Loading...
HomeMy WebLinkAboutEngineer's OWTS Design PlanlGn Hr#*fi'ffi:ffi1li:''i*"' An Employcc Owncd Co'mFsny 5020 County Road 154 Glenwood Springs, CO 81601 phone: (970) 945-7988 fax: (970) 945-8454 email : kaglenwood@kumarusa.com www.kumarusa.com Office Locations: Denver (HQ), Parker, Colorado Springs, Fort Collins, Glenwood Springs, and Summit County, Colorado ONSITE WASTEWATER TREATMENT SYSTEM DESIGN PROPOSED RESIDENCE PARCEL 13, HrGH ASPEN RANCr{ I422HIGH ASPEN DRTVE GARFIELD COUNTY, COLORADO PROJECT NO. 25-7-1 14.02 MARCTT 17,2025 PREPARED FOR: TED A}{D KAREN MILLER 1248 RIMROCK DRTVE RTFLE, COLORADO 81650 ted@.tedmillerconsulting.com TABLE OF CONTENTS INTRODUCTION. PROPOSED CON ST'RUCTION SITE CONDITIONS.. .....- I - I I 1SUBSURFACE CONDITIONS OWTS ANALYSIS ...... DESIGN RECOMMENDATIONS SOIL TREATMENT AREA...... owTS coMPoNENTS ............ OWTS OPERATION AND MAINTENANCE OWTS HOUSEHOLD OPERATION ............ OWTS MAINTENANCE....... OWTS CONSTRUCTION OBSERVATION LIMITATIONS...... FIGTIRES FIGURE 1 _ OWTS SITE PLAN FIGURE 2 _ USDA GRADATION TEST RESULTS FIGURE 3 _ SOIL TREATMENT AREA CALCULATIONS FIGTIRE 4 _ SOIL TREATMENT AREA PLAN VIEW FIGURE 5 _ SOIL TREATMENT AREA CROSS SECTION FIGURE 6 _ DISTRIBUTION LINE CLEANOUT DETAIL ATTACHMENTS VALLEY PRECAST I,OOO GALLON, THREE-CHAMBER SEPTIC TANK DETAIL ORENCO EFFLUENT PUMP CURVE .....-2 - ...- 3 - ...- 3 - ...- 5 - 7 7 8 -8- -8- Kumar & Associates, lnc.Project No. 25.7 -11 4.02 INTRODUCTION This report provides the results of an onsite wastewater treatment system (OWTS) design for the proposed residence located on Parcel 13, High Aspen Ranch, l422High Aspen Drive, Garfield County, Colorado. The purpose of the report is to provide design details for the OWTS in accordance with Garf,reld County Environmental Health Department Onsite Wastewater Treatment System Regulations and Colorado Department of Public Health and Environmental Regulation #43. The services are supplemental to our agreement for professional services to Ted and Karen Miller dated January 9,2025. We previously performed a subsoil study for the proposed residence at the site and submitted our findings in a report dated February 25,2025, Project No. 25-7-114. PROPOSED CONSTRUCTION The residence will be a single-family structure over a walkout basement located on the lot as shown on Figure l. The residence will have three bedrooms, and the OWTS will be designed for three bedrooms. The proposed soil treatment area (STA) for the OWTS will be located to the south of the residence as shown on Figure l. Water service will be provided by an onsite well as shown on Figure l. The route of the water supply line to the residence will be outside of setbacks to the OWTS. If proposed construction is different than that described, we should be contacted to re-evaluate our design recommendations. SITE COh{DITIONS The lot was vacant with about two feet of snow on the ground surface at the time of our field exploration. The residence will be situated below a ridgeline trending down to the east. In the are of the residence and OWTS, the terrain is moderately sloping down to the south at grades of about 15 to 18%. Vegetation consists of oakbrush, grass and weeds. There is an onsite well, see Figure I for location. No other nearby water features were visible. SUBSURFACE CONDITIONS The field exploration for the OWTS was conducted on February 19,2025. Three profile pits (Profile Pits 1, 2 and3) were excavated with an excavator at the approximate locations shown on Figure I to evaluate the subsurface conditions for the planned soil treatment area for the OWTS. The pits were logged by a representative of Kumar & Associates. Logs of the profile pits are provided below. Kumar & Associates, lnc.Project No. 25-7-114.02 Depth USDA Classification O-ly2' 1lA',-5', TOPSOI; organic Loam, firm, moist, dark brown. SANDY LOAM; very gravelly, moderate blocky structure, dense, slightly moist, brorvn. t Disturbed bulk sample obtainedfrom 3 to 4 feet.o Bottom of pit @ 5 feet, where digging refusal with the excavator occurred.o No groundwater or redoximorphicfeatures observed at time of pit excavation. 1-L- Log of Profile Pit 1 Log of Profile Pit 2 Log of Profite Pit 3 The soils encountered in the profile pits, below about I to l% feet of organic topsoil, consisted of very gravelly Saldy Loarn consisting primarily of basalt fragments in a sandy loam matrix. No free water was encountered in the pits nor indications of seasonal high groundwater observed at the time of the pit excavations. The results of a gradation/hydrometer analyses performed on a bulk sample of the soils is provided on Figure 2. The tested sample (minus No.10 size sieve fraction) classifies as Sandy Loam per the USDA system. No free water was encountered in the pits nor indications of scasonal high groundwater were observetl at the tiure of the pit excavations. Based on the subsurface conditions and the laboratory testing, the soils at the STA have been classified as Type 2 and R-l; Option I per State regulations, which equates to a long-term acceptance rate (LIAR) of 0.80 gallons per square foot per day for Treatment Level 3. OWTS ANALYSIS Based on the profile pit evaluations and our experience in the area, the soils contain greater than 35 percent rock-sized material and a sand filter on the natural soils will be needed for adequate Depth USDA Clasrification 0-IY2'TOPSOL; organic Loam, firm, moist, dark brown. lY2'-2'SANDY LOAM; very gravelly, moderate blocky structure, medium dense, slightly moist, grayish brown. O a Bottom of pit @ 2 feet, where digging refusal with the excavator occurred. No groundwater or redoximorphic features observed at time of pit excavation. Depth USDA Classification 0- 1'TOPSOI; organic Loam, firm, moist, dark brown l'-2'SANDY LOAM; very gravelly, moderate blocky structure, medium dense, slightly brown. o Bottom oJ'pit @ 2 feet, where digging refusal with the excavator occurred.o No groundwater or redoximorphic.features observed at time of pit excavation. Kumar & Associates, lnc.Project No. 25-7 -11 4.02 -3- treatment of the wastewater effluent. An aggregate bed overlying a minimum 2 feet thick sand filter will be used to provide adequate treatment of the effluent from the residence. The STA aggregate bed will be sized for 3 bedrooms using an LTAR of 0.80 gallons per squlre foot per day. There is adequate elevation difference from the ground floor of the residence down to the septic tank for gravity flow of the sewer effluent. The effluent will gravity flow from the residence to a septic tank for primary treatment and then be pressure dosed to the STA for dispersal and final treatment. The STA will consist of an aggregate bed over the sand filter. The route of the water supply line is not currently designed. The required setback to the water supply line from the septic tank is l0 feet, 5 feet for sewer and effluent lines, and 25 feet from the STA. We should be notified for additional recommendations if the water supply line is within these minimum setbacks. DESIGN RECOMMEIIDATIONS The design recommendations presented below are based on the proposed construction, the site and subsurface conditions encountered and our experience in the arca. A layout of the proposed OWTS components is provided on Figure 1. If conditions encountered during construction are different than those that are described in this report, we should be contacted to re-evaluate our design recommendations. SOIL TREATMENT AREA . The STA will consist of a I foot thick aggregate (gravel) bed that is 47 feet long by 12 feet wide (564 square feet) constructed over a two feet thick sand filter. The aggregate areasize is based on an LTAR of 0.80 gallons per square foot per day for Soil Type 3-TL3. o A pressure dishibution system will be used to dose the effluent to the STA at regular intervals. . Soil treatment area calculations are shown on Figure 3. o The sand filter material should meet the requirements of the current Garfield County OWTS regulations for "secondary sand media." ASTM C33 concrete sand is suitable. A sample of the sand media should be obtained within I month prior to installation for gradation analysis with the sample provided to us for testing, or the test results provided to us, for approval ofthe material. o The base of the excavations should be scarified prior to sand filter placement. r The sand filter material should be placed in lifts not exceeding 10 inches thick. Each lift should be bucket compacted until settlement ceases. Kumar & Associates, lnc.Project No. 25-7 -11 4.02 -4- o Distribution lines, consisting of 1.5-inch diameter Schedule 40 piping with s/:z-inch orifice holes drilled at 4-feet spacings, should be installed as shown on Figure 3. The first hole should be 6 inches from the manifold and the last hole should be 6 inches from the looped end. There should be a total of I I holes in each distribution line. 'l'he tlistribution lines should be installed level in the aggregate bed. The orifice holes shoulcl face down. o Orenco Orifice Shields, or equivalent, should be installed on the effluent distribution piping within the aggregate bed at each orifice location to limit potential masking of the holes by the gravel. . The aggregate bed will consist of a minimum of 6 inches of aggregate below the distribution lines and extend to at least 4r/z rnches above the laterals for a total thickness of at least 1 foot. The aggregate should consist of clean, open graded gravel which may rango in size fromYz inch to 2Yzinches. Minus lYz"-size drain gravel is suitable. o The bed should be oriented lengthwise along the ground contours to minimize soil cut and cover. o Prior to placement of the cover soil, a Hanes Geocomponents Pro Silver2 ounce/yard filter fabric, or equivalent, should be placed over the aggregate bed. Mirafi l40N or 160N filter fabric is not suitablc for this use. o I minimum of 12 inches and a maximum of 36 inches of cover soil should be placed over the aggregate bed. Backfill should be graded to deflect surface water away from the STA and should be sloped at 3 horizontal to 1 vertical or flatter. A shallow swale to divert surface water flow away from the srA may be needed upslope. I Disturbed soil should be re-vegetated as soon as possihle with a native grass mix. No trees, shrubs or other plants with deep roots should be planted on or near the STA as this may damage the system piping. o Four-inch diameter inspection ports should be installed vertically into each corner of the aggtegate bed. The inspection port piping should extend down to the sand filter and not be connected to the dishibution piping- The portion of the pipe that lies within the gravel should be perforated. The inspection ports should extend at least 8 inches above the finished ground surface or be protected in a valve box at finished grade. r The srA must be a minimum of 25 feet from any potable water supply lines. o The STA must be a minimum of 20 feet from the residence. o The STA must be a minimum of 100 feet from the onsite well. o The STA must be a minimum of 5 feet from the septic tank. r { plan view of the STA is presented on Figure 4 and a cross section of the STA is presented on Figure 5. Kumar & Associates, lnc.Project No. 25-7-114.02 a -5- Cleanouts are required at the end of each of the three distribution lines. See Figure 6 for the cleanout detail. OWTS COMPONENTS Recommended OWTS components provided below are based on our design details and our experience.with the specific component manufacturers. Equivalent components may be feasible but need to be approved by us prior to construction' Septic Tank o A Valley Precast 1,000 gallon, three-chamber septic tank (1,500 gallons total) should be used for primary treatment. The first two chambers of the tank will be utilized for treatment and settling, and the third chamber of the tank will contain the dosing pump. A detail of the tank is provided as an attachment. o An effluent filter should be installed in the tank outlet tee. r The tank must be a minimum of 5 feet from the residence. o The tank must be a minimum of 10 feet from any potable water supply lines. o The tank mustbe a minimum of 5 feet from the proposed STA. o The tank must be a minimum of 50 feet from the onsite well. o The tank must be set level. The excavation bottom must be free of large rocks or other objects that could damage the tank during placement. A road base or gravel bedding material may be needed to prevent tank damage during placement and act as a leveling course. . The tank lid must extend to final surface grade and made to be easily located. o Install the tanks with2 feet minimum cover soil for frost protection. Maximum tank soil cover is 4 feet. Sewer Pipe o The sewer line to the septic tank should not be less than the diameter of the building drains and not less than 4 inches in diameter. o The sewer pipe should have a rating of SDR35 or shonger. Schedule 40 PVC pipe is required beneath any driveway surfaces. . The sewer pipe should be sloped between 2Yo to 4a/o to help limit disturbance of solids in the tank and potential sewage bypass of the first chamber of the tank. If a steeper slope is needed, this can be accomplished with vertical step-downs in the sewer line. o A minimum 24 inches of cover soil should be provided over the sewer pipe. Paved areas, patios or other areas without vegetative cover may be more susceptible to frost and we recommend 48 inches of soil cover over the sewer pipe in these areas, and the pipe be Kumar & Associates, lnc.Project No. 25-7 -11 4.02 -6- insulated on top and sides with 2-inch-thick blue foam insulation board. If adequate soil cover is not possible, we should be contacted for re-evaluation prior to installation. o The sewer pipe should be bedded in compacted3/+-inchroad base or native soils provided that the native soils contain no angular rocks or rocks larger than 2Y, inches in diameter to help prevent settlement of the pipe. Sags in the pipe could cause standing elfluent to freeze and damage the piping. o Install cleanout pipes within 5 feet of the building foundation, where the sewer pipe bends 90 degrees or more and every 100 f'eet of sewer pipe. . All 90-degree bends should be installed using a 9O-degree long-sweep or by using two 45-degree elbows. o The sewer line location shown on Figure I is considered conceptual. We assume that there will be only one sewer line exiting the residence. It is the responsibility of the owner/contractors to locate all sewer line exit locations and connections to the septic tank. We should be notified if there are other sewer lines exiting the building. Effluent Transport Piping o 1.S-inch diameter Schedule 40 effluent transport piping should be sloped at2o/ominimum to drain to the STA from the tank. o The effluent transport pipe should be bedded in compacted3/a-inchroad base or native soils provided that the native soils eontain no angular rocks or rocks larger than 2/zinches in diameter to help prevent settlement of the pipe. Sags could cause standing effluent to freeze and damage to the piping. o I minimum l8 inches of cover soil should be provided over the effluent transport pipe. Paved areas, patios or other areas without vegetative cover may be more susceptible to frost' We recommend 48 inches of soil cover over the effluent pipe and insulation with at least 2 inches of rigid foam insulation in these areas. If adequate cover soil is not possible, we should re-evaluate the condition prior to installation. o The effluent pipe should be provided with at least 48 inches of soil cover and be insulated on tup and sides with 2-inch-thick foam insulation board. ' All 9O-degree bends should be installed using a 90-degree long-sweep or by using two 45-degree elbows. Effluent Pumping System o An Orenco PF5005, 1l5-volt, submersible effluent pump with a 1.5O-inch diameter discharge assembly, or equivalent, will be required for effluent pumping. o The maximum effluent transport distance from the pump discharge to thc manifold is estimoted to bc 30 fbct. Kumar & Associates, lnc.Project No. 25-7.114.02 -7 - o The elevation difference from pump discharge up to the manifold is estimated to be 5 feet. . The pump should be enclosed in an Orenco Biotube Pump Vault for effluent filtering and protection of the pump from vibration. o An equivalent pump must be capable of operating at223 gallons per minute at 12.5 feet of total dynamic head. A pump performance curve is provided as an attachment to this report. o The floats should be set to provide a dose volume of approximately 66 gallons. To achieve the desired dose volume, the upper (*ON") and lower ("OFF') floats should be set approximately 6Yz inches apart. o The flow differential between the first and last orifices is estimated to be 0.5%. o The high-water alarmfloat should be placed approximately 3 inches above the "ON" float in the dose tank. The high-water alarm must be wired on a separate electrical circuit from the pump. o An ls-inch diameter weep hole should be drilled in the effluent transport line prior to exiting the dose tank so the transport line can drain back into the dose tank after each pumping cycle. OWTS OPERATION AT{D MAINTENANCE The OWTS will require periodic inspection and maintenance to function properly. A properly designed, installed and maintained system can greatly increase its lifespan. The level of maintenance will vary depending on the complexity of the system and water use habits of the residents. We recommend that an OWTS Operation and Maintenance (O&M) Manual be developed. Depending on the complexity of the system, a contract with an OWTS maintenance provider may be prudent. Below are some basic recommendations for the OWTS O&M. OWTS HOUSEHOLD OPERATION o Use of high efficiency water fixtures is recommended to decrease the hydraulic load on the OWTS system. o Fix plumbing leaks immediately as this may cause a hydraulic overload of the soil absorption system. o Do not irrigate the area on top of or directly upgradient of the soil absorption field as this may cause a hydraulic overload. o Do not dispose of household waste down drains as this may clog or damage OWTS components. Examples of household waste includes: dental floss, cotton swabs, coffee grounds, paper towels, feminine products and many other kitchen and bath items. Kumar & Associates, lnc.Project No. 25-7-114.02 -8- Use of kitchen garbage disposals is not recommended. If a garbage disposal is utilized, kitchen wastewater should be screened thoroughly. Many kitchen solids are not decomposed in the septic tank and may cause increased tank pumping frequency. Do not dispose of household chemicals, greases, oils, paints, hot tub water or water softener backwash rn household drains. A separate drywell, if feasible, may be necessary for hot tub water or water softener backwash disposal. Limit the use of bleach as this may harm useful bacteria in the septic tank and soil absorption system. Liquid dishwasher and clothes washer detergent is recommended for households served by an OWTS. Clay substances used as fillers in powder detergents may result in clogging of the soils absorption system. OWTS MAINTENANCE o Inspect the septic tank, Biotube pump vault, effluent pump, and STA at least annually for problems or signs of failure. o The effluent filter for the tank should be cleaned at least annually by spray washing solids into the first chamber of the septic tank. o The septic tank should be pumped and cleaned every 3 to 5 years depending on use. Longer pumping intervals may increase the amount of solids that reach the STA, which may shorten its life span. r Pumping of the septic tank should take place when the level of the sludge and scum layers combined take up 25 to 33Yo of the capacity of the first chamber of the tank. OWTS CONSTRIICTION OBSERVATION The Garfield County Environmental Health Department requires that the designer of the system provide a record drawing and certification of the OWTS construction (As-Built inspection). We should be provided with at least 48-hour notice prior to the installer needing the inspections. Prior to issuance of our certification letter, we require observation of all system components prior to backfrll. The rturrrber of site visits required for the inspection will depend on the installer's construction schedule. We should be provided the tank inspection report prior to or at the time of our inspection. LIMITATIONS We have conducted this design in accordance with generally accepted engineering principles and practices in this area at this [ime. We make no warrant5r either expressed or implied. The recommendations provided in this report are based on the site conditions, profile pit evaluations and soil texture analysis, the proposed construction and our experience in the arca. yaiatrons in o a a a Kumar & Associates, lnc.Project No. 25.7 -11 4.02 -9- the subsurface conditions may not become evident until excavation is performed. If conditions encountered during construction appear different from those described in this report, we should be notified so that re-evaluation of the recommendations may be made. This report has been prepared for the exclusive use by our client for design purposes. We are not responsible for technical interpretations by others of our infonnation. As the project evolves, we should provide continued consultation and field services during construction to review and monitor the implementation of our recommendations, and to veriff that the recommendations have been appropriately interpreted. Significant design changes may require additional analysis or modifications to our design. It is our opinion that the designed location of the OWTS components does not violate any setback requirements of the current Garfield County Regulations. Below is a table of common minimum horizontal setbacks to OWTS components. Refer to the Garfield County Regulations for a complete list of required setbacks. We recommend the OWTS component locations be surveyed by a Professional Colorado Land Surveyor. Table I - Common Minimum Horizontal Setbacks from OWTS Please contact us for any necessary revisions or discussion after review of this report by Garfield County. If you have any questions, or if we may be of further assistance, please let us know. Respectfully Submitted, Kumar & Associates, Inc. {Annu lfh}rt, Shane M. Mello, StaffEngineer Reviewed by: David A. Young, P SMMlkac Cc: Brad Jordan Wells lVater Supply Line Occupied Dwelling Lined Ditch Lake, Irrigation Ditch, Stream Dry Ditch or Gulch Septic Tank 20'l0'50'25',t5STA100'25', l0'Septic Tank 50'10',5 10'50' 5'0'10'50'l0'Buitdine Sewer 50 Kumar & Assoclatee, lnc.Proj,ect No. 2$7-114.02 PROPOSED THREE BEDROOM RESIDENCE OUT .' PROPOSED 1,000-GALLON, THREE-CHAMBER EPTIC TANK WITH DOSING PUMP INSTALLED IN THIRD CHAMBER. C k J6'PROFILE PIT 1 vAuJ6' ,IALL NERED J6. 8A]LDER ,tAus PROFILE /PtT 3/ 'a/ ,IWel'l PROFILE Ptr 2 I t soi L TREATMENT AREA (ST e) CONSISTI NG OF GRA VEL SETBACK WELL TO (AGGREGAT E) BY BE D THAT S -FEET wlD E 4 7 FEET LONG 1 00' OVER 2 FEET THIC K SAN D FILTER ( STA rO '.: E' {c /. a-?h- <. \\ 20: EETSCALE-F 40 25-7 -114.02 Kumar & Associates OWTS SITE PLAN Fig. 1 HYOROMETER ANALYSIS SIEVE ANALYSIS nuE mtxos 6VN !e!1f, dt{ 24 HRS 7 HRS l TINI u.5- failoNo s&Es SQUASE OPilIXGS too 90 ao 70 ao a E50 H & 50 20 to o o to 20 30 0 50 60 70 & 90 too ? 152 OF PARTICLES IN MILLIMETERS CLAY COBBLES mm .02 .05 .l SAMPLE OF: VERY GRAVELLY SANDY LOAM FROM: PROFILE PIT I AT 5 TO 4 FEET .25 .5 I 2mm 5 76 ENTIRE SAMPLE PARTICLE SIZE DISTRIBUTION % COBBLES 0 GRAVEL 52 SAND 2A SILT 13 CLAY 7 PORTION OF SAMPLE PASSTNG #10 SIEVE PARTICLE SIZE DISTRIBUTION X SAND 59 SILT 26 CLAY 15 TOTAL SAMPLE RETAINED ON f,10 SIEVE: 52% PERCENT OF ITATERIAL RETAINED ON #1O SIEVE PASSTNG 3/1' SIEVE 37% NOTE: Hydrometer Anolysis wos performed on o bulk somple followlng scrosnlng ot oll mot€rlol lorger thon lhe #10 sieve (2.0 mm) per USDA guidelines. Thos6 losl rosulls opply only lo lho somDl.s which wara tcslld. Th! lcsllig rcport lhqll nol br rcprcduccd, oxcopl ln tull, wllhout lhr wrlllon opprcvol of Kumor & Agsocloloi, lnc. sieve onolysl3 hstlng 19 perfomod ln q@ordonco wlth ASTM D422. ASTI, Cl36 otrd/or ASTM Oll4O. GRAVELSILTSAND COARSEV. FINE FINE MEDIUM co.v- co,FINE MEDIUMFINEco. GRAIN SIZE (-m)SIEVE SIZE % FINER 127.OO 5 100 76.00 100 38.1 0 1-1 /2"100 19.05 3/1"67 9.50 3/8"59 1-75 #1 56 2.OO *10 I 1.00 *18 11 0.50 #35 5E 0.25 #60 5rt 0.1 06 *1 40 26 0.053 *270 20 GRAIN SIZE (-m) TIME PASSED (min)% FINER 0.057 19 0.019 4 r6 0.009 t9 13 0.005 60 10 0.002 /+55 7 0.001 t 5it5 6 25-7 -114.O2 Kumar & Associates USDA GRADATION TEST RESULTS Fig. 2 OWTS SOil TREATMENT AREA CATCULATIONS In accordance wth the cunent 2018 Eagle County Onste Wasteuater Trcatment System Regulatbns, the absomtbn arca was calcubted as folorrrs: CALCULATIOI{ OF OWIIT DESIGI{ FIOW: q = (F)(N) WHERE: Q = DESIGN FLOW F = AVEMGE FLOW PER PERSON PER DAY B = NUMBER OF BEDROOMS N = NUMBER oF PERSONS: 2 PERSoNS PER BEDROOM FoR FIRsr 3 BEDROOMS AND 1 PERSON PER BEDROOM FOR EACH ADDITIONAL BEDROOM 75 GATIONS PER DAY 3 BEDROOMS 6 PERSONS 45O GALLONS PER DAY CALCULATION OF OWTS TREATMENT AREA: MINIMUM SOILTREATMENT AREA = Q + SOIL LTAR p= $= [\= Q= WHERE: Q= SOIL LTAR (SOILTYPE 2-TEl) = MINIMUM AREA = OWTS DESIG 1{ TREAT}.I El{T AREA: BED LENGTH = BED WIDTH = TOTAT SOII TREATMENT AREA = 450 GAII-ONS PER DAY 0.80 GATIONS/Frz7p4y 563 SQUAREFEET 47 FEEI 12 FEET 564 SQUAREFEET 25-7-114.02 Kumar & Associates SOIL TREATMENT AREA CALCULATIONS Fis. 3 1.5 INCH DIAMETER PERFORATED SCH 40 PVC DISTRIBUTION LATERAL WITH %z INCH DIAMETER ORIFICE HOLES SPACED AT 4 FEET INTERVALS. FACE PERFORATIONS DOWN. FIRST ORIFICE TO BE 6 INCHES FROM MANIFOLD AND LAST ORIFICE TO BE 6 INCHES FROM LOOPED END (1 1 ORTFTCES PER LATERAL). INSTALL ORENCO ORIFICE SHIELDS AT EACH ORIFICE. CLEANOUT INSTALLED AT THE END OF EACH DISTRIBUTION LATERAL. SEE FIGURE 6 FOR DETAI 47' 41' 1.5 1NCH DIAMETER NON_PERFORATED SCH 40 PVC ENT TRANSPORT PIPE SLOPED AT 2% MINIMUM TO DRAIN TO FIELD. 1.5 INCH DIAMETER NON_PERFORATED 40 PVC MANIFOLD PIPE INSTALLED LEVEL. 4 INCH DIAMETER PVC OBSERVATION PORTS INSTALLED TO THE BASE OF THE AGGREGATE. THE PORTION OF THE PIPE THAT LIES IN THE AGGREGATE SHOULD BE PERFORATED. INSTALL PORTS IN EACH CORNER OF THE AGGREGATE BED. REMOVABLE LID TO BE PLACED ON TOP OF PIPE. PIPE MUST STICK UP AT LEAST 8 INCHES ABOVE FINISHED GRADE OR BE PLACED AT GRADE IN AN ACCESSIBLE VALVE BOX. 1.5 INCH DIAMETER NON-PERFORATED SCH 40 PVC LOOPE END PIPE INSTALLED LEVEL.1 FOOT THICK AGGREGATE BED PLACED ON 2 FEET THICK SAND FILTER 10 0 10 SCALE_FEET NOTES: 1. AGGREGATE SHOULD BE A CLEAN, GRADED GRAVEL RANGING lN SIZE FROM ,4 INCH to 2k INCHES. 1/u" DRAIN GRAVEL IS SUITABLE.2. SECONDARY SAND MEDTA SPECTFICATTONS (CONCRETE SAND rS SUITABLE FOR THIS APPLICATION) EFFECTIVE SIZE: 0.15-0.60 MM UNIFORMITY COEFFICIENT: 3 7.O PERCENT FINES PASSING #200 SIEVE: 3 3.03. SAND SHOULD BE PLACED IN 10 INCH LIFTS ON SCARIFIED NATURAL GROUND. 4. CARE SHOULD BE TAKEN BE THE CONTRACTOR TO AVOID COMPACTION OF THE NATIVE SOILS IN THE SOIL TREATMENT AREA.5. FILL PLACED OVER THE SOIL TREATMENT AREA SHOULD BE PROPERLY BENCHED INTO THE HILLSIDE. 6. ALL PIPING SHOULD HAVE A RATING OF SCHEDULE 40. 7. CHANGES TO THIS DESIGN SHOULD NOT BE MADE WITHOUT CONSULTATION AND APPROVAL BY KUMAR & ASSOCIATES-8. REFER TO THE GARFIELD COUNTY ONSITE WASTEWATER TREATMENT SYSTEM REGULATIONS FOR OTHER APPLICABLE SPECIFICATIONS. 25-7 -11 4.02 Kumar & Associates SOIL TREATMENT AREA PLAN VIEW Fis. 4 HANES GEOCOMPONENTS PRO SILVER FILTER FABRIC, OR EQUIVALENT. OVER AGGREGATE BED. 12'' THICK LAYER OF 1.5'' SIZE AGGREGATE W]TH 6'' BELOW AND 4.5,' ABOVE DISTRIBUTION PIPES. 4'' DIAMETER OBSERVATION PORT IN IRRIGATION BOX (TYPTCAL) 1.5" SCH 40 DISTRIBUTION LATERAL MINIMUM 12,' COVER SOIL 2' THICK SAND FILTER NATIVE SOILS 2, BED SCARIFY UPPER 3'' PRIOR TO SAND PLACEMENT. Notes: 1. Diskibution lateral piping should be installed level in aggregate bed on iop of 2 leet of sand filter. The base and sidewalls of the bed should be scarified prior to sand placement. 2. Care should tre laken by the contractor to avoid compaction of the native soils in the bed. 3. Changes to this design should not be made without consultation and approval by Kumar & Aseociatoe. 2 SCALE-FEET 25-7 -11 4.42 Kumar & Associates SOIL TREATMENT AREA CROSS_SECTION Fig. 5 lnstqll 6" volve box of groun surfoce Bockfill volve box to bollo Ground Surfoce of cop wiih onsile soil .5" sch. 40, threoded cop 1.5" Sch. 40, 90' or 9-sweePlwo 45' elbows Notes NOTTO SCALE 1. All piping, fittings and valves should be Sch. 40 PVC. 2. lnstall distribution line cleanouts at the end of each distribution line. 25-7 -114.A2 Kumar & Associates DISTRIBUTION LINE CLEANOUT DETAIL Fig. 6 {OOO Gallon Top Sealn - 3GP wlth Hlgh Head Pumpttfir t 'MT€GP{III ({5OO c.Ibn Totd Volumc} DESIGN NOTESo Deslgn per performonce test per ASTII cl227 o Top surfoce oreo 62.3 ftro fc O 28 doys; concrete = 6,O0O PSI Min. lnstollotion:r Tonk to be set on 5'min. sond bed or peo grovelo Tonk to be bockfilled uniformly on oll sides in lifts less thon 24' ond mechonicolly compocted. Excowted moterlol moy be used for bockfill, provided lorge stones ore removedo Exco\rotion should be dewotered ond tonk filled with woter prior to beingput ln servlce for inetollotion wlth woter toble less thon 2' below grodeo Meets C1644-06 for resillent connactorso lnlet ond Outlet identified obove pipeo Delivercd complete with intemol piping. Control Ponel to bs mounted in sight line of tonke 4' Moximum bury depth Clrlcci lfitnrn Ra.rlbtnRbssbffi Dhsr$ orAry ]Lbli RD.lS-t Section View Rrnp:o lowsrTSSand itnplon*dlluont$dtybf#o GomC$frtaldon(wlrhg,prel,mortrgild r0rtrppmoedra)o Gonpbbureiarily Net Top View l"6t il tl FI i -' -----ii rll( ;ilDlir : 1 Bod ALLUV'AE LI. IJUIT I (Bosed on Woter Toble) IVAIER TABLE ALLOWAELE FAR1H FII I o -o'3-o' t'- o'5'- 0" 2'-O'c-0" 3'- 0'4'-0" DRY 4'- 0" *Seryrbe contlaicts available far maintenance* r6l 1 1 l. r I I Phono: 710€95t70lFu 719-S5-0'727 Wcbdb: utww.rrd$prc6.om Elrnil: Pump Selection for a Pressurized System - Single Family Residence Proiect 25-7-114.02 / Parcel 13, High Aspen Ranch Parameters 300 Discharge Assembly Size Transport Length Transport Pipe Class Transport Line Size Distributing Valve Model Max Elevation Lift Manifold Length Manifold Pipe Class Manifold Pipe Size Number of Laterals per Cell Lateral Length Lateral Pipe Class Lateral Pipe Size Orifice Size Orifice Spacing Residual Head Flow Meter 'Add-on' Friction Losses Calculations 1.50 30 40 1.50 None 5 6 40 1.50 3 41 40 1,50 5132 4 5 None 0 inches f6et inches feet feet inches feet inches inches feet feet inches feet 200 250 150 100 50 PumpData 0510 15 20 25 Net Discharge (Spm) 30 35 40 ooIL Io !tooE .9 Er!E o a6 P Minimum Flow Rate per Orifice Number of Orifices per Zone Total Flow Rate perZone Number of Laterals per Zone o/o Flow Difierential lsulast Orifice Transport Velocity Frictional Head Losses 0.68 33 22,3 0.5 3.5 gpm gpm o/o frs Loss through Discharge Loss in Transport Loss through Valve Loss in Manifold Loss in Laterals Loss through Flowmeter .Add{n'Friclion Losses Pipe Volumes 1.5 0.9 0.0 0.1 0.1 0.0 0.0 feet feet feet feet feet feet feet 0 Vol of Transport Line Vol of Manifold Vol of Laterals per Zone Total Volume Minimum Pump Requirements 3.2 gals 0.6 gals 13.0 gals 16.8 gals PF3005 High Head Effiuent Pump 30 GPM, 1/2HP 115123OV 1A 6OHZ.200Y 30 6OHz Design Flow Rate Total Dynamic Head 22.3 12.5 gpm feet g" t-:.Ts System Curve:- Pump Curve: * Pump Optimal Range:- f,1 Operating Point: w o Design Point: M