tank. BAKER RESIDENCE 1 1 55 COUNTY ROAD 237 cTLIT PROJECT NO. GS06931.000-132 + + \ + \ / I , I I I I / I I I Proposed Location of OWTS FIGURE 4 1,250-gallon three compartment electric lift septic tank. Fitted with a high-head effluent pump in a Biotube Pump Vault within the lift station chamber. See Exhibit B. Top of tank approximate elevation = 5,888'. Soi may need to be mounded above top of tank to create minimum 2-foot nc.Front Range P e 1.S-inch effluent transport line at a minimum 2o/o to drain from high point at septic tank down to each bed in the I I I { ili.::ij 'i STA: 2, 12'x24'beds with 4 rows of 6 lnfiltrator Quick4 Plus Standard Chambers each (24 chambers per bed, 48 chambers total, Figures 5-7). lnstalled on contour. Site grading must maintain min. 1'and max. 3'cover above top of chambers. lnfiltrative surface approximate elevations = 5,883'. Orenco high-pressure gate installed in insulated sprinkler box to ulate flows between Bed 1 and Bed 2. Ball valve not a suitable Min. Soil Treatment Area = 529 tF 24 Quick4 Plus Standard@ Chambers each 48 Chambers total = 576 ftz ffi2 beds Min.6' separation IBeTZ BAKER RESIOENCE 1 155 COUNTY ROAD 237 CTLIT PROJECT ^lO. GS06931.000-1 32 STA Plan View FIGURE 5 1.5O-inch transport line from dose tank. Sloped at2% min. to drain from high point down to STA. Connected to manifolds with tee-fittings as shown. Do not connect directly to lateral, 1.S0-inch solid manifolds. lnstalled Level U 4 rows of 6 lnfiltrator@ Quick4 Plus Std.@ Cha,nbers. 24 chambers per bed, 48 total. -++- -++- 1.S-inch Sch 40 PVC pipe with 6 (six) 5/32-inch orifice holes per lateral at S-feet on-center (48 orifices total). Orifice holes facing upward anc every fifth hole facing downward. Orifice shields installed on downward facing orifices. Hung from chamber tops. - See Figures 6 through B. Orenco high-pressure gate valve installed in insulated sprinkler box to regulate flows between Bed 1 and Bed 2. Ball valve not a suitable alternative. ! Observation ports at each corner of each bed (8 total). See Figure 7. Distribution Lateral Cleanouts. See Figure 7. Slope Establish Vegetative Cover. 3' max, 1' min. cover above chambers. Seeded and sloped to sheet flow. Grade to prevent ponding above STA. Approximate existing ground surface. 1'min. Scarify ground surface before placing chambers. Avoid compacting infiltrative surface. 1.50" diameter perforated SCH40 PVC distribution pipe installed level. Suspend with polypropylene zip ties (minimum one tie per chamber). 24 lnfiltrator@ Quick4 Plus Std.@ Chambers per bed with dispersal lines hung from top. STA CROSS SECTION (NOT TO SCALE) ffi 1'min.*l r- Soil Type 2 . l*'mrn. 3H 1V:. 1' max cut from existing t 'l="j 12' (4 rows of chambers Notes: 1. One bed shown, two beds to match.2. Soil type must be confirmed by a representative of CTLIT prior to construction of STA.3. STA must be protected from concentrated surface runoff or flow. Standing water above the STA must be avoided. BAKER RESIDENCE '1 155 COUNTY ROAD 237 cTLrT PROJECT NO. GS06931.000-132 STA Cross Section FIGURE 6 ffi SIDE VIEW oo oo Quick4 Plus @ Standard Ghambers Dia. Observation PlpeAttach Threaded Cap with 5i32-lnch Hole Drilled in Top for Squirt-Height Test End Cap Polypropylene Plastic Pipe Strap with 120 lbs ensile Strength at Every Chamber Connection 1 j -lnch Ball 1 ! -lnch Long Sweep Elbow or two 45 degrcc clbows Dispersal Line per Design END VIEW Attach Threaded Cap with 5/32-lnch Hole Drilled in Top for Squirt-Height Test Use Hole Saw to Cut Pre-Marked Circle. Adapted from drawings provided by lnfiltrator@ Systems lnc. BAKER RESIDENCE 1 1 55 COUNTY ROAD 237 cTLtT PROJECT NO. GS06931.000-132 Distribution Lateral Cleanout Details FIGURE 7 Box (8 min.) for ground or place in lrrigation arked Circle. Secure in with a D Screw -lnch Ball o o o Small Valve Cover Box or lrrigation Valve Box at Grade. Fill Box with Fiberglass lnsulation. End Cap ffi I NFILTRATOR WATER TECHNOLOGIES QUICK4 PLUS STANDARD CHAMBER PRODUCT SPECIF ]CATIONS (NOT TO SCALE) INSPECTION PORT 2" diam. TOP VIEW SIDE VIEW QUICK4 PLUS ALL.IN.ONE 12 END CAP a(, 5o END VIEW INSPECTION PORT 4" diam. 1?', PRESSURIZED PIPE DRILL POINTS LOCATIONS (2 PLACES) -o (EFFECTTVE LENGTH) (^) (,(,G)$, INVERT Quick4 Plus Standard Chamber Prod uct Specifications FIGURE 8 BAKER RESIDENCE 1 155 COUNTY ROAD 237 cTLtT PROJECT NO. GS06€31.000-132 EoB ffi PRO-1 ELEV.=5,884' PRO_2 ELEV.=5,884' 5,885 9,250 Approx. lnfiltrotive Surfoee flav. = 5,885' 5,880 9,245 5,875 9,240 5,E70 9,255 5,E65 9,230 LEGEND: TOPSOIL; cloyey sond, wilh roots ond orgonics, slighlly molsl, dork brown. LOAM; 0-102 grovel ln Pro-l, up to 55 percent grovel below 5 feel ln Pro-2, gronulor siruclure shope, moderols structure grode, frloble conslslence, 10 YR 5/8. Soll Type 2. tro o+ o f t -1oo +oolr s g o o o lrl NOTES: 1. The plts wer€ €xcovoled wllh q lrock-mounled excovolor on 1/26/25. 2, No indicollons of seosonol groundwoler were noled ln lhe profile plls of the lime of excovollon. Groundwoter levels con fluctuote. Tho plis wcre bockflllcd. 3. Pil locolions os shown in Figure 2 were meosured uslng slte feolures ond should be consldered opproxlmote. 4. Pll elevotlons ore eslimoled from topogrophy shown ln Figure 2 ond should be consldered opproxlmote. Relollve elevollons were checked by hond level, 5. These profile pils ore subjecl lo lhe explonolions, limilolions ond conclusions conloined in ihis reporl. BAKER RESIDENCE 'l 155 couNTY ROAD 237 cTLIT PROJECT NO. GS06931.000-132 Summary Logs of Profile Pits FIGURE 9